PLUMBING ABBREVIATIONS PLUMBING VALVE SYMBOLS GENERAL PLUMBING SYMBOLS PLUMBING PIPING SYMBOLS
A A
A/E ARCHITECT / ENGINEER DIRECTION OF PIPE PITCH (DOWN) DOMESTIC COLD WATER, COLD WATER
GLOBE VALVE
AD AREA DRAIN NC NORMALLY CLOSED
AFF ABOVE FINISH FLOOR NG NATURAL GAS DIRECTION OF FLOW DOMESTIC HOT WATER, HOT WATER
0
AFG ABOVE FINISH GRADE NPW NON POTABLE WATER CHECK VALVE
AG AIR GAP NTS NOT TO SCALE ANCHOR DOMESTIC HOW WATER RETURN
6"
AP ACCESS PANEL
O2 OXYGEN REDUCER OR INCREASER MEDICAL AIR
ANGLE GLOBE VALVE
BFP REDUCED PRESSURE BACKFLOW ORD OVERFLOW ROOF DRAIN
PREVENTER OVFL OVERFLOW ECCENTRIC REDUCER MEDICAL VACUUM
BTU BRITISH THERMAL UNIT
2
DW DISHWASHER
DWH DOMESTIC WATER HEATER RD ROOF DRAIN NATURAL GAS
6"
M METER
MBH 1000 BTUH EQUIPMENT ABBREVIATION (PUMP)
PUMP NO. 3
0
P-3
E E
4
0
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
PLUMBING LEGENDS AND ABBREVATIONS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 ALK CDL
Revisions: Date 10 MARCH 2017 Dwg. 563 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
GENERAL NOTES:
1. SEE SPEC 22 40 00 PLUMBING FIXTURES FOR FIXTURES THAT
A REQUIRE THERMOSTATIC MIXING VALVES A
2. DOMESTIC WATER SUPPLY PIPES TO INDIVIDUAL SINKS AND
SHOWERS ARE 1/2"
0
VEST
101-A
P-801
FAMILY
103
OPEN OFFICE
1
# KEYNOTES:
B 104 B
3/4" 1. SEE CIVIL FOR CONTINUATION
2"
105 108
P-103 106
6"
HAC DWS UP 1
3/4" THROUGH PL501
LOBBY / REC 102
1 1/2" SLAB
101 1/2" MECH
CORR 109
WH-1
4
111
2" CP-1
CWS/HWS THROUGH VEST
1" 1 1/2" 3/4"
SPACE ABOVE CEILING 1/2" 110
P-609
C C
3/4" 1/2" HAC
2" P-401 P-401
1/2" 1/2" TOILET 112
P-528 1 1/2"
116 P-502 P-801
P-203
1/2"
P-103 P-103
0
P-404 P-404
OPS
P-528
P-404 P-404 117
P-103 P-203
2"
P-103
4
P-103
WOMEN P-103 P-103
OP STOR TOILET LUNCH
121 1 1/2"
GS LOC MULTI / MEETING 114 115 113
D 119 ROOM D
P-801 118
MEN VEST
120 101-B
0
E E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T DOMESTIC WATER SUPPLY Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
1
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 CLB CDL
Revisions: Date 10 MARCH 2017 Dwg. 564 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
GENERAL NOTES:
1. ALL WASTE AND VENT LINES ON THIS SHEET 2" UNLESS
A OTHREWISE NOTED A
0
6"
SANITARY
SEWER TOTAL
49.5 DFU 1
2
2-WAY CO
AT GRADE VEST
KEYNOTES:
101-A FAMILY OPEN OFFICE #
4" RD
B TO DAYLIGHT
103
4"
104 B
1. SEE CIVIL FOR CONTINUATION
2"
FD-C DATA
1 1/2" DIR STOR ELEC MECH
1 1/2" FD-C 107
0
HAC FD-C
LOBBY / REC 102
101 4" 4"
4
WCO
CORR
2" VEST
4" 4" 111
C 4" 4"
110 C
4" FD-C
TOILET 4" 1 1/2"
2 VTR
WCO 116 2" WCO
FD-C HAC
FD-C
2" 112
0
WCO
OPS
1 1/2" 2"
117
WCO
2 1/2" VTR
2" FD-C
4
FD-C
WOMEN WCO 1 1/2"
OP STOR TOILET LUNCH
121 4" RD
114 115 113
TO DAYLIGHT
D D
MEN VEST MULTI / MEETING
GS LOC ROOM
120 101-B
119 118
0
E E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T SANITARY SEWER AND VENT Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
1
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 CLB CDL
Revisions: Date 10 MARCH 2017 Dwg. 565 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
GENERAL NOTES:
1. ALL ROOF DRAIN LINES ON THIS SHEET 4" UNLESS OTHERWISE
A NOTED A
0
6"
2
UPPER LEVEL
ROOF DRAIN 4" RD LINE
0
LOWER LEVEL
ROOF DRAIN
1318 SF
FLAT ROOF
1/2 :12
4
1 :12
DRAIN
283 SF
C C
UPPER LEVEL
0
FLAT ROOF
ROOF DRAIN DRAIN
1159 SF 212 SF
D D
ROOF DRAIN TOTAL
AREA 2689 SF
0
E E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T ROOF DRAIN PLAN Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
1
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 CLB CDL
Revisions: Date 10 MARCH 2017 Dwg. 566 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
0
6"
2
# KEYNOTES:
B 1. SEE CIVIL FOR CONTINUATION B
0
6"
ROOF 1
3/4" 1 1/2" 1" 1 1/2" 3/4" 1" 3/4" 1/2" 4" 1 1/2" 2" VTR
2" 1 1/2"
2" 2"
1" 2 1/2" VTR
4
CEILING
CP-1
P-502 P-401
C 1/2" 1/2" 1/2" 3/4" 1 1/2" 1 1/4" 1/2" 1/2" 1/2" 1/2" 1/2" 1 1/2" 1 1/2" 1 1/2" P-609 1 1/2" C
2"
W 2"
P-404 WCO P-103
P-528 P-502 P-401 (2) P-203 P-103(2) P-103 P-401 P-502 P-502 P-401 (2) P-401 (2) P-103 P-103(2) P-103(2) P-404 P-404
P-203
FIRST FLOOR
WH-1 P-103 P-404
WATER
0
P-528
2"
8
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T PLUMBING SCHEMATIC AND ISOMETRIC VIEWS
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
1
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 CLB CDL
Revisions: Date 10 MARCH 2017 Dwg. 567 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
GENERAL NOTES:
1. SEE SPEC 22 40 00 PLUMBING FIXTURES FOR FIXTURES THAT
1000 GAL REQUIRE THERMOSTATIC MIXING VALVES
A PROPANE TANK A
2. DOMESTIC WATER SUPPLY PIPES TO INDIVIDUAL SINKS AND
SHOWERS ARE 1/2"
0
6"
2
UNDERGROUND
LP SUPPLY PIPE
# KEYNOTES:
1 HR / LINK STATION / 1. SEE CIVIL FOR CONTINUATION
INTERIOR WASH BAY COTR OFFICE
MEN WOMEN
B WORK AREA 2" 103 2. COMPRESSED AIR DROP FROM CEILING WITH 100' HANGING B
116 109 107 AUTOMATICALLY RETRACTING HOSE SPOOL. INCLUDE
P-801 1" QUICK CONNECT END ON HOSE.
3/4"
AIR COMPRESSOR, 3. COMPRESSED AIR DROP FROM CEILING WITH 100' WALL
3/4" VESTIBULE
0
LP SUPPLY
PIPE DWS UP FOREMAN
P-531
UH-9 1" UH-8 UH-7 UH-6 THROUGH 2" WH-2
G 105
SLAB
1 1/4" 3 3 3/4" 3 1/2" MECH
P-801 3/4" P-801 3/4"
3/4"
112
4
P-801
P-801 1
PL501
D D
VEST/ BOOT WASH/
LUNCHROOM / LOUNGE
HOLDING
108 106
0
E E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
MAINTENANCE
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T DOMESTIC WATER SUPPLY Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
2
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 CLB CDL
Revisions: Date 10 MARCH 2017 Dwg. 568 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
GENERAL NOTES:
1. ALL WASTE AND VENT LINES ON THIS SHEET 2" UNLESS
OTHREWISE NOTED
A A
0
6"
2
# KEYNOTES:
HR / LINK STATION / 1. SEE CIVIL FOR CONTINUATION
INTERIOR WASH BAY COTR OFFICE
MEN WOMEN
B WORK AREA 103 B
116 109 107
WCO WCO
VESTIBULE
0
STORAGE
FD-C
113 2"
2" 2 1/2" 3" VTR
1 1/2" CORRIDOR
1 1/2"
ELEC 102
VEHICLE AND 1 1/2" VTR
WCO 1 1/2" VTR
4
SANITARY
SEWER TOTAL EQUIPMENT STORAGE 2"
111 WCO
35.5 DFU 114 HAC
4" 4"
UP
4" 4" WCO
FCO FCO 2" FD-C 104
C 1 1/2" C
1
2-WAY CO 3"
WCO
AT GRADE R 2"
IT CLOSET
1 1/2" FD-S
6
FD-Y 110 3"
AE502.1
4"
0
1 1/2"
4" WCO FOREMAN
WCO
MECH 1 1/2" VTR
105
FD-C
112 3"
FD-C
4
2-WAY CO
AT GRADE
D 1
D
VEST/ BOOT WASH/
LUNCHROOM / LOUNGE
HOLDING
108 106
0
E E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
MAINTENANCE
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T SANITARY SEWER AND VENT Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
2
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 CLB CDL
Revisions: Date 10 MARCH 2017 Dwg. 569 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
ROOF
A A
1 1/4" 1" 2" 2" 1 1/2" 1 1/4" 3/4" 1" 1 1/2" 1 1/2" 1" 1/2" 3/4" 1/2"
3/4" 1/2" 1 1/4"
0
1 1/4"
CP-2
6"
CEILING
3/4" 3/4" 3/4" 1/2" 3/4" 1 1/4" 1/2" 1/2" 1/2" 1 1/4" 1 1/4" 1 1/4" 3/4" 1/2" 3/4" 1/2" 1 1/4" 3/4" 3/4" 3/4" 1/2" 3/4"
W
2
P-801 P-801 P-801 (2) P-609 P-521 P-707 P-524 P-401 P-401 P-103 P-103 P-103 P-801 P-401 P-801 P-401 P-103 P-702(2) P-203 P-203 P-502 P-801
FIRST FLOOR
WH-2
# KEYNOTES:
WATER
METER 1. SEE CIVIL FOR CONTINUATION
B 1 2" B
0
DOMESTIC SUPPLY
6"
1 SCHEMATIC LAYOUT
PL102.3 SCALE: NTS
4
C C
4"
P-609 2 1/2"
1 P-521 2"
WCO
0
2" P-103
P-103
P-401 P-203 P-702
WCO WCO P-401
P-702
WCO
D 1 1/2" P-524 2"
D
4" P-103
4"
FCO
3" 2"
2" 2" P-401 1 1/2" VTR
0
2"
1 1/2" VTR
1 1/2" VTR
2"
WCO
P-502
P-531 WCO
8
2"
E E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
MAINTENANCE
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T PLUMBING SCHEMATIC AND ISOMETRIC VIEWS
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
2
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 CLB CDL
Revisions: Date 10 MARCH 2017 Dwg. 570 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
GENERAL NOTES:
1. SEE SPEC 22 40 00 PLUMBING FIXTURES FOR FIXTURES THAT
REQUIRE THERMOSTATIC MIXING VALVES
A A
2. DOMESTIC WATER SUPPLY PIPES TO INDIVIDUAL SINKS AND
SHOWERS ARE 1/2"
0
6"
2
# KEYNOTES:
B 1. SEE CIVIL FOR CONTINUATION B
SLAB 105
6"
P-801
1
3/4" PL501
P-502 WH-3
1 1/2"
1/2" 1
STOR
4
P-528 106
LOUNGE 3/4"
HALL
103
C 104 C
LOCKERS
GUN SAFE 3/4" 107
102 1 1/2"
CWS/HWS THROUGH
0
E E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
HONOR GUARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T DOMESTIC WATER SUPPLY Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
3
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 CLB CDL
Revisions: Date 10 MARCH 2017 Dwg. 571 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
GENERAL NOTES:
1. ALL WASTE AND VENT LINES ON THIS SHEET 2" UNLESS
A OTHREWISE NOTED A
0
6"
2
# KEYNOTES:
B B
1. SEE CIVIL FOR CONTINUATION
1
SANITARY
0
AT GRADE
WCO
MECH
FD-C 105
4"
1 1/2"
STOR
106
4
1 1/2" 1 1/2"
VEST FD-C FD-C
101 CO CO
4
D D
E E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
HONOR GUARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T SANITARY SEWER AND VENT Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
3
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 CLB CDL
Revisions: Date 10 MARCH 2017 Dwg. 572 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
0
6"
2
# KEYNOTES:
B 1. SEE CIVIL FOR CONTINUATION B
0
6"
1 1/2" VTR
1 1/2"
3/4" 1 1/2" 3/4" 1 1/2"
ROOF 1 1/2"
2" VTR WCO
ALL VERT VENT
4
P-502 1
CEILING 1 1/2" P-528
1" 4"
C 1 1/4" 1 1/2" C
1/2" 1/2" 1/2" 1/2" 1/2" 3/4" 1 1/4" 4"
W P-103
P-203
P-401
P-528 P-502 P-103 P-401 P-401 P-401 P-203 P-103 WCO P-401
FIRST FLOOR P-401
4"
WH-3
0
WATER P-103
METER WCO
1 1 1/2" 4"
4
E E
4
0
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
HONOR GUARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T PLUMBING SCHEMATIC AND ISOMETRIC VIEWS
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
3
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 CLB CDL
Revisions: Date 10 MARCH 2017 Dwg. 573 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
WALL LINE
A TWO GANG A
ELECTRICAL BOX
VENT, AS SHOWN ON DRAWINGS W/STAINLESS STEEL
[300mm]
COVER PLATE
0
12"
SOLVENT WELDED FITTING, TYPICAL
6"
[861mm]
SPLIT GRAB BAR
2'-10 3/8"
WALL
B AIR GAP SEE ARCH. DWGS B
WATER LINE
FITTING
FROM METER WASTE/SOIL PIPE SIZE
AS SHOWN ON DRAWINGS
[975mm]
0
3'-3"
TYPICAL
6"
BODY, TYPICAL
OPENINGS
BOTTOM
[825mm]
[300mm]
COLD WATER TO
RELIEF
PVC RISER
2'-9"
TO
OF
FINISHED SYSTEM
(TYPICAL) OUT FITTING, 4" MAX.
FLOOR PIPE SUPPORT
18"
[450mm]
ELEVATION
2
CL WATER CLOSET
PL501 SCALE: NTS
DRAWINGS
1 BACKFLOW PREVENTER PIPING FINISHED WALL
PL501 SCALE: NTS
C C
FLOW SEE SPECIFICATIONS
FLOW FOR FIXTURE SPECIFICS
FINISHED FLOOR
PLAN
2-WAY CLEANOUT
0
3
CLAMP WATERPROOF
PL501 SCALE: NTS ELEVATION
MEMBRANE INSIDE OF
CEMENT BED NICKLE BRONZE DRAIN BODY
TILE FLOOR
ADJUSTABLE
STRAINER WATERPROOF
4 WATER CLOSET-MANUALLY OPERATED
LOOSE GRAVEL PL501 SCALE: NTS
MEMBRANE FAUCET SEE
CONCRETE FILL AT WEEP HOLES
4
LAMINAR FLOW
10 3/4"±
[269mm]
CONTROL DEVICE OUT SIDE
BYPASS
D GAS METER
D
CW OR BLDG.
SW 0-300 PSIG
0-300 PSIG WALL
[0-2000kPa]
[0-2000kPa]
ARCHITECTURAL DRAWINGS
N.C. G
[850mm]
WEEP HOLES LOOSE [200mm] STRAINER "LP IGNITER GAS IN
34"
CLEAN WEEPS KEY STOP USE FOR
EMERGENCY GAS
SAFETY SHUT-OFF EMERGENCY ONLY"
ESCUTCHEON OFFSET
VALVE HIGH PRESSURE SW.
WASTE
SET AT 2 PSIG [14kPa]
3'-6" [1.1M]
TRAP SUPPORT BRACKET (ANNUNCIATOR)
FINISHED
8
5 8
PL501 SCALE: NTS PL501 SCALE: NTS
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
PLUMBING DETAILS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 ALK CDL
Revisions: Date 10 MARCH 2017 Dwg. 574 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
SINK
P-521 SERVICE SINK 1 1/2 1 1/2 1/2 1/2 2 3 NO
KITCHEN SINK DOUBLE
P-524 1 1/2 1 1/2 1/2 1/2 2 4 NO
BOWL
KITCHEN SINK SINGLE
P-528 1 1/2 1 1/2 1/2 1/2 2 4 NO
B BOWL B
FLOOR MOUNTED MOP
P-531 2 1 1/2 1/2 1/2 2 3 NO
SINK
EMERGENCY
P-707 2 1 1/2 1 1/4 1 1/4 2 10 NA NO
SHOWER/EYE WASH
P-801 WALL HYDRANT NA NA 1/2 NA NA 2 NA NO
4
E E
4
0
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
PLUMBING SCHEDULES
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 ALK CDL
Revisions: Date 10 MARCH 2017 Dwg. 575 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
ABBREVIATIONS
2
GENERAL NOTES
DUCTWORK SYMBOLS
AHU AIR-HANDLING UNIT L LITER UP DN SUPPLY DUCT (UP & DOWN) 1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED
APD AIR PRESSURE DROP L/h LITERS PER HOUR CHASE OR ABOVE THE HARD SUSPENDED CEILING.
A L/m LITERS PER MINUTE UP DN EXHAUST DUCT (UP & DOWN) A
BD BUTTERFLY DAMPER L/s LITERS PER SECOND 2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT
BDD BACKDRAFT DAMPER LAT LEAVING AIR TEMPERATURE UP DN RETURN DUCT (UP & DOWN) SIZES ARE NET INSIDE DIMENSIONS.
BFP BACKFLOW PREVENTER LPG LIQUID PROPANE GAS
0
BTU BRITISH THERMAL UNIT LSD LINEAR SLOT DIFFUSER 3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS,
BTUH BRITISH THERMAL UNIT PER HOUR ROUND AND SQUARE 4-WAY CEILING DIFFUSERS DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND INSTALLED
LVR LOUVER
6"
CM CARBON MONOXIDE MERV MINIMUM EFFICIENCY REPORTING 5. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.
CO CLEAN OUT VALUE
D INCLINED DROP, IN DIRECTION OF AIR FLOW
CO2 CARBON DIOXIDE MM MILLIMETER 6. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING
COMP COMPRESSOR UNIT MVD MANUAL VOLUME DAMPER DIFFUSERS, REGISTERS, AND GRILLES.
COP COEFFICIENT OF PERFORMANCE VANED ELBOW (PROVIDE ALL SQUARE OR
B CR CEILING REGISTER NA NOT APPLICABLE RECTANGULAR ELBOWS WITH VANES EVEN IF 7. ALTITUDE-MECHANICAL ROOM FLOOR: 6000 FT. ABOVE SEA LEVEL (APPROX) B
CU CONDENSING UNIT NG NATURAL GAS SYMBOL IS MISSING)
CUH CABINET UNIT HEATER NGFM NATURAL GAS FLOWMETER 8. HANGARS SHALL BE ISOLATED BY TYPES OF ITEMS THEY SUPPORT. DUCTS INDEPENDENT FROM
NPSH NET POSITIVE SUCTION HEAD PIPES, CABLE TRAYS, ETC.
D DAMPER - AUTOMATIC NTS NOT TO SCALE VANED ELBOW (SHORT RADIUS)
0
D-3
DB
RELIEF AIR DAMPER
DECIBELS
OAG
OAI
OUTSIDE AIR GRILLE
OUTSIDE AIR INTAKE
STANDARD RADIUS ELBOW (LONG RADIUS)
DESIGN CONDITIONS
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS PSI POUNDS PER SQUARE INCH NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH) INDOOR OUTDOOR
10x8
DEG DEGREE OCCUPIED HOURS UNOCCUPIED HOURS
DF DIFFUSER R/E RETURN OR EXHAUST ROOM DESCRIPTION SUMMER WINTER
SUMMER WINTER SUMMER WINTER
4
F/SDPR COMBINATION FIRE SMOKE DAMPER SP GR SPECIFIC GRAVITY BACK DRAFT DAMPER LOCATION OPENING TIME CLOSING TIME
FA FREE AREA SPS STATIC PRESSURE SENSOR ADMIN 7 AM 4 PM
BDD
FC FLEXIBLE CONNECTION SR SUPPLY AIR REGISTER 8 AM 5 PM
PIC
FD FLOOR DRAIN SS STAINLESS STEEL
D FD FIRE DAMPER MAINTENANCE 7 AM 4 PM D
FPM FEET PER MINUTE T & PCV TEMPERATURE AND PRESSURE HONOR GUARD 7 AM 5 PM
FPS FEET PER SECOND CONTROL VALVE
FSTAT FREEZESTAT TAB TESTING, ADJUSTING, BALANCE
FT FEET TDH TOTAL DYNAMIC HEAD
FV FACE VELOCITY TSP TOTAL STATIC PRESSURE
PIPING SYMBOLS
0
TSTAT THERMOSTAT
GA GAUGE
GAL
GPH
GALLONS
GALLONS PER HOUR
UC
UH
UNIT COOLER
UNIT HEATER
REFRIGERANT LIQUID
DRAWING SYMBOLS
GPM GALLONS PER MINUTE REFRIGERANT SUCTION
VD VOLUME DAMPER (MANUAL OPPOSED DETAIL NUMBER
2
HAC HOUSEKEEPING AID CLOSET BLADE) DRAIN LINE
HB HOSE BIBB VFD VARIABLE FREQUENCY DRIVE H4 DRAWING NUMBER WHERE DRAWN
8
kg KILOGRAM
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
MECHANICAL LEGENDS AND ABBREVATIONS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 ALK CDL
Revisions: Date 10 MARCH 2017 Dwg. 576 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
GENERAL NOTES:
1. INSTALL CEILING REGISTERS A MINIMUM OF 12" FROM AN
EXTERIOR WALL.
A 2. PROVIDE A MINIMUM OF THREE TIMES THE FAN DIAMETER OF A
STRAIGHT DUCTWORK OFF THE SUPPLY AIR DISCHARGE
BEFORE ANY TAKEOFFS OR ELBOWS.
3. PROVIDE LOCKING QUADRANT VOLUME BALANCING DAMPERS
0
10X10
CD2(7) 70 ELEC DATA
70
8Ø
150 CF-2
2 EF-3 1 DIR STOR 107 108 # KEYNOTES:
0
105 106 6
CD1(3) 1. EXHAUST FAN ABOVE CEILING. DUCT TO ROOF CAP
6"
12X12
6Ø 30X16 OA 2. WALL MOUNTED UNIT HEATER
6Ø 100 CD3 EF-4 3. CO2 WALL SENSOR. EACH WALL MOUNTED CO2 SENSOR IS
20 60 CD1 4 5
LOBBY / REC 6Ø T S S TO INCLUDE PROGRAMMED CENTRAL CONTROL SYSTEM
8Ø CR1 MECH
101 40 ALARM SEQUENCE THAT ALERTS BLDG OPERATOR
CF-1 CR1 110 8Ø CR2 M 109
16X16
WHENEVER SENSOR DETECTED CO2 LEVEL EXCEEDS
110 6Ø
16X16
18X18
18X18
3 10Ø 1000PPM.
6Ø
CD2(3) CD3
4
12X12
14X12
6Ø
9X12
T 16X12 16X16
9X12
180 22x22 FD FD FD 65 SYSTEM ALARM SEQUENCE THAT ALERTS BLDG OPERATOR
1
1110 14X12 16X16 CD1 WHENEVER DETECTED OUTSIDE AIR RATE VARIES 10% OR
C 18X18 6Ø 2
VEST MORE FROM DESIGNED/PROGRAMMED SET POINT. C
18X18 T 75 110 5. OA AIR LOUVER, 30"W X 24"H. RA 36"W X 24"H. SEE ARCH
1 UH-1 ELEVATION AE201.1 FOR POSITIONING.
16X16 S CR1 CORR CD1 HAC
3 10Ø 6Ø 6. INSTALL SMOKE DETECTOR LISTED AND LABELED FOR
RISER 111 EF-2 CD3 CE3 112
14X12 325 30 INSTALLATION IN AIR DISTRIBUTION SYSTEMS.
