MATERIAL/EQUIPMENT

S/N Item Unit Cost No. of Days


1 UTM Scanner 50k 15
2 Calibration Block 5k 15
3 Couplant(2 litres) 20K(L/S) Nil
4 Brass Wire Brush(2) 20K(L/S) Nil
5 Paint Marker(5) 20K(L/S) Nil
6 Camera 5K 15
7 Laptop 10K 15
8 Gas Detector 7K 15
9 Spade(2) 5K Each 4
10 Ladder(where appliable) 7K 15
11 Safety Harness(1) 7K 15
12 Industrial Rag 20K Nil
13 Reporting 100K Nil

S/N Personnel Unit cost No. of days


1 Lead UT Tech 70k 15
2 Asst UT Tech 50k 15
3 2 Laborers For Escavation 30k 4
Total Cost
750,000
75,000
20,000
20,000
20,000
75,000
150,000
105,000
40,000
105,000
105,000
20,000
100,000

Total cost
1050000
750000
240000