DATA SHEET

PILE INSTALLATION RECORD


Chainage ; 1100 Km
Structure Name ; AL
Pile No ; 2
Ground Elevation ;
Pile cutoff level ;
Total Pile Depth = ________
Pile Tip level ;
Date & Time
Start of Drilling ;
Completion of Drilling ;
Start of Concreting ;
Completion of Concreting ;

Cement
Grade of Concrete Sand 10 mm 20 mm 40 mm Admixture
;
M-

Total Depth
MS Steel liner (8 mm) width 1000 1250 1500 of liner
;
No of liners used

DESCRIPTION
PILE DEPTH
Sand/Clay Soft rock Hard Rock
Signature of Site Engineer