CR1
9X12
12X12 3 6Ø 6Ø
24X12 12Ø CE1 CD1 CE1 CE1 S 20 70
0
6Ø 30 100 50 8Ø
8X8
55 165
65 2 175
8X8 CD1 CD1 CE3 DIFFUSER TYPE
OPS
6Ø 8Ø 12Ø NECK DIAMETER
EF-1 UH-2 CD1(2) 117
6X6
9Ø 12Ø 45 225 480 AIRFLOW
1 9Ø
4
E E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T MECHANICAL DUCTING PLAN
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
1
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 ALK CDL
Revisions: Date 10 MARCH 2017 Dwg. 577 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
GENERAL NOTES:
1. INSTALL CEILING REGISTERS A MINIMUM OF 12" FROM AN
EXTERIOR WALL.
A 2. PROVIDE A MINIMUM OF THREE TIMES THE FAN DIAMETER A
OF STRAIGHT DUCTWORK OFF THE SUPPLY AIR
DISCHARGE BEFORE ANY TAKEOFFS OR ELBOWS.
3. PROVIDE LOCKING QUADRANT VOLUME BALANCING
0
CE3 VESTIBULE
0
CE3 AT
12Ø EF-7 EF-6 CD3 CE1
CE1 101
2
CD1
6Ø
# KEYNOTES:
6"
480 16Ø 8Ø
24" AFF 12Ø 12Ø 8Ø 12Ø UH-4 105
35 1 6 1 EF-5 200
VEHICLE AND S 150 600 6Ø 1. EXHAUST FAN ABOVE CEILING (WHERE APPLICABLE). DUCT
S TO ROOF CAP
EQUIPMENT STORAGE 7 12Ø CR1
114 CORRIDOR 2. WALL MOUNTED UNIT HEATER
6Ø
CR2 CR2 3. NOT USED
CD1 CD1 102 70 HAC
8Ø 8Ø CD3 4. CEILING HUNG RADIANT HEATER. ROOF PENETRATION FOR
CF-4 CF-3 8Ø 6Ø
16Ø
4
150 130 8Ø CD1(2) 104 FRESH AIR INTAKE AND EXHAUST PER MFG'S
135 80
130 6Ø CD3 INSTRUCTIONS. ENSURE OPERATIONAL CLEARANCE IS
8 14X12 75
M 18X12 6Ø CE3 MAINTAINED TO ROLL UP DOORS, STRUCTURE, OTHER
C 40 6Ø EQUIPMENT AS REQUIRED BY THE MANUFACTURER. C
CE3 1 5 18X16 18X12 14X12 12X12 85 ANGLE HEATER REFLECTOR AS NEEDED TO PROVIDE HEAT
T
S ELEC 8Ø EF-8 T S
TO WORKING SPACE.
S 250 5. SET EXHAUST FAN CONTROL BY THERMOSTAT SET TO 90
110 CR2 6 CR1
CR1 CR1 DEG F.
18X16
6 8Ø 12Ø
CD3 8Ø 8Ø 6. CO2 WALL SENSOR. EACH WALL MOUNTED CO2 SENSOR IS
7 8Ø 125 585
200 80 TO INCLUDE PROGRAMMED CENTRAL CONTROL SYSTEM
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
MAINTENANCE
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T MECHANICAL DUCTING PLAN Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
2
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 ALK CDL
Revisions: Date 10 MARCH 2017 Dwg. 578 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
GENERAL NOTES:
1. INSTALL CEILING REGISTERS A MINIMUM OF 12" FROM AN
EXTERIOR WALL.
A 2. PROVIDE A MINIMUM OF THREE TIMES THE FAN DIAMETER OF A
STRAIGHT DUCTWORK OFF THE SUPPLY AIR DISCHARGE BEFORE
ANY TAKEOFFS OR ELBOWS.
3. PROVIDE LOCKING QUADRANT VOLUME BALANCING DAMPERS AT
0
B B
0
105
40 50
AHU-4
CD1 (2)
CU-4
12X12
8Ø
170 10X10 EF-9 STOR
# KEYNOTES:
12X12
CR1 1 106
4
8Ø
T
10Ø
C CD1 6Ø C
6Ø 25 LOCKERS
100 GUN SAFE CD1 107
102 6Ø
100
6Ø
0
CD1 CD1
CE1
2 6Ø 6Ø
8Ø
UH-5 200 55 40 CE3 DIFFUSER TYPE
VEST CE1 12Ø NECK DIAMETER
101 6Ø 480 AIRFLOW
4
100
MEN WOMEN
109 108
D D
E E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
HONOR GUARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T MECHANICAL DUCTING PLAN
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
3
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 ALK CDL
Revisions: Date 10 MARCH 2017 Dwg. 579 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
ANCHOR
BOLT (TYP)
L D
[25mm]
PIPE SLEEVE (5D, 3"
1"
A [75mm] MIN.)
5D
PIPE ANCHOR SCHEDULE
B B 2D BOLT
A D P C N S A
W
FLOOR PATTERN
[125mm]
D+[25]
5" MIN.
ONLY FOR STEAM & CONDENSATE BARRIER TYPE IS
L/10
STL PIPE OR REQUIRED FOR LOW
B PROVIDE DOUBLE SLAB COPPER TUBE TEMPERATURE PIPE) B
REINFORCING IN BASE AREA D=PIPE O.D.
SECTION A-A PROVIDE HIGH
COMPRESSIVE STRENGTH
(BASE POURED WITH FLOOR SLAB) INSULATION (9 PSF MIN.
0
D+
S=SIZE
[125mm]
C SADDLE
5" MIN.
L/10 DRILLØ=S+1/16" 5/16" P
DRILLØ=S+[2] [8] ADJUSTABLE CLEVIS HANGER TYPE 1 ADJUSTABLE CLEVIS HANGER TYPE
- SEE SPECIFICATIONS 43 - SEE SPECIFICATIONS
4
BAND
1-5/8" [43mm] 12 GAUGE
NOTES: CHANNEL OR 2"x2"x1/4"
[50x50x6.4mm] ANGLE
SMALL PIPE ANCHOR 1 1/2" - 4" SEE SPECIFER FOR DETAILED
[25mm]
1" MAX.
2
HANGER REQUIREMENTS
PIPE SLEEVE WHERE PIPE MH501 SCALE: NTS
SPECIFIED
4
NOTES:
FIRE-STOPPING mm THRU 20 25 32 40 50 65 75
MATERIAL RISER INSULATION PIPE IN. 7 7 7 9 10 11 12 14 16 17 19 22 23 25 27 28 30 32
0
BOLT (TYPICAL)
RISER TOS mm 2100 2100 2100 2700 3000 3400 3700 4100 4900 5200 5800 6700 7000 7600 8200 8500 9100 9600
FLOOR FIN GRADE
CLAMP
1'-4"
TUBING IN. 5 FT 6 7 8 8 9 10 12 13 14 16
SLAB - - - - - - -
mm 1500 1800 2100 2400 2400 2700 3000 3700 4000 4100 4900
WHERE
SPECIFIED RISER CLAMP. 1. ALL MECHANICAL EQUIPMENT FOUNDATION DIMENSIONS SHALL BE VERIFIED WITH MECHANICAL
EQUIPMENT SHOP DRAWINGS PRIOR TO FORMING.
BOTTOM CLAMP 2. ALL MECHANICAL EQUIPMENT SHALL BE CENTERED ON PAD.
REQUIRED AT 3. MECHANICAL UNITS SHALL BE PROVIDED WITH (1) 5/8" POST INSTALLED ANCHOR AT EACH CORNER.
ANCHOR POINTS
0
ELEVATION ONLY.
4 OUTDOOR CONCRETE EQUIPMENT BASE
3 SUPPORT/ANCHOR FOR PIPE RISERS MH501 SCALE: NTS
MH501 SCALE: NTS
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
MECHANICAL DETAILS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O N A L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 ALK CDL
Revisions: Date 10 MARCH 2017 Dwg. 580 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
MAIN FLOW 36 [900] ONE 1" [25] X 18 GA STRAP 420 [190] 144 [360]
SUPPLY MAIN
6"
DUCT SUPPLY 50 [1250] ONE 1" [25] X 16 GA STRAP 700 [317] 144 [360]
DUCT
60 [1500] TWO 3/8" [10]Ø RODS 1320 [598] 144 [360]
PROVIDE VOLUME TOP REGISTER
DAMPER 84 [2100] TWO 1/2" [13]Ø RODS 2500 [1133] 144 [360]
SUPPLY REGISTER TAKE-OFF
FLOW
2
AIR
PLAN VIEW LOAD RATED
COVER WITH HANDLE HANGER RODS FASTENERS
AND CHAIN RETAINER AIR
GASKETED AND FLOW BAND SAME SIZE
SUPPLY REGISTER
PRESSURE SEALED AS HANGER
OR BRANCH DUCT
B STRAP B
AIR SPLIT DUCT TAKE-OFF MAIN SUPPLY
FLOW
DUCT
PLAN VIEW
AIR
1/4 W OR 4" [100mm]
MIN. PROVIDE BAND
VOLUME
OVER 50" [1250mm]Ø 50" [1250mm]Ø & UNDER
0
DAMPER
6"
1. THE SUPPLY REGISTER TAKE-OFF MAY BE USED FOR UP TO 25% OF THE MAIN DUCT CFM. THE
4
BRANCH DUCT TAKE-OFF MAY BE USED FOR UP TO 15% OF THE MAIN DUCT CFM ANYTIME AND
UP TO 40% WHEN THE MAIN DUCT VELOCITY IS 1000 FPM [5.1 M/S] OR LESS. THE AIR SPLIT DUCT
3 ROUND DUCT HANGERS
TAKE-OFF SHALL BE USED IN ALL OTHER CASES AND MAY BE USED AT ANYTIME. MH502 SCALE: NTS
C C
2. SHOW ALL VOLUME DAMPERS ON FLOOR PLANS.
BRANCH DUCT
MAX.
INLET: 5'-0" MAX
15°
INSULATION SEE
LENGTH. 1/2" [15mm] ROUND
SPECIFICATION
30°
USE RIGID ELBOWS ROD PIN
STIFFEN BLADE
FOR CHANGE OF
EQUIPMENT
AS REQUIRED
.
.
D D
MAX5°
AX
DUCT OUTSIDE END BEARING
1
DIRECTION GREATER
M
THAN 45° AIR AIR AIR
INSULATION FLOW FLOW FLOW
STAND-OFF
X.
12"
DAMPER BLADE
MA
[300mm] SHEET METAL VOLUME DAMPER W/
15°
MAX.
SADDLE
30°
LOCKING QUAD
15°
HANDLE WITH
MAX
0
LOCKING
QUADRANT
.
TYPICAL DIFFUSER
CEILING INSIDE END BEARING DUCTWORK TRANSITION W/ DUCTWORK TRANSITION
OR REGISTER IN
LAY-IN CLG. EQUIPMENT IN DUCT PLAN OR SIDE VIEW
1/8" [6mm]
SIDE ELEVATION
CLEARANCE
SECTION PLAN OR SIDE VIEW
ALL AROUND
8
6
5 VOLUME DAMPER MH502 SCALE: NTS
MH502 SCALE: NTS
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
MECHANICAL DETAILS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O N A L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 ALK CDL
Revisions: Date 10 MARCH 2017 Dwg. 581 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
FLOW FLOW
MAIN SUPPLY FLOW FLOW
MAIN SUPPLY
A A
AIR MAIN EXHAUST OR RETURN
FLOW AIR
FLOW
45°
0
MA
X.
ROUND SHEET METAL SMACNA FIGURE 4-6 1/4W OR 4" [100mm]
6"
"D
FLOW
"
RIGID DUCT TO AIR
VD
FLOW
TERMINAL UNIT. PROVIDE VOLUME DAMPER
AIR
BRANCH DUCT AT EACH BRANCH DUCT
2
W
RIGID DUCT TO AIR TERMINAL
UNIT.
PLAN VIEW
B PLAN VIEW B
PLAN VIEW
3 EXHAUST OR RETURN BRANCH DUCTWORK
MH503 SCALE: NTS
2 ALTERNATE SUPPLY DUCT TAKE OFF
1 ALTERNATE SUPPLY DUCT TAKE OFF
0
SHEET METAL AS
4
SPECIFIED FOR
ALTERNATE 1" [25mm] FLANGE & HEM R SHALL
DUCTWORK.
POSITION EQUAL OR BE
BOLT ON 4" [100mm] CENTERS W
OF BOLT GREATER
C 1"x1/8" [25x3mm] BAND IRON 1 1/2" [40mm] C
THAN W.
POCKET SLIP R
FLEXIBLE MATERIAL AS
W2
SPECIFIED
DUCT
STANDARD RADIUS OR
LONG RADIUS ELBOW
0
WASHER 1/
2W
SHEET METAL AS 1 1/2" [40mm] MIN. TO 3" [75mm] MAX. R SHALL R SHALL
2/
3W
W1
FLANGED SPECIFIED FOR INSTALLED. 6" [150mm] NOMINAL WITH EQUAL OR BE EQUAL OR BE
CONNECTION DUCTWORK. MATERIAL TAUT GREATER GREATER
1/3W
ON FAN SIDE NOTE:
1/3W
THAN 1/3W. THAN 1/6W.
4
VANE
RECTANGULAR FLEXIBLE CONNECTION VANE
R
1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY
R
1/6W
SMACNA.
D 2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE D
5/16" [8mm] FLANGE REGARDLESS OF W DIMENSION. W W
2. ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS.
1/2" 1/2" 1 1/2"
ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED,
[15mm] [15mm] [40mm] 5 DUCTWORK SQUARE VANE ELBOWS
8
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
MECHANICAL DETAILS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O N A L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 ALK CDL
Revisions: Date 10 MARCH 2017 Dwg. 582 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
TOWARD DRAIN
PARTITION OR CHASE
"A" SLEEVE, NOTE 2
6"
CLEAN OUT
A
DRAIN
DAMPER COLLAR
[25mm]
PAN "A" TYPICAL DUCT
INSULATION EXTENSION INTEGRAL
[25mm]
INSULATION PART OF SLEEVE
2
B
1"
DIELECTRIC
FITTING DUCT
DAMPER,
GASKET NOTE 1
FLOOR SINK
B NOTE: ACCESS
B
1. CPVC PIPE MAY BE USED ONLY IF INDOORS, APPROVED BY LOCAL INSULATION PANEL DUCT
VA, AND DOES NOT PASS THROUGH RATED BARRIERS. NOTE 5 CONNECTION
NOTE 4
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS
0
SECTION "A-A"
ARE TO BE CONNECTED.
6"
BLOW THRU 2X
MINIMUM
WHERE X = STATIC PRESSURE IN PAN 1. A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, 1S SIMILAR. FOLLOW
DAMPER MANUFACTURER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND GAGES FOR
C SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST BE INSTALLED IN THE PARTITION OR C
1 AIR HANDLING UNIT DRAIN TRAP "B" "B"
FLOOR AND NOT OUTSIDE THE PENETRATION.
MH504 SCALE: NTS
2. GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO DAMPER
FRAME AND TO PERIMETER ANGLES.
INSULATION
FLEXIBLE
0
WASHER 3. PERIMETER ANGELS: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" [40x40mm], 14 GAGE, TO
PROVIDE 1" [25mm] MINIMUM OVERLAP OF OPENING ON ALL 4 SIDES.
AUTO VALVE FLEX ACCESS DOOR SECTION "B-B" FACTORY
CONN. AC AIR COMPRESSOR FABRICATED
1 AND RECEIVER LATCH 4. BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN SMACNA. ACCESS
CW NOTES: PANELS: SIZE AND LOCATION TO PERMIT SERVICING THE FUSIBLE LINK OR LINKS.
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.
AFTERCOOLER
4
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS. 5. PROVIDE 1/4" TO 1/2" [6 TO 15mm] CLEARANCE ON HEIGHT AND WIDTH. FILL OPEN SPACE WITH
CONDENSATE 0-300 PSIG
A RV 3. SEE SMACNA 2005, FIGURE 9-15 ROCK WOOL FIRESTOP FIBER.
TRAP [0-2000 kPa]
A
6. ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS AND
D FLEX MECHANICAL ROOM FLOORS, SHALL BE PROVIDED WITH 3" [75mm] HIGH CONCRETE CURB AROUND D
D CONN 2 ACCESS PANEL AND DOOR DETAIL OPENING FOR DUCT.
D MH504 SCALE: NTS
CONDENSATE
TRAP
AD AIR FILTER
1 DRYER D D
A D
8
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
MECHANICAL DETAILS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O N A L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 ALK CDL
Revisions: Date 10 MARCH 2017 Dwg. 583 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
AHU-1 MECH ROOM PIC AIR COOLED HEAT PUMP 1910 740 1910 0.7 11" DIRECT DRIVE 1050 1 208/1/60 1/5 460/3/60 3.2 38 MBTU/H 60 MBTU/H 20 80 50 55 50 38 MBTU/H 90 1 7.20 208/1/60 32 MERV13 5 IN 1. 2. 3.
AHU-2 MECH ROOM ADMIN AIR COOLED HEAT PUMP 2125 320 2125 0.9 11" DIRECT DRIVE 1050 1 208/1/60 1/5 460/3/60 3.2 54 MBTU/H 60 MBTU/H 20 80 50 55 50 38 MBTU/H 90 1 7.20 208/1/60 27 MERV13 5 IN 1. 2. 3.
6"
AHU-3 MECH ROOM MAINTENANCE AIR COOLED HEAT PUMP 2225 885 2225 0.7 11" DIRECT DRIVE 1050 1 208/1/60 1/5 460/3/60 3.2 54 MBTU/H 60 MBTU/H 20 80 50 55 50 38 MBTU/H 90 1 7.20 208/1/60 27 MERV13 5 IN 1. 2. 3.
AHU-4 MECH ROOM HONOR GUARD AIR COOLED HEAT PUMP 700 350 700 0.5 11" DIRECT DRIVE 1050 1/3 208/1/60 1/8 208/1/60 3.1 15 MBTU/H 18 MBTU/H 17 80 50 55 50 15 MBTU/H 90 1 2.88 208/1/60 27 MERV13 5 IN
2
REMARKS
2. INCLUDE OUTSIDE AIR ECONOMIZER MIXING BOX WITH MOTORIZED DAMPER CONTROLLING OUTSIDE AIR AND RETURN AIR RATES. OUTSIDE AIR FLOW TO BE COMPLETELY SHUT WHEN SYSTEM IS OFF
MARK LOCATION FAN TYPE SERVICE MFR MODEL CFM @ 6000' SP IN WC @ SL APPROX RPM SONES MIN HP ELEC DRIVE TYPE DAMPER TYPE APPROX ROOF OPENING REMARKS
EF-1 ADMIN/PIC INLINE RESTROOM/HAC EXHAUST GREENHECK SQ-100-VG 600 0.30 1100 6 1/4 115/1/60 DIRECT/VARIABLE GRAVITY 12X12
6"
EF-2 ADMIN/PIC INLINE RESTROOM/HAC EXHAUST GREENHECK SQ-90-VG 320 0.35 1400 6 1/6 115/1/60 DIRECT/VARIABLE GRAVITY 10X10
EF-3 ADMIN/PIC INLINE RESTROOM/HAC EXHAUST GREENHECK SQ-80-VG 140 0.25 1200 5 1/6 115/1/60 DIRECT/VARIABLE GRAVITY 10X10
EF-4 ADMIN/PIC INLINE ELECTRICAL ROOM EXHAUST GREENHECK SQ-90-VG 250 0.20 1100 4 1/6 115/1/60 DIRECT/VARIABLE GRAVITY 10X10 THERMOSTATICALLY CONTROLLED. SETPOINT 90 DEG F.
EF-5 MAINTENANCE INLINE RESTROOM/HAC EXHAUST GREENHECK SQ-100-VG 885 0.35 1340 7 1/4 115/1/60 DIRECT/VARIABLE GRAVITY 16X16
EF-6 MAINTENANCE INLINE VEHICLE BAY CO EXHAUST SYSTEM GREENHECK SQ-160-VG 2250 0.35 1140 12 1/2 115/1/60 DIRECT/VARIABLE GRAVITY 24X24 CARBON MONOXIDE ALARM ACTIVATED
4
EF-7 MAINTENANCE INLINE VEHICLE BAY CO EXHAUST SYSTEM GREENHECK SQ-95-VG 500 0.20 1100 4 1/6 115/1/60 DIRECT/VARIABLE GRAVITY 24X24 CONTINUOUS OPERATION DURING OCCUPIED HOURS
EF-8 MAINTENANCE INLINE ELECTRICAL ROOM EXHAUST GREENHECK SQ-90-VG 250 0.20 1100 4 1/6 115/1/60 DIRECT/VARIABLE GRAVITY 10X10 THERMOSTATICALLY CONTROLLED . SETPOINT 90 DEG F.
EF-9 HONOR GUARD INLINE RESTROOM/HAC EXHAUST GREENHECK SQ-95-VG 350 0.35 1300 7 1/4 115/1/60 DIRECT/VARIABLE GRAVITY 10X10
C NOTES
C
1. FANS TO OPERATE ONLY DURING OCCUPANCY SCHEDULE UNLESS OTHERWISE NOTED
MARK TYPE MFR MODEL FRAME MATERIAL FINISH DAMPER TYPE ACCESSORIES REMARKS
CD1 CEILING DIFFUSER TITUS TMS LAY-IN STEEL OFF WHITE ENAMEL OPPOSED BLADE NONE
CD2 SLOT DIFFUSER TITUS ML-39 LAY-IN ALUMINUM OFF WHITE ENAMEL OPPOSED BLADE NONE 6x60 3-SLOT DIFFUSER
CD3 CEILING DIFFUSER TITUS TMR DUCT MOUNTED STEEL OFF WHITE ENAMEL OPPOSED BLADE NONE
CR1 CEILING REGISTER TITUS PAR LAY-IN STEEL OFF WHITE ENAMEL OPPOSED BLADE NONE
4
CR2 CEILING REGISTER TITUS TMR DUCT MOUNTED STEEL OFF WHITE ENAMEL OPPOSED BLADE NONE
CE1 EXHAUST REGISTER TITUS PAR LAY-IN ALUMINUM OFF WHITE ENAMEL OPPOSED BLADE NONE
CE2 EXHAUST REGISTER TITUS CT-580 SCREW-IN ALUMINUM OFF WHITE ENAMEL OPPOSED BLADE NONE
D CE3 EXHAUST REGISTER TITUS TMR DUCT MOUNTED STEEL OFF WHITE ENAMEL OPPOSED BLADE NONE D
NOTES
1. SEE FLOOR PLAN FOR THROW PATTERN
2. SEE DETAIL FOR DAMPER IN BRANCH DUCT SERVING EACH DIFFUSER
PROVIDE SQUARE TO ROUND ADAPTER
0
UTILIZE WET/DAMP LOCATION UH-5 HONOR GUARD CABINET 250 55 2 KW 480/3/60 1/8
UH-9 MAINTENANCE RADIANT TWO STAGE 65 MBTUH 85 MBTUH 25'-0" OUTSIDE AIR OUTSIDE AIR PROPANE 120/1/60
ACCESSORIES AND INSTALLATION METHOD
E E
CEILING FAN SCHEDULE
4
MOUNTING
MARK BUILDING LOCATION MFG MODEL DIAMETER CONTROLS POWER SPEEDS REMARKS
HEIGHT
HAIKU H SERIES BAMBOO SMART WALL MOUNTED
CF-1 ADMIN/PIC LOBBY 101 BAF 60" 13' 208/1/60 7
UNIVERSAL MOUNT CONTROLLER
HAIKU H SERIES BAMBOO SMART WALL MOUNTED
0
CF-2 ADMIN/PIC LOBBY 101 BAF 60" 13' 208/1/60 7 OPERATE FAN WHEN
UNIVERSAL MOUNT CONTROLLER
SPACE IS OCCUPIED YEAR
SMART WALL MOUNTED
CF-3 MAINTENANCE VEHICLE BAY 114 BAF ESSENCE 96" 19' 208/1/60 VARIABLE ROUND
CONTROLLER
SMART WALL MOUNTED
CF-4 MAINTENANCE VEHICLE BAY 114 BAF ESSENCE 96" 19' 208/1/60 VARIABLE
CONTROLLER
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: O R EG I S
Drawing Title
MECHANICAL SCHEDULES
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R AD
GL
T
Building Number Construction
O
DOU A S
ER
CO L
and Facilities
ED
8
CORY
LO
NG
49497
Approved: Project Director Location Drawing Number
Management
R
P RO
COLORADO SPRINGS, CO
EE
4
IN
FE
SS
I O NA L E NG PHONE: (202) 632-5722 Date Checked Drawn
FAX: MARCH 2017 ALK CDL
Revisions: Date 10 MARCH 2017 Dwg. 584 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
GENERAL NOTES
0
6"
1. COMPLY WITH ALL CURRENT APPLICABLE CODES AND 12. COORDINATE INSTALLATION OF CONDUIT WITH OTHER TRADES TO CONFORM TO THE STRUCTURE, MAINTAIN HEADROOM AND
STANDARDS. AND EQUIPMENT SUPPLIERS AS REQUIRED PRIOR TO KEEP OPENINGS AND PASSAGEWAYS CLEAR.
