TENDER: RUMANZA GOLF COURSE, DHA MULTAN

Labour Rates

Sr. No. Labor type Unit Rate (Rs.) Remarks

1 Excavation & Disposal Cft


2 Disposal of surplus earth Cft
3 Cleaning & Grabing Cft
4 Back Filling
a).Granular Back Fill Cft
b). Common Back Fill Cft
4 Mass Grading Cft
5 Grading of Stockpile Area Sft
6 Steel Fixing , Cutting/Bending/ Ton
7 Steel Loading / Unloading Ton
8 Steel Stacking Ton
9 Formwork Sft
10 Brick Masonry Sft
11 Plaster 1/2" thick & 3/4" thick Sft
Laying of Pitching Pabbles 1/2" thick & 3/4"
12 Sft
thick
13 Laying of CC Pavers 50 mm thick 7000 psi Sft

14 Laying of Pre Cast PCC Kerb Stone Rft


Fixing of Wire netting, Iron Galvd
15 Sft
50mmx50mm 12 SWG
16 Concrete Pouring
a Batching Cft
b Transit/Shifting, Cft
c Pumping Cft
d Vibrating, Finishing, Curing Cft
e T&P Batching Cft
f T&P Pumping Cft
g T&P Transit, Shifting Cft
17 Finishing Grade Sft
18 150 mm Thick compacted aggregate Cft
19 Pre-Cast Gutter Kerb Rft
20 Compacted Sub Grade Cft
21 37 mm Thick Terrazzo Sft