HoliDes Y3 Review – initial feedback

Preliminary findings – see technical review report for full details

Airbus Defence and Space


(Friedrichshafen) 29+30 Septmeber

Patrick Vandenberghe - PO

Holides Y3 review 30/09/2016 1


Overall Impressions

• Review meeting was well organized and planned


– Thanks to Airbus for the hospitality
• Demonstrations showed very well what was
achieved.
• Technical progress is excellent
• Project objectives have been achieved
• Milestones 4 and 5 achieved
• Y3 Deliverables are OK
– (some additions would be usefull)
• Project management looks excellent
• Vey good cooperation in the consortium
Holides Y3 review 30/09/2016 2
Achievements

• Applied RTP/IOS/PB concept to the HF domain


• Extended these with HF specific additions
• Many MTT’s
• Platform builder is an excellent result
• Recommendations have been addressed very well
• Baseline well defined
• Good dissemination activities
– Website is excellent

Holides Y3 review 30/09/2016 3


Recommendations

• Final report
• Exploitations plan clarifications
– Specify which MTT’s will be exploited by which partner (owner)
– Common exploitation plans
– List of patents
– Sustainability of the PB builder and tool repository
• D3.7 Annex IV missing (matrix?)
• D4.6 public – toc not correct