ROUGH-IN.
2. PROVIDE SEALANT AROUND ALL ELECTRICAL OUTLETS, 21. GROUNDING OF THE ELECTRICAL SYSTEM SHALL BE BY MEANS
2
PLUMBING FIXTURES, PIPING, AND EQUIPMENT ABUTTING OR 13. PROVIDE AND MAINTAIN ELECTRICAL SAFETY AND WORKING OF AN INSULATED GROUNDING CONDUCTOR INSTALLED WITH
PENETRATING A WALL OR PARTITION INCLUDING CLEARANCES IN FRONT OF AND AROUND ALL ELECTRICAL FEEDER CONDUCTORS IN ALL CONDUITS WHETHER OR NOT
FIRESTOPPING AT FIRE RATED ASSEMBLES. PANELS AND DISTRIBUTION EQUIPMENT IN ACCORDANCE WITH INDICATED ON DRAWINGS. GROUNDING CONDUCTORS SHALL
NEC. BE SIZED IN ACCORDANCE WITH NEC TABLE 250.122. PROVIDE
3. CONDUIT SHALL BE CONTINUOUS AND COMPLETE BETWEEN GROUNDING CONDUCTOR IN ALL TELEPHONE AND CATV
B PANELS, JUNCTION, OUTLET, PULL AND FIXTURE BOXES. IT 14. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR SERVICE CONDUITS.
B
SHALL BE KEPT CLEAN AND UNOBSTRUCTED INSIDE WITH CUTTING AND CORE DRILLING ALL PENETRATIONS THROUGH
ENDS FREE OF BURRS AND OTHER PROJECTIONS WHICH FLOORS,WALLS, ETC. 22. PROVIDE ALL CUTTING AND PATCHING REQUIRED FOR THE
WOULD DAMAGE OR IMPEDE PULLING OF WIRE. ALL CONDUIT PROPER INSTALLATION OF THE NEW ELECTRICAL WORK. ALL
0
SHALL BE INSTALLED PARALLEL AND PERPENDICULAR TO THE 15. IT IS NOT INTENDED THAT THE PLANS INDICATE ALL CONDUIT PATCHING SHALL BE OF THE SAME MATERIALS,
6"
BUILDING LINES. ALL CONDUIT SHALL BE ROUTED CONCEALED ROUTES, PULL BOXES, ETC. ELECTRICAL CONTRACTOR SHALL WORKMANSHIP, AND FINISH AND SHALL ACCURATELY MATCH
IN FINISHED AREAS EXCEPT WHERE OTHERWISE NOTED. BE RESPONSIBLE FOR DETERMINING ACTUAL CONDUIT ALL ADJACENT WORK.
ROUTING, QUANTITY, AND LOCATION OF PULL BOXES WITHIN
4. UNLESS OTHERWISE NOTED, ALL WIRES AND CABLES SHALL BE ACCESSIBLE LOCATIONS. PROVIDE SCREW-COVER PULL 23. CLEAN UP RESULTANT DEBRIS FROM THIS WORK AND REMOVE
CONTINUOUS WITHOUT SPLICES OR TAPS IN CONDUIT RUNS. BOXES IN CONDUIT RUNS AS REQUIRED TO LIMIT NUMBER OF FROM THE SITE. DISCONNECT AND REMOVE ALL TEMPORARY
4
ALL WIRING SHALL BE IN CONDUIT OR AS NOTED. ALL SPLICES BENDS TO NO MORE THAN THREE (3) OR 270 DEGREES TOTAL. POWER INCLUDING BUT, NOT LIMITED TO PANELS, FIXTURES,
SHALL BE MADE AT OUTLET BOXES, PULL BOXES OR JUNCTION SIZE PULL BOXES IN ACCORDANCE WITH NEC. DOCUMENT ON BOXES AND WIRING.
BOXES. AT ALL JOINTS, CONDUCTORS SHALL BE SPLICED OR RECORD DRAWINGS THE SIZE AND LOCATION OF PULL BOXES
C JOINED AS TO BE MECHANICALLY AND ELECTRICALLY SECURE. USED IN FEEDER CONDUIT RUNS. 24. TEST FOR GROUNDS AND SHORTS, TO ENSURE PROPER C
OPERATION OF ELECTRICAL EQUIPMENT. REPAIR OR REPLACE
5. IDENTIFICATION OF NEUTRAL, GROUNDING OF CIRCUITS, 16. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION FAULTY EQUIPMENT AT NO ADDITIONAL COST TO THE VA.
NUMBER OF WIRES IN CONDUIT SHALL COMPLY IN ALL ABOUT QUALITY AND GENERAL INSTALLATION REQUIREMENTS
RESPECTS WITH THE REQUIREMENTS OF THE NEC. OF ELECTRICAL CONSTRUCTION MATERIALS, ITEMS, AND 25. CONTRACTOR TO NOTE THAT WHEN A SPECIFIC DIRECTION IS
0
7. ALL MATERIAL SHALL CONFORM TO NEMA, ANSI AND U.S. DISRUPTIVE ROUTE FOR CONDUIT RUNS. COORDINATE WITH ABBREVIATIONS FOR DEFINITIONS.
STANDARDS, WHICHEVER APPLIES AND SHALL BEAR THE OTHER TRADES AND CONFIRM ROUTE SELECTION WITH
INSPECTION LABEL OF UNDERWRITER LABORATORIES, INC. RE/COR PRIOR TO BID. ANY DEVIATIONS FROM DRAWINGS 27. SIZES OF WIRE AND CABLE ARE BASED ON COPPER
SHALL BE SHOWN IN DETAIL ON AS-BUILT DRAWINGS BY CONDUCTORS. ALUMINUM CONDUCTORS ARE NOT
D D
8. ALL BOXES AND ENCLOSURES SHALL BE SET PLUMB, SQUARE CONTRACTOR. ACCEPTABLE.
AND SECURELY FASTENED. BOXES IN FINISHED WALLS SHALL
BE FLUSH WITH FINISH SURFACE. ALL PULL AND JUNCTION 18. FOR QUALITY ASSURANCE, ALL EQUIPMENT SHALL BE UL 28. ELEVATIONS FOR ELECTRICAL EQUIPMENT ARE SHOWN TO
BOXES SHALL BE SIZED PER NEC ARTICLE 314. LISTED AND APPROVED. ALSO, PERFORM WORK IN CENTER OF DEVICE OR ENCLOSURE UNLESS NOTED
ACCORDANCE WITH THE NATIONAL ELECTRICAL CONTRACTOR OTHERWISE.
0
9. PROVIDE GROUNDING AND BONDING OF ALL METAL RACEWAYS ASSOCIATION (NECA) "STANDARD OF INSTALLATION."
AS REQUIRED BY NEC. 29. RECEPTACLES AND TELE/DATA JACKS SHALL BE LOCATED 18"
19. ELECTRICAL DRAWINGS ARE DIAGRAMMATIC. SIZE AND AFF UNLESS NOTED OTHERWISE. LIGHT SWITCHES SHALL BE
10. PROVIDE NEW TYPE WRITTEN DIRECTORIES FOR ALL PANELS LOCATION OF EQUIPMENT AND WIRING ARE SHOWN TO SCALE LOCATED 48" AFF UNLESS NOTED OTHERWISE.
INSTALLED UNDER THIS CONTRACT. WHERE POSSIBLE, BUT MAY BE DISTORTED FOR CLARITY ON
THE DRAWINGS. FINAL LOCATIONS OF OUTLETS AND 30. REFER TO "UTILITIES" DRAWINGS FOR EXACT PLACEMENT OF
8
11. ALL ELECTRICAL WORK SHALL BE IN STRICT COMPLIANCE WITH EQUIPMENT SHALL BE AS SHOWN IN ENLARGED DETAILS OR AS EQUIPMENT AND LOCATIONS OF ELECTRICAL EQUIPMENT NOT
THE CURRENT EDITION OF THE NEC AS ADOPTED BY THE APPROVED BY THE RE/COR. OTHERWISE SHOWN ON ELECTRICAL DRAWINGS. (CIVIL
E AUTHORITY HAVING JURISDICTION INCLUDING ANY DRAWINGS). E
AMENDMENTS, ORDINANCES, AND INTERPRETATIONS. 20. THE PLANS DO NOT INDICATE ALL THE NECESSARY BENDS,
4
ELECTRICAL WORK SHALL ALSO COMPLY WITH ANY OFFSETS, PULL BOXES AND OBSTRUCTIONS. IT SHALL BE THE 31. FOR ABBREVIATIONS AND SYMBOLS, SEE SHEET EG002.
APPLICABLE FEDERAL AND STATE REGULATIONS. RESPONSIBILITY OF THE CONTRACTOR TO INSTALL HIS WORK
0
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ELECTRICAL GENERAL NOTES
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
EG001
4
IN
NAME: BRYAN J. BODNER
FE
SS G
IO NA L EN Date Checked Drawn
PHONE: (202) 632-5722
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 585 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
WIRING GRAPHICS PRIMARY DISTRIBUTION ELECTRICAL POWER SYMBOLS WIRING GRAPHICS - SECONDARY DISTRIBUTION EXTERIOR ELECTRICAL LEGEND
2
3# 2/0,15KV + #2/0,600V N 2P MOLDED CASE CIRCUIT BREAKER, FIXED TRIP. POWER DISTRIBUTION PANEL WITH MAIN UNDERGROUND DUCT LINE, CONCRETE ENCASED NUMERAL
30A THREE POLE UNLESS DESIGNATED '1P' OR '2P' CIRCUIT BREAKER 4P INDICATES QUANTITY OF DUCTS (4" MIN. IF NOT IDENTIFIED,
UNDERGROUND ELECTRICAL FEEDER - QUANTITY,
FOR COMM. TYP, 5" FOR ELEC. TYP.) LETTER "P" INDICATES
SIZE, AND VOLTAGE RATING OF PHASE AND NEUTRAL 400 AF MOLDED CASE CB OF A GIVEN FRAME SIZE CONDUIT RUN - SCHEMATIC DIAGRAM ELECTRICAL POWER LINE, "C" A COMMUNICATIONS TYPE LINE.
CONDUCTORS AS INDICATED 350 AT WITH ADJUSTABLE TRIP SETTINGS
A (2#12+#12 GRD)1/2"C A
SWITCH ASSEMBLY UF SECONDARY UNDERGROUND FEEDER, DIRECT BURIAL DUCT LINE
NORMALLY OPEN MOMENTARY PUSHBUTTON CONDUIT SIZE
QUANTITY OF GROUND WIRES
100E 8E SL STREET LIGHTING, DIRECT BURIAL DUCT LINE
FUSE - POWER AND CONTROL NORMALLY CLOSED MOMENTARY PUSHBUTTON QUANTITY OF PHASE AND NEUTRAL WIRES
0
SEPARABLE CONNECTOR IN PRIMARY DISTRIBUTION ASSEMBLY - TYPE AND NUMBER DESIGNATION AS INDICATED:
NORMALLY CLOSED CONTACT 20A DUPLEX RECEPTACLE - 2P,3W GROUNDING TYPE RECEPTACLE, 125V, ST-4, - SWITCH STATION NUMBER 4
200A 600A LINE (ELBOW TERMINATOR AND BUSHING NUMERAL ADJACENT IDENTIFIES CURRENT RATING IN AMPS (NO SEC, - SECONDARY RACK MOUNTED EQUIPMENT
COMBINATION)-LOAD BREAK (200A) AND EFX MOTOR - EQUIPMENT SCHEDULE IDENTIFICATION DESIGNATION INDICATES 15A MIN.) GFI INDICATES DEVICE WITH
M WP #4 GROUNDING SYSTEM - ELECTRODE AND CONDUCTOR
NON-LOADBREAK (600A) STYLES RESPECTIVELY AS SHOWN. INTEGRAL GROUND FAULT PROTECTION, WP INDICATES WEATHERPROOF
GFCI (BARE COPPER) - SIZE AS INDICATED
2
1V 1D
AUX AUXILIARY MIN MINIMUM
V SURFACE MOUNTED FLUORESCENT LIGHT FIXTURE W/ UPPER COMMON ENCLOSURE.
VOLTMETER A A BLDG BUILDING MSB MAIN SWITCHBOARD
CASE LETTER DESIGNATES THE FIXTURE TYPE. DARKENED AREA C CONDUIT N NORTH
1V 1D 1SN WT
M KILOWATT HOUR METER INDICATES EMERGENCY POWERED. WALL TELEPHONE JACK (RJ-45) MOUNTED AT 54" AFF. CB CIRCUIT BREAKER NEC NATIONAL ELECTRICAL CODE
CKT CIRCUIT NEUT NEUTRAL
WALL(SURFACE) MOUNTED FLUORESCENT LIGHT FIXTURE W/ SIPRNET DATA JACK (RJ-45) IN APPROVED LOCKABLE BOX. CL CENTER LINE NIC NOT IN CONTRACT
PF POWER FACTOR METER
4
A A
LENS. UPPER CASE LETTER DESIGNATES THE FIXTURE TYPE. ONE DATA JACK (RJ-45) AND ONE TELEPHONE JACK CONC CONCENTRIC NO NORMALLY OPEN, NUMBER
AS AMMETER WITH PHASE SELECTOR SWITCH DARKENED AREA INDICATES EMERGENCY POWERED. CONT CONTINUOUS OD OUTSIDE DIAMETER
(RJ-45) IN FLUSH FLOOR MOUNTED BOX.
COR CONTRACTING OFFICER'S REPRESENTATIVE O.C. ON CENTER
VS VOLTMETER WITH PHASE SELECTOR SWITCH 2'X4' RECESS MOUNTED FLUORESCENT FIXTURE. UPPER CASE TELEPHONE OUTLET (SINGLE JACK, RJ-45), 18"AFF, CPT CONTROL POWER TRANSFORMER PNL PANELBOARD
A A
D CURRENT TRANSFORMER (CT)-SECOND LETTER DESIGNATES THE FIXTURE TYPE. DARKENED AREA UNLESS NOTED OTHERWISE. CT CURRENT TRANSFORMER PF POWER FACTOR D
INDICATES EMERGENCY POWERED. 2SN SIPRNET OUTLET, 18" AFF, UNLESS NOTED. OTHERWISE. "2SN" CU COPPER PFCS POWER FACTOR CORRECTION
(3) NUMERAL OF TRANSFORMATION RATIO
IDENTIFIES NOMINAL CURRENT OF METERING DENOTES DUPLEX JACK. DET DETAIL STATION
400/5 WALL MTD. EXIT SIGN, ARROW IDENTIFIES DIRECTION OF EGRESS DIM DIMENSION PH PHASE
/ACCESSORY CIRCUIT, NUMERAL IN PARENTHESIS 2NN NIPRNET OUTLET, 18" AFF, UNLESS NOTED. OTHERWISE. "2NN" PSS PRIMARY SWITCH STATION
INDICATES QUANTITY OF CT'S SINGLE FACE DISC DISCONNECT
DENOTES DUPLEX JACK. DWG DRAWING PVC POLYVINYL CHLORIDE
EO ELECTRICAL SWITCH OPERATOR E EAST RCPT RECEPTACLE
WALL MTD. EXIT SIGN, ARROWS IDENTIFY DIRECTION OF EGRESS
GENERAL
0
48"AFF DETAILS FOR MOUNTING CONFIGURATIONS) GEN GENERATOR URD UNDERGROUND RESIDENTIAL
NEW WORK S OS SWITCH WITH OCCUPANCY SENSOR GFCI GROUND FAULT CIRCUIT INTERRUPTER DISTRIBUTION
LIGHTNING PROTECTION SYSTEM CABLE SPLICE
EXISTING S VS SWITCH WITH VACANCY SENSOR GND OR GRD GROUND V VOLT
LIGHTNING PROTECTION SYSTEM BOND CONNECTION G.O. GANG OPERATED VA VOLT AMPERE
SD DIMMER SWITCH GOVT GOVERNMENT VT VOLTAGE TRANSFORMER
LIGHTNING PROTECTION SYSTEM DOWNLEAD
0
FOUR POINT JUNCTION OCCUPANCY SENSOR FOR LIGHTING CONTROL GRC GALVANIZED RIGID STEEL CONDUIT W WEST
OS
IN ELECTRICAL MANHOLE LIGHTNING PROTECTION SYSTEM GROUND ROD J-BOX JUNCTION BOX W/ WITH
VS VACANCY SENSOR FOR LIGHTING CONTROL K KEY W/O WITHOUT
LIGHTNING PROTECTION SYSTEM GROUNDROD WITH KCMIL KILO CIRCULAR MIL WP WEATHERPROOF
PS PHOTOSENSOR FOR DAYLIGHTING CONTROL TEST WELL KV KILOVOLTS WPF WATER PROOF
2 KVA KILOVOLT AMPERES XMFR TRANSFORMER
CATV OUTLET, 18"AFF, UNLESS NOTED OTHERWISE. "2"
LIGHTNING PROTECTION SYSTEM CONDUCTOR
16
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
EG002
4
IN
NAME: BRYAN J. BODNER
FE
SS G
IO NA L EN Date Checked Drawn
PHONE: (202) 632-5722
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 586 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
# KEY NOTES:
1. DASHED BOUNDARY SHOWS LUMINAIRE FIXTURES TO BE CONTROLLED BY
DAYLIGHTING CONTROLLER. ALL TYPE M FIXTURES WITHIN BOUNDARY
2
THRESHOLD TO 80 FOOTCANDLES.
6"
1 101-A 102 104 5. WALL SCONCES AND RESTROOM FOYER CAN LIGHT SHALL BE
CONTROLLED BY LOBBY OCCUPANCY SENSOR.
01-EL1#1
(PART) 6. TOP OF FIXTURE AT 1' BELOW CEILING LEVEL.
01-NH1#1
105 111
4
2
CF-2 103
101
C 01-NL1#4 C
(PART) 107 109
4
106
108
CF-1
01-EL1#1
0
(PART)
110
01-NL1#4 5
(PART)
4
115 112
01-EL1#1 114
(PART) 01-NL1#4
(PART)
D D
3 3 01-NL1#4
(PART)
01-NH1#3
01-NL1#2 01-NL1#4
0
101-B
8
E 1 LIGHTING PLAN E
EL101 SCALE: 1/8" = 1'-0"
4
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U INTERIOR LIGHTING PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EL101
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 587 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
B B
0
6"
4
C HH C
HH
HH
0
GG GG
HH
HH
4
FF
HH 01-EL1#2
D D
HH HH
HH
HH
0
8
E E
4
1 LIGHTING PLAN
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U EXTERIOR LIGHTING PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EL102
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 588 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
(PART)
6"
# KEY NOTES:
115 1. FIXTURE HEIGHT SHALL BE ABOVE GARAGE DOOR LEVEL SO THAT IT WILL
NOT INTERFERE WITH THE OPERATION OF THE GARAGE DOOR.
02-EH1#3
2
(PART)
UP
2. DASHED BOUNDARY SHOWS LUMINAIRE FIXTURES TO BE CONTROLLED BY
DAYLIGHTING CONTROLLER.
3. INSTALL MANUFACTURER FURNISHED CEILING FAN CONTROLLER AT
LOCATION SHOWN.
4. OCCUPANCY SENSOR SHALL BE INFRARED TYPE.
B B
5. MOUNT LIGHT FIXTURE TO UNDERSIDE OF THE MEZZANINE STRUCTURE.
6. MOUNT PHOTO SENSOR WITH SENSOR FACING NEAREST WINDOW. SET
THRESHOLD TO 80 FOOTCANDLES.
0
EL103
C C
7 7 7 7
HR / LINK STATION/
4
02-NH1#3
COTR OFFICE
2 2 VEHICLE AND 2 103
EQUIPMENT
1 1 STORAGE
D 114
D
CORRIDOR
INTERIOR WASH BAY 5 02-EH1#3
WORK AREA 102
(PART)
116 02-NL1-26,28 MEN WOMEN
02-EH1#3 109
CF-4 (PART) CF-3 107
HAC
0
6 TYP 104
4 4
4 5
8 ELEC
3
110
8
1 1 5 FOREMAN
1 8 105
E 1 E
02-NH1#1 MECH
9 02-NH1#5
4
(PART) 112
0
108 106
LUNCHROOM / LOUNGE VEST/ BOOT WASH/ 0' 4' 8' 16'
1 LIGHTING PLAN HOLDING
EL103 SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
MAINTENANCE
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U INTERIOR LIGHTING PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EL103
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 589 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
B B
0
6"
JJ HH HH
02-EH1#1
4
HH
C GG C
HH
0
HH HH
JJ JJ
4
D D
GG
0
8
E E
4
GG
GG GG
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
MAINTENANCE
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U EXTERIOR LIGHTING PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EL104
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 590 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
# KEY NOTES:
1. DASHED BOUNDARY SHOWS LUMINAIRE FIXTURES TO BE CONTROLLED BY
LOUNGE MECH DAYLIGHTING CONTROLLER.
2
B B
03-NL1#2
0
6"
03-NL1#4 2
STORAGE
106
2
4
C C
HALL
104
0
LOCKERS
GUN
SAFE 107
102
4
D 1 D
0
8
E E
VEST/
MUD ROOM MEN WOMEN
4
LIGHTING PLAN
0
1
EL105 SCALE: 1/4" = 1'-0" 0' 2' 4' 8'
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
HONOR GUARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U INTERIOR LIGHTING PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EL105
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 591 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
EE
2
03-NL1#6
B EE
B
0
6"
EE
4
GG
C C
0
4
D D
0
8
E E
4
GG
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
HONOR GUARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U EXTERIOR LIGHTING PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EL106
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 592 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
# KEY NOTES:
1. BOTTOM OF FIXTURE AT 8' AFF.
2
B B
0
6"
4
C C
0
04-NL1#3
1
102
4
D D
0
LIGHTING PLAN
8
1
EL107 SCALE: 1/4" = 1'-0"
E E
4
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
COMMITTAL SERVICE SHELTER
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U LIGHTING PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EL107
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 593 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
# KEY NOTES:
1. BOTTOM OF LIGHT FIXTURE AT 7-1/2' AFF.
2
B B
0
6"
102
1 TYP
4
C C
0
4
ROOF HATCH
D D
101
0
05-NH1#2
8
E E
4
1 LIGHTING PLAN
EL108 SCALE: 1/4" = 1'-0"
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
PUMP STATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U LIGHTING PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EL108
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 594 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
A # KEY NOTES: A
1. FURNISH AND INSTALL ASTRONOMICAL TIMECLOCK IN ETO MAINTENANCE
TRAILER NEAR MAIN ENTRANCE TO CONTROL ETO AREA EXTERIOR
0
B B
DD DD PEDESTAL#2
0
6"
4
C C
ETO#1
ETO GG GG
0
GG
GG
4
GG
GG
D D
GG
GG
1
GG
0
GG
8
E E
4
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
MAIN ENTRANCE AND ETO YARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U EXTERIOR LIGHTING PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EL109
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 595 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
PNL 04-NL1
0
CKT#5,7
6"
(2#10+1#10G)3/4"C
2
B B
0
6"
4
C C
0
4
D D
ASSEMBLY AREA
ASSEMBLY PEDESTAL WITH
INTEGRAL UTILITY METER 3
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ASSEMBLY AREA
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U LIGHTING PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EL110
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 596 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
A A
LOBBY / REC VEST HAC FAMILY CORR DIR STOR ELEC DATA
0
15.4 20.2 25.6 30.6 34.3 36.5 37.4 36.6 33.5 20.5 20.1 31.5 32.8 24.4 75.7 82.4 84.6 84.7 81.7 74.0 62.9
Description Symbol Avg Max Min Max/Min Avg/Min
30.6 37.4 41.7 41.7 38.9 33.2 OPEN
48.0 59.2 77.1 83.8OFFICE
86.3 86.7 84.0 76.1 64.6 52.7 59.9 63.9 63.3 58.5 50.6 28.9 30.7 29.0 17.8 19.0 18.9 17.7 26.0 28.2 28.2 25.3
15.9 20.9 26.6 31.8 35.8 38.3 39.6 39.6 38.6 37.1 34.0 32.8 32.5 32.7 101 LOBBY/REC 29.7 fc 43.4 fc 9.0 fc 4.8:1 3.3:1
36.5 42.9 48.9 49.3 45.2 37.5 104
55.6 69.1 78.1 83.3 85.4 85.9 83.5 75.9 64.6 56.8 65.9 71.4 72.0 67.1 57.6 31.4 32.8 31.5 19.3 20.6 20.4 18.6 28.9 31.1 30.6 27.6 101 (FOYER) 15.4 fc 25.8 fc 7.3 fc 3.5:1 2.1:1
16.2 21.3 27.2 32.7 36.8 39.6 41.1 41.7 41.3 40.4 38.8 36.6 35.8 36.4
101
38.9 46.1 51.9 52.3 48.1 40.0 57.4 66.7 73.1 75.2 71.4 61.6 32.8 34.3 32.9 17.6 18.8 18.9 17.7 30.2 32.4 31.8 28.6 45.1 fc 55.2 fc 30.9 fc 1.8:1 1.5:1
16.1 21.4 27.3 33.0 37.3 40.2 42.0 42.9 42.9 42.4 41.5 39.6 37.8 38.5 61.7 72.9 79.4 82.5 84.0 84.6 82.5 75.3 64.3 (RECEPTION)
4
MECH
40.2 47.9 53.9 54.4 50.0 41.6 101A VEST 31.3 fc 43.8 fc 20.6 fc 2.1:1 1.5:1
15.8 21.0 27.0 32.7 37.1 40.1 42.1 43.1 43.4 43.1 42.1 40.2 38.9 39.4 65.0 74.8 79.4 81.0 82.0 82.8 80.9 74.0 63.3 57.6 67.1 73.8 76.3 72.7 62.9 32.8 34.3 32.9 17.5 18.9 18.8 17.8 30.2 32.4 31.8 28.6
109 101B VEST 23.8 fc 37.1 fc 8.7 fc 4.3:1 2.7:1
C 40.7 48.8 54.9 55.7 51.1 42.4 64.8 73.4 76.9 77.7 78.6 79.8 77.9 70.5 60.9 57.4 66.9 73.3 75.2 71.3 61.3 31.3 32.8 31.5 28.7 31.1 30.6 27.7 C
15.2 20.2 26.1 31.8 36.2 39.3 41.3 42.5 42.9 42.7 41.8 40.1 38.7 39.8 19.0 20.4 20.4 18.6 102 HAC 48.6 fc 56.1 fc 40.6 fc 1.4:1 1.2:1
39.8 47.7 53.5 54.4 50.1 41.7 103 FAMILY 24.8 fc 38.1 fc 14.0 fc 2.7:1 1.8:1
14.2 19.1 24.8 30.3 34.7 37.7 39.7 40.9 41.5 41.6 41.0 39.8 38.6 39.5 63.1 71.0 73.7 73.9 74.6 76.0 75.4 70.4 57.4 52.9 61.5 67.0 68.3 64.6 55.8 28.8 30.7 29.0 17.3 18.6 18.7 17.7 25.8 28.1 28.2 25.4
104 OPEN OFFICE 73.2 fc 86.7 fc 48.0 fc 1.8:1 1.5:1
38.0 45.5 51.1 52.3 48.2 40.2 60.8 67.5 69.3 69.1 69.8 71.4 71.1 67.2 60.9 42.3 40.3 37.7 34.1 32.1 32.8 34.3 33.2 30.7 29.1 29.5 30.4 28.4 23.0 17.3 20.8 26.2 27.8 26.2
12.9 17.4 22.9 28.3 32.6 35.5 37.3 38.4 38.9 39.4 39.5 39.0 38.2 38.8 105 DIR 64.8 fc 76.3 fc 50.6 fc 1.5:1 1.3:1
VEST
106 STOR 31.6 fc 34.3 fc 28.8 fc 1.2:1 1.1:1
0
35.1 42.2 47.6 49.1 45.2 37.7 54.0 59.5 61.1 61.0 61.6 62.7 62.6 59.9 55.6 50.8 44.6 41.6 37.2 34.8 35.7 37.5 36.9 33.9 32.0 32.5 33.6 31.1 24.8 18.0 22.3 27.9 31.1 29.3
11.0 14.9 20.7 25.6 29.3 31.8 33.5 34.9 34.8 35.7 36.7 37.2 36.8 37.1
110 107 ELEC 18.8 fc 20.6 fc 17.6 fc 1.2:1 1.1:1
30.4 36.1 40.5 41.7 38.7 32.8 45.9 49.8 51.3 51.6 52.1 52.7 52.5 51.0 49.1 47.8 45.2 40.1 35.1 33.2 32.8 34.3 34.1 32.1 30.4 29.7 30.4 28.4 23.1 17.8 20.9 26.2 27.8 26.2 108 DATA 18.6 fc 20.4 fc 17.3 fc 1.2:1 1.1:1
12.9 16.2 22.3 26.4 28.2 28.3 28.2 28.8 29.2 32.6 33.6 33.4 32.9
20.2 25.5 25.8 17.6 45.4 52.3 55.7 54.7 49.6 44.1 39.0 34.4 37.2 41.6 41.3 67.4 75.4 75.3 67.1 109 MECH 29.1 fc 32.4 fc 25.3 fc 1.3:1 1.2:1
20.9 26.9 25.7 20.0 53.4 61.2 65.4 68.8 68.6 66.8 66.4 68.2 66.8 61.0 23.5 32.0 38.1 39.7 33.3 24.4 HAC
23.1 22.1 21.8 23.2 110 VEST 26.1 fc 31.1 fc 20.8 fc 1.5:1 1.3:1
4
12.7 18.6 18.0 10.6 51.7 60.1 64.8 64.0 59.0 52.4 45.8 39.7 42.4 47.3 47.1 70.8 79.5 79.4 70.6
58.3 67.5 72.2 76.2 76.0 73.3 72.8 74.2 73.6 67.1 23.2 30.8 36.0 37.3 32.0 24.1 111 CORR 43.0 fc 71.4 fc 17.3 fc 4.1:1 2.5:1
17.5 26.0 25.5 17.1 112
32.2 33.5 33.1 32.2 55.2 64.7 70.5 70.9 67.3 61.8 54.7 46.8 45.6 51.1 50.0 65.7 75.3 75.2 65.5 112 HAC 72.3 fc 79.5 fc 65.5 fc 1.2:1 1.1:1
7.8 10.6 10.2 7.3
59.7 69.7 74.4 78.6 78.6 76.1 75.6 76.8 75.9 69.2 20.0 24.9 27.8 28.6 25.8 20.7
16.8 26.1 26.2 17.6 113 LUNCH 49.6 fc 67.3 fc 31.0 fc 2.2:1 1.6:1
40.8 47.2 41.1 34.9 34.9 40.5 46.8 41.2 57.6 67.9 74.8 76.7 75.1 71.8 66.7 56.0 47.5 54.7 51.4 31.0 38.7 37.4 32.8
D 57.2 68.5 74.7 79.4 79.7 77.4 77.0 78.2 77.3 70.5 16.1 18.5 19.5 20.2 19.0 16.6 114 TOILET 26.8 fc 39.7 fc 16.6 fc 2.4:1 1.6:1 D
19.8 28.9 29.8 21.8
39.6 44.4 42.2 36.3 36.4 41.7 44.1 39.6 58.9 69.9 77.7 80.7 80.5 78.7 75.5 70.2 39.0 61.4 63.9 45.1 48.2 45.7 38.7 115 TOILET 25.9 fc 38.1 fc 16.1 fc 2.4:1 1.6:1
62.3 71.4 76.6 77.6 76.0 75.7 76.8 75.8 69.1
23.2 34.0 36.8 25.6 31.6 35.4 37.4 37.6 34.1 116 OP STOR 37.1 fc 41.6 fc 31.6 fc 1.3:1 1.2:1
37.7 42.5 43.0 37.8 38.1 42.4 42.3 37.3 58.4 69.3 77.4 81.2 81.9 81.1 78.7 74.0 67.8 62.5 54.9 46.6 62.2 67.3 64.2 59.6 53.0 43.2
43.0 65.1 71.1 72.7 72.0 71.9 72.5 71.2 65.0 117 OPS 63.6 fc 81.9 fc 34.4 fc 2.4:1 1.8:1
21.6 33.1 37.1 24.6 35.6 40.1 41.5 41.0 36.7
38.0 43.9 45.1 40.2 40.8 44.9 43.5 37.2 56.6 67.4 75.5 79.6 80.8 80.7 78.9 74.7 69.2 64.1 58.9 50.4 59.7 64.5 65.1 62.5 55.7 44.7 118 MEETING 67.3 fc 79.7 fc 43.0 fc 1.9:1 1.6:1
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U INTERIOR PHOTOMETRICS Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EL201
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 597 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
Statistics
A Description Symbol Avg Max Min Max/Min Avg/Min
A
Admin 0.4 fc 7.0 fc 0.0 fc N/A N/A
0
6"
0.9 1.5 2.2 2.3 1.8 1.1 0.6 0.3 0.1 0.0 0.0 0.3 0.4 0.4 0.4 0.3 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0
2
0.8 1.6 3.1 3.9 1.9 1.1 0.6 0.2 0.1 0.0 0.0 0.7 0.8 0.7 0.7 0.5 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.1 0.1 0.0
B HH B
0.0 0.0 0.0 0.0 0.0 1.3 1.4 1.1 0.9 1.4 1.1 1.0 0.4 0.9 1.0 1.1 0.3 0.1 0.0 0.0
0
6"
0.0 2.7 2.2 1.7 1.4 2.7 2.3 2.4 0.8 2.4 2.2 2.4 0.7 0.2 0.1 0.0
4
0.0 5.1 4.2 2.9 2.9 4.4 5.9 4.2 3.5 4.2 5.8 4.1 2.2 1.2 0.5 0.1
C GG GG C
HH
0.0 4.4 7.0 3.1 2.6 3.1 3.3 3.5 3.1 3.4 3.2 2.8 1.9 1.1 0.6 0.2
FF
0
0.0 1.9 2.1 1.9 1.9 1.9 1.9 2.2 2.1 2.1 1.8 1.5 1.3 0.8 0.5 0.2
4
0.7 1.6 3.2 4.0 1.9 1.0 0.5 0.2 0.0 0.0 0.0 0.8 1.1 1.1 1.1 1.0 0.9 1.1 1.3 1.1 0.8 0.7 0.7 0.5 0.3 0.1
D HH D
0.9 1.6 2.4 2.8 1.8 1.2 0.6 0.2 0.1 0.0 0.0 0.4 0.5 0.6 0.5 0.4 0.3 0.3 0.4 0.3 0.2 0.2 0.2 0.2 0.1 0.1
0
0.7 1.2 1.7 1.7 1.5 0.9 0.5 0.3 0.1 0.1 0.0 0.1 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0
8
0.5 0.7 0.7 0.7 0.7 0.6 0.4 0.2 0.1 0.1 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
E E
4
0.3 0.3 0.3 0.3 0.3 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0
1 EXTERIOR PHOTOMETRICS
EL202 SCALE: NONE
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U EXTERIOR PHOTOMETRICS Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EL202
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 598 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
Statistics
18.2 21.7 25.2 28.0 29.8 30.2 30.0 1. REFER TO DWG EL206 FOR LUMINAIRE SCHEDULE.
Description Symbol Avg Max Min Max/Min Avg/Min
MEZZANINE
19.2 24.4 30.0 34.7 37.3 37.3 35.5
101 VESTIBULE 25.0 fc 27.5 fc 22.1 fc 1.2:1 1.1:1 115
21.2 28.3 36.5 43.6 47.3 46.2 42.1
102 CORRIDOR 39.8 fc 48.9 fc 29.8 fc 1.6:1 1.3:1
A 23.0 31.8 42.4 51.8 56.4 54.3 48.0
A
103 HR/Link Station/COTR Office 73.0 fc 80.8 fc 62.5 fc 1.3:1 1.2:1
104 HAC 34.2 fc 39.5 fc 30.5 fc 1.3:1 1.1:1 24.1 33.6 44.9 55.2 60.0 57.6 50.5
0
105 FOREMAN 47.9 fc 56.4 fc 35.8 fc 1.6:1 1.3:1 24.0 33.0 43.4 52.6 57.2 55.3 49.3
106 Vest/Boot Wash/Holding 38.9 fc 48.3 fc 28.1 fc 1.7:1 1.4:1
6"
UP
110 ELEC 28.4 fc 30.9 fc 25.7 fc 1.2:1 1.1:1 25.0 34.3 45.1 54.7 59.2 57.3 51.0
1 MEZZANINE
111 IT CLOSET 24.4 fc 27.0 fc 21.0 fc 1.3:1 1.2:1 25.6 35.6 47.5 58.2 63.2 60.8 53.4 SCALE: NONE
EL203
112 MECH 24.9 fc 27.6 fc 22.4 fc 1.2:1 1.1:1 25.4 35.0 46.4 56.5 61.3 59.2 52.5
113 PART AND TOOL STORAGE 25.6 fc 33.0 fc 16.6 fc 2.0:1 1.5:1
24.6 33.2 43.0 51.6 55.8 54.5 49.3
B 114 Mezzanine 41.3 fc 63.2 fc 18.2 fc 3.5:1 2.3:1 B
23.9 31.8 40.5 47.9 51.7 51.0 47.0
114 VEHICLE AND EQUIPMENT
37.5 fc 59.9 fc 18.8 fc 3.2:1 2.0:1
STORAGE 23.9 32.0 41.0 48.7 52.6 51.7 47.4
116 INTERIOR WASH BAY WORK AREA 37.0 fc 52.7 fc 19.6 fc 2.7:1 1.9:1 24.4 33.3 43.6 52.7 57.3 55.6 49.8
0
C C
19.6 21.6 23.3 24.0 23.5 21.8 19.6 18.8 21.1 23.4 25.0 25.7 25.2 23.9 22.6 21.9 22.1 23.2 24.9 26.5 27.3 27.1 26.0 24.7 23.8 23.6 24.5 26.2 28.4 29.7 29.1 27.0 25.6 24.0 22.6 22.2 22.8 23.6 24.4 24.6 24.1 23.0 21.0 24.1 26.7 28.2 28.7 28.6 27.9 26.3 23.8 28.2 30.0 30.3 29.2 27.8 26.5 51.9 52.3 53.6 54.8 31.1 29.9 22.1 23.9 23.9 22.1 62.5 64.9 65.7 64.7 62.5 HR / LINK STATION/
COTR OFFICE
0
23.0 26.4 29.3 30.6 29.7 27.0 23.2 20.9 24.4 28.1 30.9 31.8 30.8 28.3 25.9 24.6 24.9 26.7 29.6 32.4 33.8 33.3 31.1 28.6 26.8 26.4 27.6 30.4 33.8 36.1 35.8 32.8 30.2 27.4 25.5 24.8 25.4 26.7 28.0 28.5 27.7 25.9 22.0 25.9 29.3 31.2 31.6 31.4 30.5 28.5 25.1 35.5 38.4 38.4 36.8 34.4 32.3 57.9 56.6 57.6 60.7 38.7 37.0 25.2 26.9 26.9 25.2 68.3 72.2 73.3 71.7 68.1
103
26.7 31.8 36.4 38.6 37.2 32.9 27.5 23.8 28.7 34.1 38.3 39.6 37.6 33.7 29.9 27.9 28.2 30.9 35.2 39.5 41.8 40.8 37.3 33.2 30.3 29.5 31.2 35.1 40.2 44.0 43.9 39.9 35.7 31.4 28.4 27.3 28.0 29.8 31.6 32.4 31.2 28.7 22.7 27.0 30.7 32.7 33.0 32.6 31.6 28.6 24.7 41.1 44.4 44.3 42.4 40.1 39.4 53.9 53.8 54.7 61.6 48.3 43.1 25.8 27.5 27.5 25.8 73.6 77.4 78.7 76.5 71.9
29.9 36.6 42.6 45.6 43.8 38.2 31.1 26.6 32.7 39.6 44.9 46.4 43.5 38.2 33.2 30.5 30.9 34.5 40.1 45.9 48.9 47.4 42.8 37.3 33.3 32.3 34.4 39.5 46.1 51.1 51.2 46.2 40.6 34.9 31.0 29.5 30.3 32.4 34.7 35.7 34.3 31.1 22.6 26.7 30.2 31.9 31.7 31.1 28.5 25.7 23.2 43.5 47.0 46.7 44.6 41.8 40.7 48.5 46.5 45.1 47.7 53.4 61.5 52.0 45.9 23.5 25.3 25.3 23.5 75.7 79.5 80.6 78.4 73.4
31.8 39.2 45.8 49.1 47.0 41.0 33.2 28.9 35.5 42.7 48.1 49.5 46.2 40.3 34.8 32.0 32.6 36.6 42.8 49.2 52.4 50.9 45.8 39.9 35.5 34.3 36.6 42.1 49.4 54.9 54.9 49.5 43.3 37.1 32.8 31.2 32.0 34.3 36.8 37.9 36.2 32.7 22.2 26.2 29.5 30.8 29.9 21.8 41.5 44.6 43.4 41.6 34.3 36.0 40.1 40.2 36.1 40.0 46.7 52.4 45.7 75.9 79.8 80.8 78.7 73.7
4
33.9 41.4 48.1 51.3 49.4 43.3 35.5 47.7 51.7 50.5 45.4 39.2 33.7 29.8 28.1 28.7 31.9 37.5 44.8 51.5 55.1 53.9 48.9 43.0 38.8 37.6 40.0 45.6 52.8 58.3 58.1 52.2 46.2 40.2 36.0 34.5 35.4 37.8 40.3 41.4 39.6 35.8 31.1 34.3 35.6 34.1 30.9
47.5 48.9 45.4
32.8 39.4 45.1 47.9 46.2 40.9 34.1 42.5 46.4 46.5 43.4 38.9 34.4 30.8 28.9 29.1 31.7 36.5 42.7 48.5 51.5 50.5 46.4 41.5 37.9 36.9 39.1 43.9 50.1 54.2 54.1 49.2 44.2 39.0 35.5 34.1 35.1 37.3 39.5 40.4 38.8 35.3 25.8 28.0 29.2 28.7 27.0 30.1 34.6 39.0 42.1 43.5 43.9 44.6 45.6 46.2 45.6 44.3 42.6 40.5 39.2 36.2 32.2 28.5 28.5 29.5 28.1 35.8 38.1 38.9 38.2 35.9
47.4 47.3 45.3
31.8 37.8 42.8 45.2 43.7 39.1 32.9 37.1 41.2 43.1 42.5 40.0 36.4 32.8 30.3 29.8 31.8 35.9 41.3 46.3 48.9 48.1 44.5 40.1 36.9 36.1 38.1 42.5 48.2 51.7 51.4 47.0 42.6 38.0 34.8 33.7 34.6 36.7 38.7 39.4 38.0 34.7 26.8 29.4 30.9 30.3 28.2 33.0 39.9 46.9 51.6 53.1 53.1 53.9 55.8 56.9 55.7 53.5 52.0 51.6 50.0 45.6 39.1 32.9 33.2 35.7 33.0 41.7 45.2 46.3 45.3 41.7
42.8 43.6 42.7
31.6 37.8 43.0 45.5 43.9 39.1 32.8 33.3 38.1 42.0 43.9 43.1 40.0 35.7 32.3 31.0 32.4 36.2 41.5 46.6 49.3 48.3 44.6 39.9 36.6 35.7 37.7 42.3 48.2 51.9 51.7 47.2 42.6 37.7 34.4 33.2 34.2 36.2 38.3 39.0 37.6 34.3 26.7 29.4 30.8 30.2 28.2 36.3 45.3 54.6 60.8 62.4 61.9 62.9 65.6 67.2 65.6 62.6 61.3 61.5 60.0 54.2 45.3 36.9 36.8 40.4 40.5 46.7 51.0 52.4 51.1 46.8
32.1 38.9 45.0 47.9 46.1 40.5 33.4 30.9 36.8 42.7 46.7 47.2 44.0 38.8 34.2 32.0 32.9 36.9 42.8 48.6 51.7 50.4 45.8 40.4 36.4 35.4 37.6 42.7 49.3 54.3 53.8 49.0 43.5 37.9 34.1 32.7 33.5 35.7 38.0 38.9 37.3 33.9 25.7 27.9 29.0 28.5 26.9 38.3 48.3 58.7 65.6 67.5 67.0 68.1 71.1 72.9 71.2 68.0 66.6 67.0 65.3 58.8 48.8 39.2 39.0 43.5 44.6 42.8 35.2 30.9 49.3 54.1 55.4 54.1 49.2
FOREMAN
8
22.5 24.4 25.4 25.0 23.4 39.0 49.1 59.4 66.4 68.6 68.5 69.7 72.5 74.1 72.6 69.6 68.3 68.3 66.4 59.8 49.8 40.1 40.1 45.3 47.4 46.5 43.8 38.1 50.3 55.1 56.4 54.9 49.9
32.0 39.4 46.1 49.3 47.3 41.2 33.5 29.1 35.7 42.7 48.1 49.4 46.2 40.3 35.0 32.2 32.8 36.8 43.0 49.3 52.5 51.0 45.9 40.0 35.7 34.5 36.8 42.3 49.5 55.0 55.1 49.7 43.6 37.4 33.3 31.7 32.6 34.9 37.4 38.4 36.8 33.3
105
23.0 25.5 26.9 26.3 24.3 39.2 49.3 59.7 66.8 69.1 69.1 70.2 73.1 74.7 73.2 70.2 68.9 68.9 66.9 60.2 50.2 40.3 39.8 45.4 48.3 48.3 46.5 41.5 50.3 55.0 56.3 54.8 49.8
E 30.6 37.5 43.8 46.9 44.9 39.1 31.8 27.0 33.3 40.4 45.8 47.3 44.4 38.9 33.8 31.0 31.4 35.1 40.8 46.8 49.8 48.3 43.5 37.9 33.7 32.6 34.9 40.1 46.9 52.1 52.2 47.1 41.3 35.5 31.6 30.2 31.0 33.2 35.6 36.6 35.1 31.9 E
23.4 26.1 27.6 26.9 24.7 38.8 49.1 59.7 66.9 69.1 68.7 69.9 72.9 74.7 73.0 69.9 68.6 68.9 67.1 60.2 50.0 40.0 37.6 42.8 45.8 46.4 45.2 40.8 48.8 53.3 54.7 53.3 48.7
27.7 33.1 38.1 40.5 39.0 34.4 28.5 24.4 29.6 35.3 39.8 41.2 39.1 34.8 30.8 28.6 29.0 31.8 36.3 41.0 43.3 42.3 38.6 34.1 30.9 30.1 31.9 36.1 41.5 45.5 45.5 41.3 36.8 32.4 29.3 28.1 28.8 30.6 32.5 33.4 32.2 29.6
4
23.0 25.5 26.8 26.3 24.3 37.0 46.3 56.2 63.1 65.2 64.9 65.9 68.8 70.4 68.9 66.0 64.8 65.1 63.3 56.8 47.3 38.2 33.6 37.6 40.1 40.7 39.8 36.4 45.0 49.0 50.2 49.2 45.1
24.0 27.7 31.0 32.6 31.6 28.5 24.4 21.4 25.3 29.5 32.5 33.6 32.4 29.7 27.0 25.6 25.8 27.9 30.9 34.0 35.5 34.9 32.5 29.6 27.5 27.0 28.3 31.3 35.0 37.6 37.3 34.2 31.4 28.4 26.4 25.7 26.3 27.6 29.0 29.6 28.7 26.9
22.4 24.4 25.3 24.9 23.4 34.0 41.0 48.4 55.4 57.3 57.4 58.2 60.2 61.3 60.2 58.2 57.3 57.3 55.6 48.9 41.8 35.0 28.9 31.5 33.2 33.7 33.0 30.5 39.7 42.6 43.6 42.8 39.8
20.5 22.8 24.7 25.7 25.1 23.2 20.6 18.8 21.9 24.6 26.5 27.2 26.7 25.2 23.8 22.9 23.2 24.4 26.2 28.0 28.9 28.6 27.3 25.7 24.5 24.2 25.1 27.1 29.4 30.9 30.3 28.1 26.6 24.9 23.6 23.1 23.6 24.5 25.4 25.7 25.1 23.9
0
108 106
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EL203
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 599 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1. REFER TO DWG EL206 FOR LUMINAIRE SCHEDULE.
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
A A
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6"
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.3 0.3 0.3 0.1 0.1 0.2 0.4 0.3 0.3 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
B 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.9 1.0 1.1 0.3 0.2 0.1 0.2 0.8 1.2 1.2 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 B
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 2.3 2.3 2.6 0.7 0.3 0.3 0.6 2.1 2.7 3.0 1.0 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.3 1.0 1.8 3.4 5.5 4.0 2.3 1.4 1.4 1.8 3.0 5.2 4.1 2.4 1.3 0.6 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0
6"
0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.5 1.1 1.7 2.7 3.0 2.9 2.0 1.5 1.5 1.6 2.4 2.8 2.7 2.0 1.2 0.7 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.6 1.0 1.3 1.8 1.8 1.7 1.5 1.3 1.2 1.3 1.5 1.4 1.4 1.3 0.9 0.6 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.6 0.9 1.1 1.2 1.2 1.2 1.2 1.1 1.1 1.2 1.1 0.9 0.9 0.9 0.8 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4
0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.7 0.8 0.9 1.0 1.1 1.1 1.1 1.1 1.1 1.2 1.1 1.1 0.8 0.7 0.8 0.7 0.6 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.1 0.2 0.3 0.4 0.5 0.5 0.7 1.0 1.3 1.4 1.5 1.4 1.3 1.5 1.6 1.6 1.7 1.5 1.5 1.5 1.3 1.4 1.1 0.8 0.5 0.4 0.4 0.4 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
C 0.2 0.3 0.5 0.6 0.7 0.6 0.8 1.1 1.5 1.8 1.6 1.6 1.7 2.0 2.5 2.6 2.3 2.1 2.1 2.5 2.4 2.3 1.7 1.1 0.6 0.6 0.7 0.9 1.0 0.4 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
C
0.3 0.5 0.7 1.0 1.1 0.5 0.8 1.1 1.9 2.6 2.1 1.6 1.7 2.1 3.4 4.4 2.5 2.1 2.3 3.5 4.2 3.0 2.0 1.2 0.7 0.8 1.1 1.5 1.8 0.9 0.2 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.3 0.6 1.1 1.5 1.7 2.4 1.7 0.9 0.5 0.7 1.3 2.4 3.1 2.7 0.9 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0
0.3 0.6 1.4 2.2 3.3 3.0 2.0 0.9 0.5 0.7 1.3 2.6 4.8 4.3 1.2 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.3 0.6 1.4 2.6 4.5 2.8 2.0 0.8 0.5 0.7 1.3 2.6 3.7 3.6 1.2 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.3 0.6 1.3 1.9 2.3 1.7 1.4 0.8 0.6 0.8 1.3 1.9 2.3 1.3 0.3 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4
0.5 0.9 1.4 2.1 2.7 2.6 3.5 3.3 3.3 3.6 2.8 2.1 2.0 2.6 4.5 4.7 2.6 2.0 2.3 3.6 4.6 3.1 2.0 1.2 0.8 0.8 1.1 1.5 1.5 0.6 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.4 0.7 1.1 1.6 2.0 2.0 2.7 2.6 2.6 2.8 2.2 1.9 2.0 2.3 2.9 2.9 2.3 2.0 2.1 2.5 2.7 2.3 1.7 1.1 0.7 0.8 1.1 1.5 1.5 0.6 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D Statistics
D
0.4 0.6 0.9 1.2 1.6 1.8 2.0 2.3 2.3 2.1 2.0 1.9 1.7 1.9 2.0 1.9 1.8 1.5 1.6 1.7 1.5 1.5 1.1 0.8 0.6 0.9 1.2 1.7 2.0 1.0 0.3 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Description Symbol Avg Max Min Max/Min Avg/Min
0.3 0.5 0.7 0.9 1.2 1.3 1.5 1.7 1.7 1.5 1.5 1.4 1.3 1.2 1.1 1.0 1.1 1.0 1.0 0.9 0.7 0.8 0.6 0.5 0.4 0.8 1.4 2.5 3.2 2.9 1.0 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Maintenance 0.3 fc 5.5 fc 0.0 fc N/A N/A
0.2 0.4 0.5 0.6 0.8 0.8 0.9 1.0 1.0 1.0 0.9 0.9 0.9 0.8 0.6 0.6 0.6 0.6 0.6 0.4 0.4 0.4 0.4 0.3 0.3 0.7 1.4 2.7 4.9 4.2 1.2 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0
0.2 0.3 0.3 0.4 0.5 0.5 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.5 0.4 0.3 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.3 0.6 1.4 2.6 3.6 3.5 1.2 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.1 0.2 0.2 0.3 0.4 0.4 0.5 0.5 0.4 0.5 0.5 0.5 0.5 0.4 0.4 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.4 0.8 1.3 1.9 2.3 1.3 0.4 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.1 0.1 0.1 0.2 0.3 0.4 0.6 0.7 0.6 0.7 0.7 0.7 0.5 0.5 0.5 0.6 0.7 0.6 0.6 0.7 0.5 0.4 0.4 0.5 0.8 1.1 1.4 1.7 1.8 0.9 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8
0.1 0.1 0.1 0.1 0.3 0.5 0.9 1.2 1.3 1.3 1.3 1.0 0.7 0.6 0.7 1.0 1.4 1.3 1.3 1.3 0.9 0.6 0.6 0.8 1.2 1.7 1.9 2.0 1.6 0.9 0.5 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
E 0.0 0.0 0.1 0.1 0.2 0.7 1.2 1.9 2.6 2.5 2.2 1.3 0.9 0.7 0.9 1.4 2.3 2.7 2.7 2.0 1.2 0.8 0.7 1.1 1.7 2.7 3.0 2.8 1.9 1.1 0.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 E
0.0 0.0 0.0 0.0 0.2 0.6 1.3 2.4 4.0 4.5 2.7 1.6 0.9 0.4 0.9 1.6 2.8 4.9 4.2 2.4 1.3 0.7 0.5 1.0 1.9 3.5 5.5 3.9 2.1 1.1 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4
0.0 0.0 0.0 0.0 0.1 0.3 0.7 1.8 3.9 4.5 2.3 0.9 0.4 0.2 0.3 0.7 2.0 3.1 3.2 1.3 0.5 0.2 0.1 0.2 0.4 2.4 1.5 2.4 0.6 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.4 1.3 1.3 0.7 0.2 0.1 0.1 0.1 0.2 0.7 1.3 1.2 0.4 0.2 0.1 0.1 0.1 0.2 0.9 0.9 1.0 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0
0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.4 0.4 0.4 0.4 0.2 0.1 0.1 0.1 0.2 0.4 0.4 0.4 0.3 0.1 0.1 0.1 0.1 0.2 0.3 0.3 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1 EXTERIOR PHOTOMETRICS
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 EL204 SCALE: NONE
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
MAINTENANCE
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U EXTERIOR PHOTOMETRICS Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EL204
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 600 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min 1. REFER TO DWG EL206 FOR LUMINAIRE SCHEDULE.
LOUNGE MECH
103 105
B B
0
6"
29.4 35.1 41.8 46.0 48.6 49.4 48.1 44.9 39.1 33.5 29.4 18.6 22.0 24.8 24.3 38.1 38.1
0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.7 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0
25.7 29.2 32.3 40.9 44.3 45.5 43.8 35.4 31.7 28.8 26.7 30.1 30.2 26.4 21.0 36.2 36.2
0.0 0.0 0.0 0.0 0.1 0.2 0.6 1.9 3.1 3.2 1.5 0.5 0.2 0.1 0.0 0.0 HALL
41.6 42.5 40.9
104
GG 18.3 19.1 19.2 25.5 30.1 33.2 27.3 24.5 21.4 17.9
0.0 0.0 0.0 0.0 0.2 0.8 1.5 2.8 4.8 4.4 2.5 1.4 0.7 0.2 0.0 0.0
36.6 39.7 34.8
4
17.7 18.1 19.1 26.5 29.9 30.9 29.1 27.4 23.6 19.1
0.0 0.0 0.0 0.1 0.3 0.9 1.4 2.3 2.7 2.8 2.1 1.3 0.8 0.3 0.1 0.0 32.5 34.3 31.7
17.2 17.9 17.4 LOCKERS
25.3 28.3 28.7 27.7 26.4 23.0 18.9
107
D 0.0 0.0 0.0 0.1 0.3 0.8 1.3 1.8 1.7 1.7 1.7 1.3 0.8 0.4 0.1 0.0
D
14.0 15.3 14.1 22.1 24.1 24.4 24.0 22.7 20.4 17.3
20.5 22.7 19.9
0.0 0.0 0.0 0.1 0.3 0.7 1.2 1.6 1.7 1.7 1.8 1.4 0.9 0.4 0.2 0.1 22.9 25.1 22.1 7.3 8.7 10.7 13.3 15.8 16.8 16.0 12.6 12.3 11.0 9.2
21.0 22.8 20.3 7.2 9.0 12.0 16.1 20.4 22.0 20.4 16.2 15.1 12.7 10.6
0
0.0 0.0 0.0 0.1 0.2 0.6 1.1 1.7 2.4 2.5 2.4 1.6 1.0 0.5 0.1 0.0
23.0 25.5 22.3 7.3 9.3 12.7 18.0 23.5 25.7 23.2 18.2 17.0 13.6 10.7
0.0 0.0 0.0 0.0 0.1 0.5 1.2 2.1 3.3 4.3 3.0 1.9 1.1 0.4 0.1 0.0
18.8 20.7 18.3 7.3 9.1 12.3 17.2 22.1 24.2 22.9 17.1 16.1 13.2 10.2
0.0 0.0 0.0 0.0 0.1 0.3 0.9 1.7 3.7 GG 6.1 3.3 1.4 0.7 0.2 0.1 0.0
8
0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 1.0 0.9 0.9 0.3 0.1 0.0 0.0 0.0
E E
4
0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.5 0.5 0.5 0.3 0.1 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 VEST/
MUD ROOM MEN WOMEN
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
HONOR GUARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U INTERIOR AND EXTERIOR PHOTOMETRICS Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EL205
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 601 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
C LED HIGH BAY LED W/WIRE GUARD, MOUNT AT 12' 277V METALUX VT4LED-LD4-11-DR-277-L840-CD-1-WL-U
AFF 102.4W
6"
F LED WALL MOUNT VANITY LIGHT, TOP OF FIXTURE 120-277V WILLIAMS WMAUD-2-L32/835D-AF-UNV
Statistics 12" BELOW CEILING HEIGHT 40W
G LED HIGH PERFORMANCE RECESSED 2'x2' LED 277V FINELITE HPR LED-F-2x2-DCO-HO-3500K-277V-SC-C1-OBD
Description Symbol Avg Max Min Max/Min Avg/Min W/INTEGRAL DAYLIGHTING SENSOR 41.3W
B Pump Room 36.8 fc 50.5 fc 19.9 fc 2.5:1 1.8:1 H FL 1'X4' SURFACE MOUNT, 28WT5 120-277V LITHONIA MVS-M-4-2-28T5-N1-D20-MVOLT-GEB10PS B
28W
Meter Room 26.5 fc 39.2 fc 15.6 fc 2.5:1 1.7:1
J LED HIGH PERFORMANCE RECESSED 2'x2' LED 120V FINELITE HPR LED-F-2x2-DCO-HO-3500K-120V-SC-C1
41.3W
0
K LED PLANAR LARGE LED PENDANT, ADJUST 120V HUBBARDTON FORGE 139720 - FINISH 03
28W
6"
29.2 36.3 44.3 50.2 50.5 45.1 37.3 30.0 S LED 6" SHOWER DOWNLIGHT 277V GOTHAM ALED-35-18-6-DFR-277
38.5W
31.6 38.6 45.4 49.8 50.1 46.2 40.5 34.4 T LED 6" LED DOWNLIGHT 277V WILLIAMS LEDS60-1100-35K-CS-ED*OS-277
18W
4
33.7 40.4 46.0 48.9 48.9 46.8 43.2 38.2 U LED PLANAR SMALL LED PENDANT, ADJUST 120V HUBBARDTON FORGE #139718D-05L-NO, BRONZE
PENDANT FOR 60" OVERALL HEIGHT 24W
33.6 39.8 44.2 45.7 45.8 44.8 43.0 38.9
V LED 6" LED DOWNLIGHT 120V WILLIAMS LEDS60-1100-35K-CS-ED*OS-277
D 18W D
30.8 35.6 38.8 39.9 39.8 39.4 38.3 35.2
W LED 4' WALL MOUNTED LED STRIP LIGHT / TASK 120-277V LITHONIA ZL2N-L48-5000LM-MDD-MVOLT-50K-90CRI-GALV
LIGHT 75W
26.1 29.3 31.5 32.4 32.6 32.2 31.3 29.0
X LED HIGH PERFORMANCE RECESSED 2'x4' LED 120V FINELITE HPR LED-F-2x4-DCO-HO-3500K-120V-SC-C1
57.5W
16.3 21.5 28.3 33.4 33.4 28.3 21.5 16.3
0
Y LED HIGH PERFORMANCE RECESSED 2'x4' LED 120V FINELITE HPR LED-F-2x4-DCO-HO-3500K-120V-SC-C1-OBD
W/INTEGRAL DAYLIGHTING SENSOR 57.5W
17.5 24.0 31.9 37.8 37.8 31.9 24.0 17.6
EX LED ROTATING EDGE LIT EXIT SIGN W/GREEN 120-277V LIGHT FIXTURE ELRT-G
18.1 24.9 32.9 39.2 39.2 33.0 24.9 18.1 LETTERING <5W INDUSTRIES
DD LED EXTERIOR SPOTLIGHT FOR FLAGS & ENTRY 120-277V RAB LIGHTING EZLED-78-SF-N-PC2
E 17.1 22.8 29.8 35.1 35.2 29.9 23.0 17.2 SIGN, W/INTEGRAL PHOTOCELL 78W E
EE LED EMERGENCY LIGHTING UNIT, INCLUDE FIELD 120-277V HUBBELL PGN-Z
15.6 20.2 25.5 30.4 30.6 25.8 20.4 15.9 INSTALLED FULL CUT-OFF SHIELD 17W
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
PUMP STATION INTERIOR PHOTOMETRICS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U AND LUMINAIRE SCHEDULE Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EL206
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 602 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
GEN ANUNC PNL 1. EQUIPMENT SHOWN WITH BOLD LINEWEIGHTS INDICATES EQUIPMENT TO
ASTRONOMICAL TIMECLOCK AHU-2 HEAT DISC BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
DISCONNECT SCHEDULE XFMR 01-ET1(OVERHEAD) AHU-2 DISC
1 CU-1 3 POLE, 30 AMP, NON-FUSED, NEMA 3R AHU-1 HEAT DISC 2. MAINTAIN NEC REQUIRED CLEARANCES FOR ALL ELECTRICAL EQUIPMENT.
01-ATS-E1
2 CU-2 3 POLE, 30 AMP, NON-FUSED, NEMA 3R 01-ATS-N1 01-NL2#1 AHU-1 DISC 3. GROUND BUILDING STEEL COLUMNS PER DETAIL 4 ON DWG EP602.
A 01-NL2#3 A
3 AHU-2 HEAT 2 POLE, 60 AMP, NON-FUSED, NEMA 1
4 AHU-2 2 POLE, 30 AMP, NON-FUSED, NEMA 1 3 5 UTILITY METER (NEMA 3R)
5 AHU-1 HEAT 2 POLE, 60 AMP, NON-FUSED, NEMA 1 4
6 SERVICE ENTRANCE DISC (NORM, NEMA 3R) # KEY NOTES:
0
#8 #8
6 AHU-1 2 POLE, 30 AMP, NON-FUSED, NEMA 1 1. SERVICE TRANSFORMER FURNISHED AND INSTALLED BY OTHERS.
01-NL1#10 01-NL1 01-NL1 01-NL1 9
2 POLE, 30 AMP, NON-FUSED, NEMA 1 6 01-NL1
6"
7 WH-1 10
(PART) #35,37 #31,33 #27,29 SERVICE ENTRANCE DISC (EM, NEMA 3R) 2. FURNISH AND INSTALL JUNCTION BOX TO PROVIDE POWER TO MOTORIZED
6 #39,41
13 GENERATOR DISC (NORM, NEMA 3R) SHADES. COORDINATE LOCATION WITH SHADE INSTALLATION.
GENERATOR DISC (EM, NEMA 3R) 3. FURNISH AND INSTALL GFCI RECEPTACLE AND J-BOX AS NECESSARY FOR
01-EL1#3 CONNECTION OF AUTOSINKS, AUTOFLUSH, AND SOAP DISPENSERS IN
2
01-NL1#38
XFMR 01-NT1(OVERHEAD)
PNL 01-EL1
ADJACENT RESTROOMS. UTILIZE SAME CIRCUIT FOR CIRCULATING PUMP
CP-1.
01-DS1
4. COORDINATE RECEPTACLE LOCATION WITH MONITOR INSTALLATION
KWH METER
LOCATION. REFER TO ARCHITECTURAL DRAWINGS.
01-EL2#1,3,5
FIRE ALARM CONTROL PANEL
PNL 01-NH1
WH-1
7 01-NL1#12 5. REFER TO MANUFACTURER'S DOCUMENTATION FOR GENERATOR
B PNL 01-NL1 AUXILIARY LOAD TERMINATION POINTS WITHIN GENERATOR ENCLOSURE.
B
PNL 01-NL2 #10
01-NL1-22,24 6. MOUNT XFMR IN OVERHEAD. BOTTOM OF XFMR AT 7 FEET AFF.
7. COORDINATE RECEPTACLE HEIGHT WITH GRAVESITE LOCATOR KIOSK
ENLARGED POWER PLAN - RM 107 & 109 INSTALLATION TO ENSURE KIOSK POWER CORD WILL REACH RECEPTACLE.
0
2
EP101 SCALE: 1/4" = 1'-0" 8. FURNISH AND INSTALL DIESEL GENERATOR WITH INTEGRAL
6"
(PART) HAC FAMILY DIR ELEC DATA ENTRANCE DISCONNECTS. COORDINATE GUTTER LOCATION WITH OTHER
102 103 105 107 108 ELECTRICAL EQUIPMENT IN THIS AREA WHILE AVOIDING ANY BLOCKAGE TO
GFCI THE MECHANICAL SYSTEM LOUVERS.
01-NL1#26
WP
(PART)
C 01-NL1#26
10. ROUTE CONDUITS FROM SERVICE DISCONNECTS TO AUTOMATIC C
VEST TRANSFER SWITCHES UNDER BUILDING FOUNDATION AND STUB UP INTO
01-NL1#18 (PART) SWITCH.
2 101A 1
01-NL1#9 01-NL1#11 2
01-NL1#36 01-NL1#15 11. FURNISH AND INSTALL (1) L21-20P PLUG FOR USE IN PROVIDING POWER TO
UH-3 (PART) GFCI 2 (PART) EP101
2 1 THE METERED RACK PDU.
GFCI 01-NH1#26,28,30 XFMR
TO
0
EF-3 WP CU-2 CU-1 12. COORDINATE CONDUIT STUB UP LOCATION WITH GENERATOR SHOP
01-NH1#32,34,36 DRAWINGS.
01-NH1#31,33,35 STOR 13. FURNISH AND INSTALL KWH METER PER PROJECT SPECIFICATIONS. METER
OPEN OFFICE OS DUCTBANK:
106 PNL 01-EL2 SHALL BE HOUSED IN A NEMA 1 ENCLOSURE. REFER TO DWG EP401 FOR
2 104 DUCTBANK: (1)3"C
LOBBY / REC CONNECTION REQUIREMENTS. ROUTE CAT 6 CABLE IN 3/4" CONDUIT FROM
+72" 01-NL2#21 (1)2"C
01-NL1#13
MECH METER TO OIT ROOM 108. PROVIDE ENOUGH CABLE TO REACH SERVER
4
101 (1)1-1/2"C
(PART) 01-NL1#23 01-NL1#38 CONNECTION POINT BUT DO NOT TERMINATE CABLE ON SERVER.
OS 109 WP GFCI 12 (C)3/4"C
01-EL2#7 8
4 OS
TO
EF-4 01-NL1#11 01-GEN1 14. COORDINATE RECEPTACLE LOCATION WITH MICROWAVE INSTALLATION
01-EL2#1,3,5
(PART) LOCATION.
2 01-NL1#9 11
D 4 01-NL2#21
CORR
(PART)
UH-1
01-NL1#10(PART) 01-NH1#19,21,23
01-NL2#5 D
GFCI 01-NL2#15 01-NL1#17 111 01-NL2#7
(PART) ACCESS CONTROL PANEL
+72" 01-NL1#34 01-NL2#27
GFCI GFCI TO
HAC VEST 5
GFCI EF-2
01-NL1#28 AC
WP HAND 01-NL1#6 01-NL1#8 112 110
HAND AC
01-NL1#7 AC 01-NL2#25
DRYER DRYER
GFCI 01-NL1#20
TOILET
3
TOILET +48" GFCI
0
(PART) AC GFCI 14
GFCI GFCI 115 114
OPS AC
01-NL1#32 01-NL2#13
3
GS LOC 117 01-NL1#25 DISP
01-NL1#30 01-NL1#3 01-NL1#19 01-NL1#14
TO
119 GFCI
EF-1 UH-2
AC 01-NL1#21 01-NL2#11
7 01-NL2#23
01-NL1#5 AC 01-NL1#16
01-NH1#25,27,29
8
2 GFCI
WP
E 01-NL1#26 E
01-NL1#11 OP STOR LUNCH
(PART) (PART)
GFCI 116 113
4
WP 01-NL1#7
(PART)
0' 2' 4' 8'
MULTI / MEETING
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U POWER PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP101
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 603 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
TO
4 WH-2 2 POLE, 30 AMP, NON-FUSED, NEMA 1 GPS BASE STATION PNL 02-EH1 2. FURNISH AND INSTALL RECEPTACLE AND J-BOXES AS NECESSARY FOR
5 AIR COMPRESSOR 3 POLE, 60 AMP, NON-FUSED, NEMA 3R EQUIPMENT 02-NL1#5 115 CONNECTION OF AUTOSINKS, AUTOFLUSH, AND SOAP DISPENSERS IN
PNL 02-EL1 ADJACENT RESTROOMS.
02-NL2#10 02-EL1#1
02-ATS- 02-ATS-
UP 3. FURNISH AND INSTALL GFCI RECEPTACLE AND J-BOX AS NECESSARY FOR
FIRE ALARM
2
N1 E1 CONNECTION OF AUTOFLUSH(ES).
CONTROL PANEL
4. COORDINATE RECEPTACLE LOCATION WITH MONITOR INSTALLATION
4 LOCATION. REFER TO ARCHITECTURAL DRAWINGS.
XFMR 02-NT1 #10 WH-2
(OVERHEAD) 5. REFER TO MANUFACTURER'S DOCUMENTATION FOR GENERATOR
02-NL1#32,34 AUXILIARY LOAD TERMINATION POINTS WITHIN GENERATOR ENCLOSURE.
B B
6. COORDINATE RECEPTACLE LOCATION WITH WORK BENCH INSTALLATION.
7. COORDINATE ELECTRICAL CONNECTION TO EQUIPMENT LIFT WITH
INSTALLED LOCATION AND MANUFACTURER'S DOCUMENTATION.
02-NL2#14
0
#8 DWG EP602.
2 3
9. FURNISH AND INSTALL GUTTER AND NECESSARY ELECTRICAL
COMPONENTS TO ALLOW FOR THE UTLITY AND GENERATOR FEEDS TO BE
2 ENLARGED POWER PLAN - RM 110 3 POWER PLAN - MEZZANINE SPLIT INTO NORMAL AND EMERGENCY FEEDS TO ASSOCIATED SERVICE
EP102 SCALE: 1/4" = 1'-0" EP102 SCALE: 1/8" = 1'-0" ENTRANCE DISCONNECTS. COORDINATE GUTTER LOCATION WITH OTHER
4
02-NL2#1
1 GFCI
(PART) GFCI 14. COORDINATE RECEPTACLE LOCATION WITH MICROWAVE INSTALLATION
GFCI GFCI +36" GFCI +36" GFCI +36" GFCI +36" +36" 3
+36" WP WP AFF WP AFF WP AFF WP AFF AFF WP 3 VESTIBULE OS LOCATION.
XFMR 02-NL2#21 GFCI 02-NL1#7
AFF 02-NL2#19 101 OS
02-NL2#15 GFCI
D 02-NL2#7 TO EF-6 UH-4 D
EF-7 TO
WP 02-EL2 WOMEN HR / LINK STATION/
(PART) EQUIPMENT +36" ACCESS CONTROL PANEL 2 MEN TO
02-NL2#37
LIFT 02-NL1#3 02-NL1#1 EF-5 107 COTR OFFICE
AFF 109 02-NH1-31,33,35
7 103
02-EL2#7
DUCTBANK: OS
02-NL1#37,39 02-NL2#23 02-NL2#35
(1)3"C DOOR VEHICLE AND GFCI
MOTORIZED DAMPER OPERATOR 02-NL1#15 02-NL2#3
02-NL2#20 EQUIPMENT STORAGE 02-NL1#27 13 GFCI HAND HAND GFCI 02-NL2#17 OS (PART)
0
02-NL2#7 114
DRYER DRYER
(PART) DOOR 02-NL1#2 02-NL1#4 02-EL2#1,3,5 02-NL2#39
02-NL2#5 UP
02-NL1#17 CORRIDOR GFCI
OPERATOR HAC
(PART) GFCI 02-NL2#25 WP
GFCI WP DOOR 02-NL1#20 02-NL2#29 102 104
UTILITY METER (NEMA 3R) +48"AFF GFCI
WP OPERATOR 02-NL1#41
CT CABINET (NEMA 3R) DOOR ELEC +72"
+36" 02-NL1#6 DOOR 02-NL1#12 R
SERVICE ENTRANCE DISC (NORM,NEMA 3R) 02-NL1#8 DOOR GFCI 4 OS
AFF OPERATOR
OPERATOR
OPERATOR 110 14 GFCI DISP 02-NL2#8
SERVICE ENTRANCE DISC (EM,NEMA 3R) AC AC OS
OS
8
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
MAINTENANCE
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U POWER PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP102
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 604 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
# KEY NOTES:
0
?
105
03-NL1#11 03-NL1#21 CU-4
6"
03-NL1#18 4
GFCI
GFCI
WP 03-NL1#10
XFMR DISCONNECT SCHEDULE
AC EF-9 1 AHU-4 2 POLE, 30 AMP, NON-FUSED, NEMA 1
5 03-NL1#14 WH-3
03-NL1#17 2 AHU-4 HEAT 2 POLE, 30 AMP, NON-FUSED, NEMA 1
3
03-NL1#9 GFCI 3 WH-3 1 POLE, 30 AMP, NON-FUSED, NEMA 1
LOUNGE AC 03-NL1#29 UTILITY METER (NEMA 3R)
4 CU-4 2 POLE, 30 AMP, NON-FUSED, NEMA 3R
103 03-NL1#13 SERVICE ENTRANCE DISC (NEMA 3R)
4
03-NL1#12 DUCTBANK:
DISP ACCESS CONTROL PANEL
(1)2"C
FIRE ALARM CONTROL PANEL
C 03-NL1#23,25,27 C
03-NL1#15 4
ASTRONOMICAL TIMECLOCK
PNL 03-NL1 03-NL1#19
STORAGE
106
0
GFCI HALL
WP 104
GUN
SAFE
03-NL1#5 LOCKERS
(PART) 102
107
4
D MEN WOMEN D
VEST/ 108
MUD ROOM 109
101
UH-5 GFCI
03-NL1#7 WP
0
GFCI 03-NL1#3
03-NL1#5 WP
8
(PART)
E E
4
1 POWER PLAN
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
HONOR GUARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U POWER PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP103
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 605 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
A 3. THE POWER PLAN SHOWN REPRESENTS BOTH THE NORTH AND SOUTH A
COMMITTAL SERVICE SHELTERS. SERVICE TRANSFORMER LOCATIONS
DIFFER FROM NORTH AND SOUTH LOCATIONS. REFER TO SITE ELECTRICAL
DRAWINGS FOR TRANSFORMER LOCATIONS.
0
KEY NOTES:
6"
B B
0
6"
4
GFCI
C GFCI C
WP
WP
04-NL1#2
UTILITY METER (NEMA 3R)
SERVICE ENTRANCE DISC (NEMA 3R)
0
PNL 04-NL1
ASTRONOMICAL TIMECLOCK
4
04-NL1#11
D STORAGE 04-NL1#6 D
101
102
04-NL1#1
0
2
04-NL1#13
8
E 04-NL1#4 E
4
GFCI GFCI
WP WP
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
COMMITTAL SERVICE SHELTER
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U POWER PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP104
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 606 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
# KEY NOTES:
0
B B
XFMR
0
6"
05-NH1#1
4
C C
PUMP STATION 05-NH1#14,16,18 DUCTBANK:
350 kcmil
102 (2)2-1/2"C
0
05-NL1#5
EXH FAN
4
GFCI
05-NL1#1 XFMR 05-NT1
0
ASTRONOMICAL TIMECLOCK
METERING
101
8
E 2 E
05-NH1#19,21,23
4
POWER PLAN
0
1
EP105 SCALE: 1/4" = 1'-0" 0' 2' 4' 8'
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
PUMP STATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U POWER PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EP105
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 607 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
RECEPTACLE.
2
B B
CKT#1, (2#8+#8G)3/4"C
1
4
WP
GFCI
C C
(2#12+1#12G)3/4"C
ASSEMBLY AREA TRANSFORMER (BY UTILITY)
0
4
D D
0
WP
GFCI
8
E E
4
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ASSEMBLY AREA
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U POWER PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP106
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 608 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
A # KEY NOTES: A
1. FURNISH AND INSTALL BOLLARD OR POST WITH INTEGRAL DUPLEX GFCI
RECEPTACLE WITH IN-USE COVER.
0
3
4. INSTALL A GPS ANTENNA ON A CONCRETE FOUNDATION. REFER TO
02-NL1#22,24 02-NL2#2,4 STRUCTURAL DWGS FOR DETAIL. CONNECT ANTENNA TO GPS BASE
STATION EQUIPMENT TO BE LOCATED IN THE ELECTRICAL ROOM.
B B
0
6"
4
C C
0
4
MAINTENANCE
BLDG
PNL 02-NL2
D D
GPS ANTENNA
4 02-NL2-18 1
0
1 02-NL2-16
02-NL2-22
8
2
1 1
E E
4
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
MAINTENANCE YARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U POWER PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP107
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 609 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
A # KEY NOTES: A
1. FURNISH AND INSTALL EQUIPMENT PAD FOR NEW 100 AMP PEDESTAL.
2. FURNISH AND INSTALL A SINGLE PHASE 208 VOLT ENTRANCE GATE
0
PEDESTAL#5,7
PEDESTAL#4 #10
2 2
#10 WP
B PEDESTAL#1,3 1 GFCI 1
B
ENTRANCE PEDESTAL FOUNDATION AND 100A EP109
PEDESTAL WITH INTEGRAL UTILITY METER
ENTRANCE GATE TRANSFORMER (BY UTILITY)
0
6"
4
C C
0
4
D D
0
8
E E
4
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
MAIN ENTRANCE AND ETO YARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U POWER PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP108
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 610 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
A # KEY NOTES: A
1. PROVIDE J-BOX FOR THE CONNECTION OF IRRIGATION CONTROLLER.
CIRCUIT AS DESIGNATED ON DRAWING.
0
DUCT BANK:
(2) 1-1/2"C
ETO-12 (1) 1-1/4"C
WP ETO-10 (1) 1"C
1 GFCI (1) 3/4"C
4
TRAILER SERVICE
PNL L1(EXISTING)
ETO#2
C DUCTBANK: C
(2)1-1/2"C 3
(1)1"C
(1)3/4"C
WP 2
GFCI DUCTBANK
(2)1-1/2"C
(1)1"C
4
4
8
E E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ETO YARD ENLARGED
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U POWER PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP109
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 611 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A # KEY NOTES: A
1. FURNISH AND INSTALL A 12"x12"x12" MINIMUM HANDHOLE AT FUTURE
CARILLON TOWER LOCATION AND LABEL IT "CARILLON (FUTURE)".
0
2. STUB UP 2" PVC CONDUIT IN OIT ROOM 107 FOR FUTURE USE WITH
CARILLON TOWER.
6"
2
B B
0
6"
ADMIN/PIC
BUILDING
ASSEMBLY
AREA
2
4
C C
0
4
D D
0
E E
4
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
CARILLON TOWER
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U CONDUIT PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP110
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 612 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES
2
# KEY NOTES
1. COPPER DOWN CONDUCTORS FROM THE ROOF DOWN TO THE GROUND.
(TYP.)
2
3
EP603
4
D 2 D
0
90° MIN.
90° MIN.
8
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U LIGHTNING PROTECTION PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP301
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 613 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES
2
# KEY NOTES
1. COPPER DOWN CONDUCTORS FROM THE ROOF DOWN TO THE GROUND.
(TYP.)
2
3
EP603
0
4
D D
2
4
LIGHTNING PROTECTION PLAN
0
1 EP603
EP302 SCALE: 1/8" = 1'-0"
LESS THAN 8" RADIUS
8" RADIUS MIN.
90° MIN.
90° MIN.
8
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
MAINTENANCE
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U LIGHTNING PROTECTION PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EP302
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 614 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES
2
1
6"
# KEY NOTES
1. COPPER DOWN CONDUCTORS FROM THE ROOF DOWN TO THE GROUND.
(TYP.)
3
2
B B
LEGEND
LIGHTNING PROTECTION CABLE - 24 STRANDS OF #14 ALUMINUM WIRE,
AREA OF CONDUCTIVITY 98,640 cmil.
0
D D
0
2
LESS THAN 8" RADIUS
8" RADIUS MIN.
4
EP603
90° MIN.
90° MIN.
1 LIGHTNING PROTECTION PLAN
8
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
HONOR GUARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U LIGHTNING PROTECTION PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EP303
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 615 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES
2
1
# KEY NOTES
1. COPPER DOWN CONDUCTORS FROM THE ROOF DOWN TO THE GROUND.
3 (TYP.)
EP603
2
B B
LEGEND
LIGHTNING PROTECTION CABLE - 24 STRANDS OF #14 ALUMINUM WIRE,
AREA OF CONDUCTIVITY 98,640 cmil.
0
EP603 1 :12 1 :12 THROUGH ROOF PENETRATION - 1" PVC INSTALLED BY ELECTRICAL
CONTRACTOR DOWN TO GROUND. FLASHING DONE BY ROOFING
CONTRACTOR.
C C
0
4
D 2
D
4
EP603
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
COMMITTAL SERVICE SHELTER
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U LIGHTNING PROTECTION PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EP304
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 616 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES
2
# KEY NOTES
1
1. COPPER DOWN CONDUCTORS FROM THE ROOF DOWN TO THE GROUND.
(TYP.)
3
2
B B
LEGEND
LIGHTNING PROTECTION CABLE - 24 STRANDS OF #14 ALUMINUM WIRE,
AREA OF CONDUCTIVITY 98,640 cmil.
0
1 :12
4
D D
0
2
LESS THAN 8" RADIUS
8" RADIUS MIN. 4
EP603
90° MIN.
90° MIN.
LIGHTNING PROTECTION PLAN
8
1
ACCEPTABLE NOT ACCEPTABLE
EP305 SCALE: 1/4" = 1'-0"
E 8" RADIUS
E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
PUMP STATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U LIGHTNING PROTECTION PLAN Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP305
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 617 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
112.5kVA G 480/277V 150kVA G 480/277V 1. FURNISH AND INSTALL PANELBOARD WITH INTEGRAL TYPE 2 SURGE
15kV-480/277V,3Ø,4W 3Ø,4W 15kV-480/277V,3Ø,4W 3Ø,4W PROTECTIVE DEVICE.
6"
Isc=3,567A
D (4#6+#10G)1-1/4"C 2[(4#3/0+#1/0G)2-1/2"C] (4#10+#10G)1-1/2"C
D
(4#3/0+#4G)2-1/2"C
01-EL1 02-NL1 02-EL1
01-NL1
400A, 300A MCB
200A, 200A MCB 125A, 50A MCB 125A, 30A MCB
208/120V,3Ø,4W
208/120V,3Ø,4W 208/120V,3Ø,4W 208/120V,3Ø,4W
FEED THRU LUGS
FEED THRU LUGS
0
(4#10+#10G)3/4"C (4#10+#10G)3/4"C
(4#3/0+#6G)2-1/2"C 2[(4#3/0+#2G)2-1/2"C]
01-EL2 02-EL2
01-NL2 02-NL2
125A, MLO 125A, MLO
208/120V,3Ø,4W 400A, MLO 208/120V,3Ø,4W
400A, MLO
208/120V,3Ø,4W
208/120V,3Ø,4W
8
E E
4
1 ONE-LINE DIAGRAM
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ELECTRICAL ONE-LINE DIAGRAM
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP401
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 618 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
45kVA 45kVA 45kVA 45kVA XFMR 500kVA 1. FURNISH AND INSTALL PANELBOARD WITH INTEGRAL TYPE 2 SURGE
15kV-208/120V,3Ø,4W 15kV-208/120V,3Ø,4W 15kV-208/120V,3Ø,4W 15kV-208/120V,3Ø,4W 15kV-480/277V,3Ø,4W PROTECTIVE DEVICE.
6"
(BY UTILITY) (BY UTILITY) (BY UTILITY) (BY UTILITY) (BY UTILITY) 2. ENSURE PANELBOARD 05-NH1 IS CAPABLE OF HOUSING A 300A, 3 POLE
Isc=13,879A Isc=13,879A Isc=13,879A Isc=13,879A Isc=51,463A BREAKER TO FEED PUMP SKID.
(4#6)1-1/4"C (4#6)1-1/4"C (4#1/0)2"C (4#1)1-1/2"C 2[(4#3/0)2-1/2"C]
Isc=6,345A Isc=6,345A UTILITY UTILITY
M M
2
(3#12+#12G)3/4"C
4
1 2
Isc=17,837A
C (4#350KCMIL+#2G)3"C 05-NT1 C
ETO 15kVA
SERVICE XFMR 480V-208/120V
150kVA
15kV-208/120V,3Ø,4W Isc=820A
(BY UTILITY) (4#8+#10G)1"C
Isc=16,726A
0
05-NL1
PUMP
(4#3/0)2-1/2"C SKID 100A, 40A MCB
PANEL 208/120V,3Ø,4W
4
PEDESTAL
Isc=12,029A
W/INTEGRAL
ETO UTILITY METER
D 1 200A, 200A MCB D
208/120V,3Ø,4W,NEMA 3R
0
L1 (E)ETO HONOR L2 (E)ETO RESTROOM L3 (E)ETO ADMIN L4 (E)ETO MAINT. L5 (E)ETO MAINT.
GUARD TRAILER TRAILER TRAILER TRAILER SHED
100A MLO 100A MLO 225A MLO 225A MLO 100A MLO
8
E E
4
1 ONE-LINE DIAGRAM
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ELECTRICAL ONE-LINE DIAGRAM
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP402
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 619 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
0
6"
2
Branch Panel: 01-NH1 AES Group, Inc Branch Panel: 01-NL1 AES Group, Inc
480Y/277 BUS: 200A COPPER LOCATION: ELECT. ROOM 108 208Y/120 BUS: 200A COPPER LOCATION: ELECT. ROOM 108
B 3Phase, 4Wire + Gnd MAINS TYPE: 175A MCB MANUFACTURE: 3Phase, 4Wire + Gnd MAINS TYPE: 200A MCB MANUFACTURE: B
14K AIC TYPE: 10K AIC TYPE:
NOTES: DATE: NOTES: DATE:
SUPPLY FROM: 01-ATS-N1 SUPPLY FROM: 01-NH1 VIA XFMR 01-NT1
0
SPARE 1 20 9 0 0 10 20 1 SPARE RECEPTS - VESTIBULES/CORRIDOR 1 20 9 540 900 10 20 1 RECEPTS - ROOM 107, 108
SPARE 1 20 11 0 0 12 20 1 SPARE RECEPTS - BUILDING EXTERIOR 1 20 11 1080 720 12 20 1 RECEPTS - ROOM 109
UH-2 3 15 25 767 1222 26 15 3 CU-1 RECEPTS - ROOM 116, 117 1 20 25 900 1500 26 20 1 MOTORIZED SHADES - RMS 101,104,118
--- I I 27 767 1222 28 I I --- AHU-1 2 15 27 916 1800 28 20 1 HAND DRYER - RESTROOM 120
--- I I 29 767 1222 30 I I --- --- I I 29 916 1800 30 20 1 HAND DRYER - RESTROOM 121
UH-3 3 15 31 767 1222 32 15 3 CU-2 AHU-1 HEATER 2 40 31 3600 667 32 20 1 EF-1
33 34 33 34 20
4
CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED CONNECTED LOAD LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED
PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 480Y/277 Volts PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 208Y/120 Volts
0
A PHASE 23679.0 LIGHTING 4,836 125% 6045 7.3 A PHASE 17869 LIGHTING 2,866 125% 3583 9.9
B PHASE 27548.0 RECEPT 10,000 100% 10000 12.0 B PHASE 21898 RECEPT 10,000 100% 10000 27.8
C PHASE 24733.0 RECEPT 3,680 50% 1840 2.2 C PHASE 19988 RECEPT 3,680 50% 1840 5.1
MOTOR 28,984 100% 28984 34.9 MOTOR 14,749 100% 14749 40.9
TOTAL 75960.0 LRGST MTR 3,666 25% 917 1.1 TOTAL 59755.0 LRGST MTR 1,832 25% 458 1.3
DOWNSTREAM LOADS ARE INCLUDED IN CALC'D MISC 28,460 100% 28460 34.2 DOWNSTREAM LOADS ARE INCLUDED IN CALC'D MISC 28,460 100% 28460 79.0
LOADS SHOWN IN THIS PANEL LOADS SHOWN IN THIS PANEL
8
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U PANEL SCHEDULES Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP501
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 620 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
0
6"
2
Branch Panel: 01-NL2 AES Group, Inc Branch Panel: 01-EL1 AES Group, Inc
208Y/120 BUS: 200A COPPER LOCATION: ELECT. ROOM 108 208Y/120 BUS: 125A COPPER LOCATION: ELECT. ROOM 107
B 3Phase, 4Wire + Gnd MAINS TYPE: MLO MANUFACTURE: 3Phase, 4Wire + Gnd MAINS TYPE: 50A MCB MANUFACTURE: B
10K AIC TYPE: 10K AIC TYPE:
NOTES: DATE: NOTES: DATE:
SUPPLY FROM: 01-NL1 SUPPLY FROM: 01-EH1 VIA 01-ET1
0
SPARE 1 20 33 0 0 34 20 1 SPARE \
SPARE 1 20 35 0 0 36 20 1 SPARE CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED
SPARE 1 20 37 0 0 38 20 1 SPARE PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 208Y/120 Volts
SPARE 1 20 39 0 0 40 20 1 SPARE A PHASE 2788.0 LIGHTING 1,688 125% 2110 5.9
D SPARE 1 20 41 0 0 42 20 1 SPARE D
B PHASE 2800.0 RECEPT 0 100% 0 0.0
4810 0 3100 0 4750 0 C PHASE 1000.0 RECEPT 0 50% 0 0.0
\
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U PANEL SCHEDULE (CONTINUED) Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EP502
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 621 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
0
6"
2
MOUNTING: SURFACE
6"
ENCLOSURE: NEMA 1
N ID DESCRIPTION P BKR CKT A B C CKT BKR P DESCRIPTION ID N
METERED RACK PDU 3 20 1 1000 0 2 20 1 SPARE
--- I I 3 1000 0 4 20 1 SPARE
--- I I 5 1000 0 6 20 1 SPARE
ACCESS CONTROL PANEL 1 20 7 100 0 8 20 1 SPARE
4
SPARE 1 20 9 0 0 10 20 1 SPARE
SPARE 1 20 11 0 0 12 20 1 SPARE
C SPARE 1 20 13 0 0 14 20 1 SPARE
C
SPARE 1 20 15 0 0 16 20 1 SPARE
SPARE 1 20 17 0 0 18 20 1 SPARE
SPARE 1 20 19 0 0 20 20 1 SPARE
SPARE 1 20 21 0 0 22 20 1 SPARE
SPARE 1 20 23 0 0 24 20 1 SPARE
0
SPARE 1 20 25 0 0 26 20 1 SPARE
SPARE 1 20 27 0 0 28 20 1 SPARE
SPARE 1 20 29 0 0 30 20 1 SPARE
1100 0 1000 0 1000 0
4
CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED
PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 208Y/120 Volts
A PHASE 1100.0 LIGHTING 0 125% 0 0.0
D B PHASE
D
1000.0 RECEPT 0 100% 0 0.0
C PHASE 1000.0 RECEPT 0 50% 0 0.0
MOTOR 0 100% 0 0.0
TOTAL 3100.0 LRGST MTR 0 25% 0 0.0
DOWNSTREAM LOADS ARE INCLUDED IN CALC'D MISC 3,100 100% 3100 8.6
0
E E
4
0
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U PANEL SCHEDULE (CONTINUED) Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EP503
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 622 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
0
6"
2
Branch Panel: 02-NH1 AES Group, Inc Branch Panel: 02-NL1 AES Group, Inc
480Y/277 BUS: 200A COPPER LOCATION: ELECT. ROOM 110 208Y/120 BUS: 400A COPPER LOCATION: ELECT. ROOM 110
B 3Phase, 4Wire + Gnd MAINS TYPE: 175A MCB MANUFACTURE: 3Phase, 4Wire + Gnd MAINS TYPE: 300A MCB MANUFACTURE: B
14K AIC TYPE: 10K AIC TYPE:
NOTES: DATE: NOTES: DATE:
SUPPLY FROM: 02-ATS-N1 SUPPLY FROM: 02-NH1 VIA XFMR 02-NT1
0
C SPARE 1 20 13 0 0 14 20 1 SPARE GENERATOR BATTERY CHARGER 1 20 13 840 1800 14 20 1 RECEPT - VENDING MACHINE RM 108
C
SPARE 1 20 15 0 0 16 20 1 SPARE HAND DRYER - ROOM 107 1 20 15 1800 0 16 20 1 SPARE
SPARE 1 20 17 0 0 18 20 1 SPARE HAND DRYER - ROOM 109 1 20 17 1800 720 18 20 1 RECEPTS - ROOM 114
SPARE 1 20 19 0 0 20 20 1 SPARE GARBAGE DISPOSAL - ROOM 108 1 20 19 1500 1920 20 20 1 MICROWAVE 1
SPARE 1 20 21 0 0 22 20 1 SPARE REFRIGERATOR 1 20 21 800 2000 22 30 2 MAINTENANCE GATE OPERATOR
SPARE 1 20 23 0 0 24 20 1 SPARE EXTERIOR LIGHTING TIMECLOCK 1 20 23 500 2000 24 I I ---
0
SPARE 1 20 25 0 0 26 20 1 SPARE GENERATOR INTERIOR LIGHTS 1 20 25 100 625 26 20 2 CEILING FAN CF-3 & CF-4
SPARE 1 20 27 0 0 28 20 1 SPARE RECEPT - DRINKING FOUNTAIN 1 20 27 1500 625 28 I I ---
SPARE 1 20 29 0 0 30 20 1 SPARE GPS BASE STATION EQUIPMENT 1 20 29 180 0 30 20 1 SPARE
UH-4 3 15 31 667 1275 32 15 3 CU-3 SPARE 1 20 31 0 2500 32 30 2 WATER HEATER
33 34 I 33 34
4
CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED
PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 480Y/277 Volts PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 208Y/120 Volts
0
A PHASE 33215.0 LIGHTING 4,252 125% 5315 6.4 A PHASE 28649 LIGHTING 100 125% 125 0.3
B PHASE 32293.0 RECEPT 10,000 100% 10000 12.0 B PHASE 29719 RECEPT 10,000 100% 10000 27.8
C PHASE 32866.0 RECEPT 7,640 50% 3820 4.6 C PHASE 30028 RECEPT 7,640 50% 3820 10.6
MOTOR 32,001 100% 32001 38.5 MOTOR 28,176 100% 28176 78.2
TOTAL 98374.0 LRGST MTR 8,718 25% 2180 2.6 TOTAL 88396.0 LRGST MTR 8718 25% 2180 6.1
DOWNSTREAM LOADS ARE INCLUDED IN CALC'D MISC 44,480 100% 44480 53.5 DOWNSTREAM LOADS ARE INCLUDED IN CALC'D MISC 42,480 100% 42480 117.9
LOADS SHOWN IN THIS PANEL LOADS SHOWN IN THIS PANEL
8
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
MAINTENANCE
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U PANEL SCHEDULES Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EP504
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 623 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
0
6"
2
Branch Panel: 02-NL2 AES Group, Inc Branch Panel: 02-EH1 AES Group, Inc
208Y/120 BUS: 400A COPPER LOCATION: ELECT. ROOM 110 480Y/277 BUS: 125A COPPER LOCATION: ELECT. ROOM 108
B 3Phase, 4Wire + Gnd MAINS TYPE: MLO MANUFACTURE: 3Phase, 4Wire + Gnd MAINS TYPE: 50A MCB MANUFACTURE: B
10K AIC TYPE: 14K AIC TYPE:
NOTES: DATE: NOTES: DATE:
SUPPLY FROM: 02-NL1 SUPPLY FROM: 01-ATS-E1
0
RECEPTS - GFCI ROOM 107, 109 1 20 35 360 0 36 20 1 SPARE CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED
RECEPTS - ROOM 103 1 20 37 1080 0 38 20 1 SPARE PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 480Y/277 Volts
RECEPT - ROOM 104 1 20 39 180 0 40 20 1 SPARE A PHASE 4160.0 LIGHTING 3,313 125% 4141 5.0
D RECEPTS - ROOMS 103, 105 1 20 41 900 0 42 20 1 SPARE D
B PHASE 3053.0 RECEPT 0 100% 0 0.0
5580 6806 5580 7706 4680 6426 C PHASE 50%
1000.0 RECEPT 0 0 0.0
\
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
MAINTENANCE
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U PANEL SCHEDULES (CONTINUED) Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EP505
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 624 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
0
6"
2
Branch Panel: 02-EL1 AES Group, Inc Branch Panel: 02-EL2 AES Group, Inc
208Y/120 BUS: 125A COPPER LOCATION: ELECT. ROOM 108 208Y/120 BUS: 125A COPPER LOCATION: IT ROOM 111
B 3Phase, 4Wire + Gnd MAINS TYPE: 30A MCB MANUFACTURE: 3Phase, 4Wire + Gnd MAINS TYPE: MLO MANUFACTURE: B
10K AIC TYPE: 10K AIC TYPE:
NOTES: DATE: NOTES: DATE:
SUPPLY FROM: 01-EH1 VIA 01-ET1 SUPPLY FROM: 02-EL1
0
\ \
CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED
PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 208Y/120 Volts PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 208Y/120 Volts
A PHASE 2900.0 LIGHTING 0 125% 0 0.0 A PHASE 1100.0 LIGHTING 0 125% 0 0.0
D B PHASE B PHASE
D
1000.0 RECEPT 0 100% 0 0.0 1000.0 RECEPT 0 100% 0 0.0
C PHASE 1000.0 RECEPT 0 50% 0 0.0 C PHASE 1000.0 RECEPT 0 50% 0 0.0
MOTOR 0 100% 0 0.0 MOTOR 0 100% 0 0.0
TOTAL 4900.0 LRGST MTR 0 25% 0 0.0 TOTAL 3100.0 LRGST MTR 0 25% 0 0.0
DOWNSTREAM LOADS ARE INCLUDED IN CALC'D MISC 4,900 100% 4,900 13.6 DOWNSTREAM LOADS ARE INCLUDED IN CALC'D MISC 3,100 100% 3100 8.6
0
E E
4
0
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
MAINTENANCE
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U PANEL SCHEDULES (CONTINUED) Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EP506
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 625 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
NOTES: DATE:
6"
SPARE 1 20 1 0 515 2 20 1 LIGHTING CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED
AUTOFLUSH/SINK - ROOMS 108, 109 1 20 3 500 736 4 20 1 LIGHTING PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 208Y/120 Volts
RECEPTS - BLDG EXTERIOR 1 20 5 900 201 6 20 1 LIGHTING - EXTERIOR A PHASE 16366.0 LIGHTING 3,500 125% 4375 12.1
RECEPTS - GFCI'S ROOMS 108,109 1 20 7 360 0 8 20 1 SPARE
4
CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED
TOTAL 24207 23445 65.1
PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 208Y/120 Volts
E E
A PHASE 4195.0 LIGHTING 195 125% 244 0.7
B PHASE 2180.0 RECEPT 180 100% 180 0.5
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
HONOR GUARD, ETO AREA
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U & FRONT ENTRANCE PEDESTAL Construction
O
Building Number
NS
CR
COL
PANEL SCHEDULES
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EP507
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 626 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
0
6"
2
\ \
CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED
PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 208Y/120 Volts PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 208Y/120 Volts
A PHASE 994.0 LIGHTING 642 125% 803 2.2 A PHASE 360.0 LIGHTING 642 125% 803 1.8
D B PHASE B PHASE
D
468.0 RECEPT 900 100% 900 2.5 468.0 RECEPT 900 100% 900 2.5
C PHASE 814.0 RECEPT 0 50% 0 0.0 C PHASE 680.0 RECEPT 0 50% 0 0.0
MOTOR 0 100% 0 0.0 MOTOR 0 100% 0 0.0
TOTAL 2276.0 LRGST MTR 0 25% 0 0.0 TOTAL 1508.0 LRGST MTR 0 25% 0 0.0
DOWNSTREAM LOADS ARE INCLUDED IN CALC'D MISC 1,000 100% 1000 2.8 DOWNSTREAM LOADS ARE INCLUDED IN CALC'D MISC 500 100% 500 1.4
0
E E
4
0
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
COMMITTAL SERVICE SHELTER
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U PANEL SCHEDULES Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EP508
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 627 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
0
6"
2
Branch Panel: 05-NH1 AES Group, Inc Branch Panel: 05-NL1 AES Group, Inc
480Y/277 BUS: 400A COPPER LOCATION: PUMP STATION 208Y/120 BUS: 100A COPPER LOCATION: PUMP STATION
B 3Phase, 4Wire + Gnd MAINS TYPE: 400A MCB MANUFACTURE: 3Phase, 4Wire + Gnd MAINS TYPE: 50A MCB MANUFACTURE: B
65K AIC TYPE: 10K AIC TYPE:
NOTES: DATE: NOTES: DATE:
SUPPLY FROM: SERVICE ENTRANCE DISCONNECT SUPPLY FROM: SERVICE ENTRANCE DISCONNECT
0
\ \
CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED CONNECTED LOAD (Downstream Loads Included) LOAD SUMMARY WITH DOWNSTREAM LOADS INCLUDED
PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 480Y/277 Volts PHASE VA CATEGORY CONNECTED LOAD FACTOR CALC'D V-A AMPS @ 208Y/120 Volts
A PHASE 63678 LIGHTING 533 125% 666 0.8 A PHASE 360.0 LIGHTING 0 125% 0 0.0
D B PHASE B PHASE
D
62919 RECEPT 360 100% 360 0.4 1000.0 RECEPT 360 100% 360 1.0
C PHASE 63253 RECEPT 0 50% 0 0.0 C PHASE 667.0 RECEPT 0 50% 0 0.0
MOTOR 94,173 100% 94173 113.3 MOTOR 667 100% 667 1.9
TOTAL 189850.0 LRGST MTR 41,429 25% 10357 12.5 TOTAL 2027.0 LRGST MTR 667 25% 167 0.5
DOWNSTREAM LOADS ARE INCLUDED IN CALC'D MISC 11,002 100% 11002 13.2 DOWNSTREAM LOADS ARE INCLUDED IN CALC'D MISC 1,000 100% 1000 2.8
0
E E
4
0
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
PUMP STATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U PANEL SCHEDULES Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP509
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 628 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
0
6"
2
B B
0
6"
4
2 DUCTBANK DETAILS
EP601 SCALE: NONE
C C
0
4
D D
0
E E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ELECTRICAL DETAILS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP601
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 629 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
0
6"
2
B B
0
6"
4
C C
D D
0
L1B:2
8
E E
4
0
4 COLUMN GROUNDING DETAIL 5 LIGHTING CONTROL - TIMECLOCK ON/OFF DETAIL 6 TYPICAL POLE BASE DETAIL
EP602 SCALE: NONE EP602 SCALE: NONE EP602 SCALE: NONE
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A DO L IC E
Drawing Title
ELECTRICAL DETAILS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L E N
G
PHONE: (202) 632-5722 Date Checked Drawn EP602
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 630 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
8" MAX.
HIGHER ROOF SURFACE
1" PVC ROOF DECK 1" PVC ROOF DECK
2
B CABLE FASTENER B
CONDUCTER CABLE ALTERNATE
MAX. 2'-0"
FROM CORNER
PARAPIT CAP
3' COPPER CONDUCTOR
MA CABLE OUT TO GROUNDING
MINIMUM 1" PVC X.
0
SLEEVE
FLAT ROOF POINT BASE
6"
A X.
M
LOWER ROOF CABLE FASTENER ' - 0" ART
3 AP 1' DEPTH
MINIMUM 1" PVC
ROOF DECK SLEEVE
4
CONDUCTOR CABLE
C C
1 TRANSITION PVC DETAIL 2 FLAT POINT BASE & AIR TERMINAL 3 DOWNLEAD PVC DETAIL
EP603 SCALE: NONE EP603 SCALE: NONE EP603 SCALE: NONE
0
4
EXOTHERMIC
WELD CABLE
CONNECTION.
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ELECTRICAL DETAILS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U Construction
O
Building Number
NS
CR
COL
ED
RN
and Facilities
T .G.
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn EP603
03/09/2017 FAX: MARCH 2017 TGCT WBR
Revisions: Date Dwg. 631 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
SPECIAL SYSTEMS EQUIPMENT LIST GENERAL NOTES SPECIAL SYSTEM STANDARDS ABBREVIATIONS
GENERAL PAIR(UTP) LEVEL 5E/6, 24 AWG PLENUM RATED.
1. THE TERM "PROVIDE", WHERE USED HEREIN, SHALL MEAN THE SAME AS: INDUSTRY STANDARDS: CLPS COMMUNICATIONS LIGHTNING
A SYMBOL DESCRIPTION
12. TERMINATE PAIRS ACCORDING TO THE T568B WIRING SCHEME. PIN ALL 8
1. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) PROTECTION SYSTEM A
SURVEYED, FURNISHED, INSTALLED, AND TESTED BY CONTRACTOR. CONDUCTORS. MAXIMUM LINK LENGTH - 90 METERS, CHANNEL LENGTH - 100
2. ELECTRONIC INDUSTRIES ALLIANCE (EIA) CFM CONSTRUCTION & FACILITIES
TELEPHONE/DATA OUTLET - MOUNTED 18"(450mm) 2. THE TIP MUST BE INSTALLED IN ACCORDANCE WITH CFM'S MASTER METERS
3. TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA) MANAGEMENT
AFF UNLESS OTHERWISE NOTED CONSTRUCTION SPECIFICATIONS (PG-18-1) WHICH PROVIDES EQUIPMENT 13. TWO METER LONG LOOP OF CABLE SHALL BE LEFT WITHIN EACH
CMLPS COMMUNICATION MAIN LIGHTNING
0
AND SYSTEMS THAT MEET THE DESIGN INTENT IN TERMS OF 4. BUILDING INDUSTRY CONSULTING SERVICE INTERNATIONAL
COMMUNICATIONS ROOM/ENCLOSURE FOR FUTURE MODIFICATIONS.
(BICSI) PROTECTION SYSTEM
A TELEPHONE/DATA OUTLET - MOUNTED 3"(75mm) PERFORMANCE, QUALITY, AND COST. SLACK SHALL BE COILED AND SUPPORTED. 0.5-METER LOOP OF CABLE
6"
EQUIPMENT NEEDED FOR THE ANTICIPATED NUMBER OF LINES AND PORTS, IS THE GREATER. DESIGN STANDARDS: FDU FIBER DISTRIBUTION UNIT
WALL-MOUNTED TELEPHONE OUTLET -
W PLUS BOTH 50 PERCENT EXPECTED EXPANSION AND SPACE FOR 15. ELECTRICAL CABLES SHALL NOT RUN PARALLEL WITH UTP CABLES. 1. NATIONAL CEMETERY ADMINISTRATION DESIGN GUIDE FLPS FACILITY LIGHTNING PROTECTION
MOUNTED 48"(1200mm) AFF UNLESS
ANTICIPATED SYSTEMS REDUNDANCY. ELECTRICAL MOTORS AND TRANSFORMER SHALL NOT BE INSTALLED IN 2. SECURITY SYSTEMS SHOWN HEREIN PROVIDED BASED ON SYSTEM
OTHERWISE NOTED
5. SERVICES PASSING THROUGH AREAS OF REMODELING AND / OR PROXIMITY TO UTP CABLES. THE LIST OF REQUIREMENTS FOUND ON SECTION 12 OF THE FMS FACILITIES MANAGEMENT SERVICE
DATA OUTLET - MOUNTED 18"(450mm)
CONSTRUCTION SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION NCA FACILITIES DESIGN GUIDE MARCH 10 (NCA FDG) IP INTERNET PROTOCOL
AFF UNLESS OTHERWISE NOTED
PERIOD. SECURITY 3. VA HANDBOOK 0730 TRANSMITTAL SHEET AUGUST 11; 2000 IT INFORMATION TECHNOLOGY
B TV OUTLET - COAX CABLE JACK OUTLET. 6. EQUIPMENT AND SYSTEMS INSTALLED SHALL BE FULLY COMPATIBLE AND 1. CONTRACTOR SHALL DIRECT ATTACH ALL HORIZONTAL CABLING AND LAN LOCAL AREA NETWORK B
TV MOUNTED AT CLOSE PROXIMITY TO TV. FUNCTIONAL WITH EXISTING FACILITY COMPONENTS AND SYSTEMS TO TERMINATE WITH A FIELD INSTALLABLE PLUG AND THEN CONNECT WAN WIDE AREA NETWORK
WHICH IT INTERFACES. DIRECTLY TO IP CAMERAS, OR OTHER SECURITY EQUIPMENT AVOIDING A SPECIAL SYSTEM SCOPE MCR MAIN COMPUTER ROOM
VIDEO OUTLET - SEE DRAWINGS FOR TYPE - 7. CONDUITS INSIDE BUILDING SHALL NOT EXCEED 100FT BETWEEN POINT OF FAILURE. MCOR MAIN COMPUTER OPERATORS ROOM
MOUNTED 18"(450mm) AFF UNLESS OTHERWISE PULLBOXES. CABLES CONNECTING WORKSTATIONS SHALL NOT BE LONGER MATV MASTER ANTENNA TELEVISION
0
2. MOST PATCH CORDS ARE NOT CONSTRUCTED WITH PLENUM-RATED CABLE VOICE SERVICE SHALL BE VOIP, HOWEVER THERE SHALL
NOTED THAN 295 FEET (90 M) MID MOTION INTRUSION DETECTOR
THEREFORE SHALL NOT BE INSTALLED IN A PLENUM SPACE.
6"
PUBLIC ADDRESS SPEAKER - CEILING ALWAYS BE A QUANTITY OF POTS COPPER PAIRS TO BE OIT OFFICE OF INFORMATION &
8. CONDUIT ENCLOSING OPTICAL FIBER CABLING SHALL HAVE A MINIMUM 3. CONTRACTOR TO PROVIDE DATA CIRCUIT PROTECTION MODULES THAT DISTRIBUTED FROM MCR TO EACH OF THE TRS. OIT TO
S MOUNTED CONDUIT BEND RADIUS OF 10 TIMES THE INTERNAL DIAMETER OF CONDUIT TECHNOLOGY
PROVIDE PROTECTION AGAINST OVERVOLTAGE AND OVERCURRENT DETERMINE. PACS PHYSICAL ACCESS CONTROL SYSTEM
9. THE MINIMUM SIZE CONTROL WIRING SHALL BE NOT LESS THAN NO. 14 AWG CONDITIONS AT ALL CABLES THAT ENTER THE FACILITY FROM THE
PUBLIC ADDRESS SPEAKER - WALL PAS PUBLIC ADDRESS
S 10.PLENUM, CMP, RATED CABLE SHALL BE PROVIDED IN ALL AIR-HANDLING EXTERIOR INCLUDING EQUIPMENT ATTACHED TO THE EXTERIOR WALL OF CELL WITH "YES" MARKING INDICATES SYSTEM IS PART OF PBX PRIVATE BRANCH EXCHANGE
MOUNTED
PLENUM LOCATIONS. NON-PLENUM, CM OR CMR, CABLE MAY BE PROVIDED THE BUILDING (E.G., IP SECURITY CAMERAS). APPROVE ONLY DEVICES SCOPE: PDU POWER DISTRIBUTION UNIT
INTERCOM STATION - WALL MOUNTED IN ALL OTHER AREAS RATED FOR POE AT EQUIPMENT USING POE.
4
REQUIRED IN PSDM. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL CONVENTIONAL KEY AND LOCK, SHALL BE PROVIDED TO ALLOW ACCESS TER TELEPHONE EQUIPMENT ROOM
CARD READER, M OUNTED 46" AFF UNLESS POWER DESIGN. FROM THE UNSECURE SIDE. MAGNETIC LOCKS SHALL NOT FAIL SECURE. TGB TELECOMMUNICATIONS GROUND BAR
CR
OTHERWISE NOTED 2. ROOMS CONTAINING IT EQUIPMENT SHALL HAVE STATIC-DISSIPATIVE 6. CARD ACCESS SECURITY SYSTEMS MAY BE USED IF A MECHANICAL KEY FMS COMMUNICATIONS SYSTEMS AND PART TIP TELECOMMUNICATIONS
FLOORING. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGN. RELEASE IS PROVIDED PER VA FIRE PROTECTION DESIGN MANUAL 2015. EQUIPMENT: OF INFRASTRUCTURE PLANT
01 SECURITY SURVEILLANCE TELEVISION CAMERA
M
3. CMLPS SHALL BE DIRECTLY CONNECTED TO THE FACILITY'S EXTERNAL SCOPE: TR TELECOMMUNICATIONS ROOM
M = MOTION DETECTOR
FLPS. FLPS CONTRACTOR SHALL PROVIDE A WRITTEN APPROVAL FOR THE CEMETERY SPECIFIC UPS UNINTERRUPTIBLE POWER SUPPLY
4
CABLE TRAY WITH ABILITY TO RELOCATE WIRELESS ACCESS POINTS BASED ON A RESTROOMS), WATER SUPPLY SYSTEMS AND PUMP STATIONS, ARE NCA 1. REPLACE CABLE TRAYS WITH CONDUITS.
PHYSICAL SITE SURVEY AFTER OCCUPATION OF THE FACILITY. FACILITY TYPES THAT REQUIRE DESIGN BASED ON PSDG '15 CHAPTER 10, MICROWAVE, SATELLITE RATIO/TELEPHONE & INDIVIDUAL CONDUITS SHALL BE
NO
GB GLASS BREAK DETECTOR APPX A: SECURITY DOOR TYPES, AND APPX B: SECURITY SYSTEM RADIO ENTERTAINMENT INSTALLED FROM THE TR TO EACH OUTLET.
7. CONTRACTOR SHALL PROVIDE FLUSH-MOUNTED SINGLE- GANG OUTLET
BOXES WITH TWO-PORT BASE PLATES AND APPLICABLE WALL DEVICE APPLICATION MATRIX PUBLIC ADDRESS: NOTE: THE USE OF CABLE HANGERS,
MOTION DETECTOR; W-WALL. C-CEILING MOUNT. 3. SECURITY CONTROL CENTER (SCC) IS NOT REQUIRED IN THIS LIFE SAFETY *OVERHEAD PAGING, J-HOOKS, O-RINGS, U-CLAMPS ARE NOT
FACEPLATES AT DRYWALL LOCATIONS (CABLE TO BE INSTALLED BEHIND NO
TYPE IR-INFRARED PROTECTED FACILITY, A CENTRALIZED MONITORING FUNCTION SHALL BE *MASS NOTIFICATION, ALLOWED FOR SPECIAL SYSTEMS LISTED
DRYWALL) AND PROVIDE SURFACE-MOUNTED SINGLE-GANG OUTLET BOXES NO
WITH TWO-PORT BASE PLATES AND APPLICABLE WALL DEVICE FACEPLATES PROVIDED IN ORDER TO ACCOMMODATE SECURITY SYSTEM MONITORING *INTERCOMMUNICATIONS [INTERCOM]) NO FOR CRITICAL, LIFE AND PUBLIC SAFETY
SECURITY ACCESS, SWITCH, BALANCED MAGNETIC
8
AT SOLID WALL LOCATIONS (CABLE TO BE INSTALLED IN PLASTIC WALL REQUIREMENTS PER PSDG '15 - LIFE-SAFETY PROTECTED FACILITIES. PHYSICAL SECURITY MANAGEMENT: AND EMERGENCY OPERATIONS. ENCLOSED
CONTROL.
MOLD EQUIPPED WITH PROTECTIVE INSULATOR OR SLEEVE) 4. ALL CAMERAS/MONITORS TO BE INTEGRATED WITH MILESTONE VIDEO *ACCESS CONTROL YES WIREWAYS (COVERED CABLE DUCT WITH
SECURITY ACCESS, HORN OR SIREN
E SECURITY ACCESS, ANNUNCIATOR PANEL
8. DATA ROOM/CLOSET SHALL HAVE A DRY POWDER EXTINGUISHER, MANAGEMENT OR SIMILAR. COORDINATE WITH VA. *MOTION INTRUSION DETECTION YES CLOSED COVERS) ARE NOT ACCEPTABLE E
SUITABLE FOR ELECTRICAL FIRES, PROVIDED AND INSTALLED WITHIN THE 5. ALL HORIZONTAL WIRING SHALL BE CONCEALED ABOVE THE SUSPENDED *DURESS AND/OR PANIC ALARM NO FOR ABOVE-CEILING APPLICATIONS.
2C 2C 2 CONDUCTORS ROOM GYPSUM GRID CEILING AND SHOULD BE MOUNTED ON J-HOOKS OR *SECURITY SURVEILLANCE TELEVISION [SSTV]) YES
4
4C 4C
4 CONDUCTORS EXISTING CABLE TRAY 2. REPLACE POE/IP CCTV CAMERAS FOR
9. TELECOMMUNICATIONS ROOMS SHALL BE LOCATED ABOVE THE BASE PATIENT, STAFF AND ASSET MONITORING
6C 6C
6 CONDUCTORS ANALOG CAMERAS
FLOOD ELEVATION; SHALL NOT BE LOCATED IN PATIENT CARE AREAS; AND (MEDICAL TELEMETRY, PATIENT/STAFF NO
FO FO
FIBER OPTIC CABLING SHALL NOT BE LOCATED BENEATH TOILETS, SHOWERS, KITCHENS, SINKS, LOCATION, AND CARDIAC)
CU CU
COPPER CABLING OPEN COURTYARDS, PLANTERS, ROOF DRAIN LEADERS, OR OTHER AREAS
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
SPECIAL SYSTEMS GENERAL NOTES,
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U SYMBOLS AND ABBREVIATIONS Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN001
03/09/2017 FAX: MARCH 2017 DKS DKS
Revisions: Date Dwg. 632 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
CU
FO
FROM MAIN
CU
FO
1. GO TO SHEET TN601 FOR DETAILS
TELECOMMUNICATION
2. GO TO SHEET TS101 FOR SITE LAYOUT INFORMATION
CU
FO
SERVICE
3. REFER TO SPECIFICATION SECTION 27 05 26 FOR GROUNDING DETAILS
CU
FO
A 4. PATHWAY(S) SHOWN IS A DIAGRAMMATIC REPRESENTATION OF THE A
SYSTEM. ALTERNATIVE ROUTES ARE ACCEPTABLE AS LONG AS
CU
FO
WIRING RUN DOES NOT TO EXCEED 100 METERS. CONDUIT
CU
FO
INSTALLATIONS UNDER FUME AND VENT HOODS ARE PROHIBITED.
0
CU
FO
6"
CU
FO
CU
FO
CU
FO
2
CU
FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO CU
CU
FO
HAC FAMILY
FO
CU
CU
CU
CU CU
CU
FO
FO
102 103 104.3.A.09 2 FO
FO
FO
FO
CU
CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU
104.3.A.10
CU
FO
CU
VEST
FO
CU
B B
CU
104.4.A.11
CU
FO
101A ELEC
CU
104.4.A.12
FO
CU
FO
2 107
CU
FO
105.3.A.21
FO
CU
104.2.A.07
FO
105.3.A.22
CU
CU
FO
FO
0
104.2.A.08
CU
2 104.5.A.13
FO
FO
DIR STOR
CU
CU
FO
107.1.A.27
6"
CU
105 106
FO
107.1.A.28
FO
105.4.A.24 105.2.A.20
CU
W
CU
FO
101.2.A.04 MECH
101 OPEN OFFICE
104.6.A.15 106.1.A.25 DATA
FO
CU
104.6.A.16104 104.1.A.05 105.1.A.17 106.1.A.26 109 1
104.1.A.06 108
FO
105.1.A.18 TN401
CU
101.1.A.01 MONITOR 2
+72"
FO
101.1.A.02
CU
CORR
4
MONITOR 3
KEY NOTES:
FO
CU
+72" 111
FO
118.1.B.01
CU
HAC VEST 1. PROVIDE ONE RJ45/CAT 6 NETWORK JACK FOR KIOSK. LOCATE
C 118.1.B.02 C
FO
118.4.B.07 TOILET
CU
112 110 NETWORK JACK WITHIN 4 FEET OF THE BACK OF THE KIOSK.
118.4.B.08 118.5.B.09 118.2.B.03 117.4.A.41 TOILET
FO
115
CU
118.5.B.10 118.2.B.04 117.4.A.42 2. PROVIDE ONE CATEGORY 6 TELEPHONE CABLE - 19 GAUGE/STANDARD
114
FO
COLOR CODE/ 2 PAIR, LABELED "T" BETWEEN TELECOMMUNICATION
CU
WOMEN MEN MULTI / MEETING
OPS 113.1.A.29
LUNCH ROOM AND EACH WORKSTATION. (BASED ON NCA FACILITIES DESIGN
FO
121 120 ROOM
CU
GS LOC 117.1.A.35
114.1.A.33 113.1.A.30113
0
101B.1.A.43 119.2.A.45
118 117 GUIDE MARCH 2010)
117.1.A.36
FO
119 119.2.A.46 117.3.A.39 117.2.A.37 114.1.A.34 113.2.A.31
CU
-
117.3.A.40 117.2.A.38 113.2.A.32 3. PROVIDE JUNCTION BOX WITH BLANK COVER PLATE MOUNTED FLUSHED
FO
CU
118.3.B.05 IN WALL 6" BELOW CEILING FOR CABLING CONNECTION TO MONITOR.
FO
118.3.B.06 COORDINATE WITH VA PRIOR TO INSTALL THE LOCATION FOR THE
CU
OP STOR SURVEILLANCE MONITOR.
FO
CU
4
116
FO
CU
GRAVESITE
LOCATOR
FO
CU
KIOSK 1
D D
FO
CU
FO
CU
FO
CU
VEST
FO
CU
101B
FO
0
CU
FO
CU
FO
CU
FO
CU
FO
CU
CU
8
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
E E
CU
FO
1 TELECOMMUNICATION PLAN
TN101 SCALE: 1/8" = 1'-0"
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U TELECOMMUNICATION PLAN Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN101
03/09/2017 FAX: MARCH 2017 DKS DKS
Revisions: Date Dwg. 633 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
0
6"
2
HAC FAMILY
102 103
2
VEST
B M B
101A ELEC
ELECTRONIC 107
DRIVE UNIT (TYP)
2
0
DIR STOR
6"
CORR
4
M
OP STOR
4
116
D D
VEST
101B
0
8
E E
ADMINISTRATION / PUBLIC INFORMATION
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U MOTORIZED SHADES PLAN Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN101.1
03/09/2017 FAX: MARCH 2017 DKS DKS
Revisions: Date Dwg. 634 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
GENERAL NOTES:
1. GO TO SHEET TN601 FOR DETAILS
2. GO TO SHEET TS101 FOR SITE LAYOUT INFORMATION
A 3. REFER TO SPECIFICATION SECTION 27 05 26 FOR GROUNDING A
DETAILS
4. PATHWAY(S) SHOWN IS A DIAGRAMMATIC REPRESENTATION OF
THE SYSTEM. ALTERNATIVE ROUTES ARE ACCEPTABLE AS
0
PROHIBITED.
2
TN401
2
CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU
CU
PART AND TOOL
FO FO FO FO FO FO FO FO FO
116
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO STORAGE
FO FO FO FO
MEN WOMEN
CU
B B
FO
113
109 107
FO
CU
113.1.C.35
FO
CU
113.1.C.36 103.4.C.07
FO
113.1.C.37 VESTIBULE 103.4.C.08
CU
0
103.3.C.05
114.2.C.41 113.1.C.38 101
FO
103.3.C.06
6"
CU
114.2.C.42 103.5.C.09
113.1.C.33
FO
CU
103.5.C.10
HR / LINK STATION/
113.1.C.34 103.2.C.03 COTR OFFICE
103.2.C.04 103
VEHICLE AND IT CLOSET 111.1.C.29
EQUIPMENT STORAGE 111.1.C.30
113.1.C.31 111 103.1.C.01
114
4
113.1.C.32 103.1.C.02
UP
CORRIDOR 2 HAC
104
C 102
105.1.C.11
C
114.1.C.39 R 108.1.C.21
105.4.C.17
105.1.C.12 KEY NOTES:
114.1.C.40 ELEC 108.1.C.22 108.4.C.27 105.4.C.18
108.4.C.28 1. NOT USED
110 FOREMAN
105.2.C.13
0
E E
MAINTENANCE BUILDING
4
1 TELECOMMUNICATION PLAN
TN102 SCALE: 1/8" = 1'-0"
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
MAINTENANCE BUILDING
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U TELECOMMUNICATION PLAN Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN102
03/09/2017 FAX: MARCH 2017 DKS DKS
Revisions: Date Dwg. 635 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
CU
FO
CU
FO
CU
GENERAL NOTES:
FO
CU
FO
CU
2
FO
CU
FO
1 CU
FO
CU
FO
TN402 CU FO
FO
FO
1. GO TO SHEET TN601 FOR DETAILS
FO
?
103.3.D.09
CU
CU-4 RUN DOES NOT TO EXCEED 100 METERS. CONDUIT INSTALLATIONS
FO
FO
CU
103.3.D.10 105 STOR
WH UNDER FUME AND VENT HOODS ARE PROHIBITED.
CU
103.2.D.07 105
FO
FO
CU
LOUNGE 106
0
103.2.D.08 CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
FO
103
CU
6"
106.1.D.13
FO
CU
HALL
106 106.1.D.14
103.1.D.05 104
FO
CU
103.1.D.06
2
FO
CU
2
102
LOCKERS 2
FO
CU
102.1.D.03
102
102.1.D.04 107 B107.1.D.15
FO
CU
109 108
107.1.D.16
101B
FO
CU
MEN WOMEN
FO
CU
B 101.1.D.01
101A 109 108 B
FO
CU
101.1.D.02
FO
CU
3
FO
DS
CU
0
FO
CU
6"
VEST/MUD ROOM
FO
CU
101
FO
CU
FO
CU
FO
CU
4
FO
CU
FO
CU
C C
KEY NOTES:
FO
CU
FO
CU
FO
CU
FO
CU
0
FO
CU
FO
CU
FO
CU
FO
CU
4
FO
CU
FO
CU
D D
FO
CU
FO
CU
FO
CU
FO
CU
0
FO
CU
FO
CU
HONOR GUARD BUILDING
1 TELECOMMUNICATION PLAN
8
E E
4
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
HONOR GUARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U TELECOMMUNICATIONS PLAN Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN103
03/09/2017 FAX: MARCH 2017 TGCT DKS
Revisions: Date Dwg. 636 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
101A
2
3
6"W x 10'L x 2"D
B SLOPE B
3 1 1 106
9' - 0"
9' - 0"
103
3
0
107 109
1 9' - 4"
6"
101 EXP
9' - 4"
SLOPE 9' - 4" EXP EXP
3 3 108
9' - 0"
105
104
4 DROPS 8 DROPS 4
12 DROPS EXP
101 1D 58 CABLES
4
54 CABLES
3 3 4 111
4
9' - 4"
3 9' - 4"
KEY NOTES:
8' - 4"
3 8' - 0"
3 3 1. INSTALL JUNCTION BOX ABOVE CEILING FOR DROPS TO PRINTERS.
C 3 14 DROPS 15 9' - 0"
112 C
8' - 4" 9' -DROPS
6" 4 DROPS 9' - 0" 2. PROVIDE INCOMING TELEPHONE CABLING AS REQUIRED TO ACCOMMODATE
9' - 0"
121 120 8' - 0"
8' - 0" ONE LINE PER WORKSTATION, FAX LINES, AND SPARES FROM LOCAL
9' - 0" 9' - 0"
115 114
118 TELEPHONE COMPANY POINT OF CONNECTION TO THE MAIN TELEPHONE
3 CLOSET OF THE ADMINISTRATION/MAINTENANCE COMPLEX. REFER TO
3 3 117 3 3
9' - 0" 9' - 6" 113 ARTICLE 2.12 FOR INCOMING CONDUIT REQUIREMENTS. (BASED ON NCA
0
8' - 0"
FACILITIES DESIGN GUIDE MARCH 10)
SLOPE 9' - 4"
8' - 0"
3. CABLE TRAY SECTION SHALL BE MINIMUM 2" DEEP BY 4" WIDE. COORDINATE
3 3 CABLE TRAY WITH MECHANICAL EQUIPMENT AT TIME OF INSTALLATION. TRAY
3 SHALL NOT BLOCK ACCESS TO DUCT TAP BALANCING DAMPERS.
4
4. CABLE TRAY SECTION SHALL BE MINIMUM 4" DEEP BY 4" WIDE. COORDINATE
CABLE TRAY WITH MECHANICAL EQUIPMENT AT TIME OF INSTALLATION. TRAY
SHALL NOT BLOCK ACCESS TO DUCT TAP BALANCING DAMPERS.
D 101B D
0
8
E E
ADMINISTRATION / PUBLIC INFORMATION
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U TELECOMMUNICATION RCP PLAN Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN111
03/09/2017 FAX: MARCH 2017 DKS DKS
Revisions: Date Dwg. 637 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
GENERAL NOTES:
1. GO TO SHEET TN601 FOR DETAILS
2. GO TO SHEET TS101 FOR SITE LAYOUT INFORMATION
3. REFER TO SPECIFICATION SECTION 27 05 26 FOR GROUNDING DETAILS
A 4. PATHWAY(S) SHOWN IS A DIAGRAMMATIC REPRESENTATION OF THE A
SYSTEM. ALTERNATIVE ROUTES ARE ACCEPTABLE AS LONG AS WIRING RUN
DOES NOT TO EXCEED 100 METERS. CONDUIT INSTALLATIONS UNDER FUME
AND VENT HOODS ARE PROHIBITED.
0
6"
A B C
2
CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU
CU
PART AND TOOL
FO FO FO FO FO FO FO FO FO
116
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO STORAGE
FO FO FO FO
MEN WOMEN
CU
B 113 B
109 107
FO
CU
FO
CU
FD
FO
VESTIBULE
CU
0
XFMR
101
FO
6"
FD
CU
1 B B
B
FO
CU
HR / LINK STATION/
8 DROPS 34D COTR OFFICE
B
103
VEHICLE AND IT CLOSET
EQUIPMENT STORAGE 1 111
114
4
2 15 DROPS
FD
FLOOR DRAIN
CORRIDOR 1 HAC
4 DROPS 15 DROPS FD
UP
104
C 102
10D
1 C
1 2 2 2 2
R
R ICE
1
30 DROPS KEY NOTES:
ELEC FD
110 1. CABLE TRAY SECTION SHALL BE MINIMUM 2" DEEP BY 4" WIDE.
FOREMAN
COORDINATE CABLE TRAY WITH MECHANICAL EQUIPMENT AT TIME OF
0
WH 105 INSTALLATION. TRAY SHALL NOT BLOCK ACCESS TO DUCT TAP BALANCING
LUNCHROOM / LOUNGE
MECH V DAMPERS.
FD
GEN 108
112 2. CABLE TRAY SECTION SHALL BE MINIMUM 4" DEEP BY 4"
V FD
AHU-3 WIDE.COORDINATE CABLE TRAY WITH MECHANICAL EQUIPMENT AT TIME
B
4
E E
MAINTENANCE BUILDING
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
MAINTENANCE BUILDING
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U TELECOMMUNICATION RCP PLAN Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN112
03/09/2017 FAX: MARCH 2017 DKS DKS
Revisions: Date Dwg. 638 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
105
1. GO TO SHEET TN601 FOR DETAILS
2. GO TO SHEET TS101 FOR SITE LAYOUT INFORMATION
3. REFER TO SPECIFICATION SECTION 27 05 26 FOR GROUNDING DETAILS
4. PATHWAY(S) SHOWN IS A DIAGRAMMATIC REPRESENTATION OF THE
A R
AHU-4 SYSTEM. ALTERNATIVE ROUTES ARE ACCEPTABLE AS LONG AS WIRING RUN A
?
CU-4HALL DOES NOT TO EXCEED 100 METERS. CONDUIT INSTALLATIONS UNDER FUME
WH 104 AND VENT HOODS ARE PROHIBITED.
9' - 0" 105
1
0
LOUNGE
6 DROPS
103
1 1 1 STOR
6"
102 LOCKERS
2
9' - 0"
GUN SAFE B 107
102 101B 109 108
DS
0
6"
C C
KEY NOTES:
1. CABLE TRAY SECTION SHALL BE MINIMUM 2" DEEP BY 4" WIDE.
COORDINATE CABLE TRAY WITH MECHANICAL EQUIPMENT AT
TIME OF INSTALLATION. TRAY SHALL NOT BLOCK ACCESS TO
0
D D
0
E E
4
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
HONOR GUARD
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U TELECOMMUNICATIONS RCP PLAN Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN113
03/09/2017 FAX: MARCH 2017 TGCT DKS
Revisions: Date Dwg. 639 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
2
FO
CU
FO
CU
FO
CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
A A
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
FROM MAIN FROM
CU
TELECOMMUNICATION ADMINISTRATION
FO
CU
0
FO
CU
FO
CU
SERVICE BUILDING
ELEC
FO
CU
FO
CU
FO
6"
CU
FO
CU
FO
CU
FO
CU
TO MAINTENANCE
FO
CU
FO
CU
FO
BUILDING VIA
CU
FO
CU
MANHOLES (SEE
FO
CU
2
FO
107
CU
SITE PLAN TS101)
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
B B
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
0
FO
CU
FO
CU
6"
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
FO
CU
6
4
FO
CU
FO
CU
FO
CU
ELECTRONIC ACCESS
FO
CU
FO
CU
FO
FO
PIV COMPLIANT
CU
FO
CU
C
MECH C
FO
CU
11.0"
FO
SPARE
CU
FO
CU
6.3"
FO
0'-2"
CU
0'-2"
FO
CU
DATA
3.3" 4" CONDUITS
MAIN TELECOMMUNICATION DOUBLE (FRONT/REAR) 1'-7.0"
GROUND BAR
109
0
VERTICAL WIRE
3-0'"
PAINTED 3/4" FIRE RETARDANT MANAGERS PAINTED 3/4" FIRE RETARDANT CLR
6.3"
PLYWOOD OVER GWB PLYWOOD OVER GWB
108
FRONT
REAR
SPACE
1'-7.0"
FOR PACS OPEN(NON-ENCLOSED) STANDARDIZED
4
SCALE: 1/2"
1/8" = 1'-0"
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
TELECOM ROOMS AREA PLAN
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U ENLARGEMENT Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN401
03/09/2017 FAX: MARCH 2017 TGCT DKS
Revisions: Date Dwg. 640 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
4' -
AHU-4
MECH CU CU
0
FO
CU
6"
FO
CU
CU-4
FO
105
CU
FO
CU
ELECTRONIC ACCESS WH
2
FO
CU
PIV COMPLIANT
FO
105
CU
FO
CU
FO
CU
B 3-'0"
TELECOMMUNICATION B
GROUND BAR
FO
CU
CLR
0'-2"
FO
CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU CU
FO FO FO
4" CONDUITS
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
0
REAR SPARE
6"
FROM
ADMINISTRATION
3-'0" BUILDING
2 HALL
4
OPEN(NON-ENCLOSED) STANDARDIZED
2' - 2"
FRONT
HALF SIZE (19X42IN) FRAME RACK
C 106 2-'11"
CLR
104 C
0
2
4
109 108
8
E E
4
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
TELECOM ROOMS AREA PLAN
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U ENLARGEMENT Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN402
03/09/2017 FAX: MARCH 2017 TGCT DKS
Revisions: Date Dwg. 641 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
113 LUNCH 1 A 30 113.1.A.30 PATCH PANEL: "B" IN ADMIN BUILDING X SPARE X B 30 1XX.X.B.30
PATCH PANEL: "A" IN ADMIN BUILDING
DATA RJ45 113 LUNCH 2 A 31 113.2.A.31 DATA RJ45 X SPARE X B 31 1XX.X.B.31
ROOM ROOM RJ45 PANEL DATA OUTLET ROOM ROOM RJ45 PANEL DATA OUTLET
OUTLET PANEL OUTLET PANEL
NUMBER NAME PORT LABEL NAME NUMBER NAME PORT LABEL NAME
A NUMBER NAME NUMBER NAME A
113 LUNCH 2 A 32 113.2.A.32 MULTI X SPARE X B 32 1XX.X.B.32
101 LOBBY 1 A 01 101.1.A.01 118 1 B 01 118.1.B.01
MEETING
X SPARE X B 33 1XX.X.B.33
0
OPEN MULTI
118 5 B 09 118.5.B.09
6"
X SPARE X B 19 1XX.X.B.18
D 105 DIR 2 A 19 105.2.A.19 D
105 DIR 2 A 20 105.2.A.20 X SPARE X B 20 1XX.X.B.18
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U TELECOM PANEL SCHEDULE Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN501
03/09/2017 FAX: MARCH 2017 TGCT DKS
Revisions: Date Dwg. 642 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
LOUNGE X X X D 02 118.1.D.02
HR/LINK
6"
OFFICE
HR/LINK PART AND X X X D 35 1XX.X.D.35
113 1 C 31 111.1.C.31 X X X D 05 118.3.D.05
103 STATION/COTR 2 C 04 103.2.C.04 TOOL STORAGE
OFFICE
PART AND X X X D 36 1XX.X.D.36
HR/LINK 113 1 C 32 111.1.C.32 X X X D 06 118.3.D.06
TOOL STORAGE
103 STATION/COTR 3 C 05 103.3.C.05
B OFFICE PART AND X X X D 07 118.4.D.07 X X X D 37 1XX.X.D.37 B
113 2 C 33 111.2.C.33
HR/LINK TOOL STORAGE
103 STATION/COTR 3 C 06 103.3.C.06 PART AND X X X D 08 118.4.D.08 X X X D 38 1XX.X.D.38
OFFICE 113 2 C 34 111.2.C.34
TOOL STORAGE
0
HR/LINK X X X D 09 118.5.D.09
103 STATION/COTR 4 C 07 103.4.C.07 PART AND X X X D 39 1XX.X.D.39
6"
113 3 C 35 113.1.C.35
OFFICE TOOL STORAGE
HR/LINK X X X D 10 118.5.D.10
PART AND X X X D 40 1XX.X.D.40
103 STATION/COTR 4 C 08 103.4.C.08 113 3 C 36 113.1.C.36
TOOL STORAGE
OFFICE X X X D 11 1XX.X.D.11
HR/LINK PART AND X X X D 41 1XX.X.D.41
113 4 C 37 113.2.C.37
TOOL STORAGE
4
X SPARE X C 43 1XX.X.C.43
105 FOREMAN 3 C 15 105.3.C.15 X X X D 18 1XX.X.D.18
X X X D 48 1XX.X.D.48
X SPARE X C 44 1XX.X.C.44
105 FOREMAN 3 C 16 105.3.C.16 X X X D 19 1XX.X.D.19
D D
X SPARE X C 45 1XX.X.C.45
105 FOREMAN 4 C 17 105.4.C.17 X X X D 20 1XX.X.D.20
X SPARE X C 46 1XX.X.C.46
X X X D 21 1XX.X.D.21
105 FOREMAN 4 C 18 105.4.C.18
0
X X X D 28 1XX.X.D.28
0
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
MAINTENANCE BUILDING
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U TELECOM PANEL SCHEDULE Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN502
03/09/2017 FAX: MARCH 2017 TGCT DKS
Revisions: Date Dwg. 643 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
ROOM
X SPARE X E 34 1XX.1.E..34
2
X SPARE X E 35 1XX.1.E.35
103 LOUNGE 1 E 05 103.3.E.05
X SPARE X E 36 1XX.1.E..36
103 LOUNGE 1 E 06 103.4.E.06
B B
103 LOUNGE 2 E 07 103.2.E.07 X SPARE X E 37 1XX.1.E.37
X SPARE X E 41 1XX.4.E.41
X SPARE X E 47 1XX.X.E.47
X SPARE X E 18 1XX.1.E.18
X SPARE X E 48 1XX.X.E.48
D X SPARE X E 19 1XX.1.E.19
D
X SPARE X E 20 1XX.1.E.20
X SPARE X E 21 1XX.1.E.21
0
X SPARE X E 22 1XX.1.E.22
X SPARE X E 23 1XX.1.E.23
8
X SPARE X E 24 1XX.1.E.24
E X SPARE X E 25 1XX.1.E.25 E
4
X SPARE X E 26 1XX.1.E.26
X SPARE X E 27 1XX.1.E..27
0
X SPARE X E 28 1XX.1.E.28
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
HONOR GUARD TELECOM PANEL SCHEDULE
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN503
03/09/2017 FAX: MARCH 2017 TGCT DKS
Revisions: Date Dwg. 644 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
A A
1 ALL RACK- MOUNTED 1
ALL RACK- MOUNTED
2 1. FDU 2RU 2 1. FDU 2RU
0
FAN 3 2 4 6 8 10 12 14 16 18 20 22 24
2 4 6 8 10 12 14 16 18 20 22 24
25
24 + 2G Managed PoE Switch
26
FAN 3 2 4 6 8 10 12 14 16 18 20 22 24
2 4 6 8 10 12 14 16 18 20 22 24
25
24 + 2G Managed PoE Switch
26
4 8. UPS. 3000VA 4
2
6
SYST
RPS
STAT
PORT 1 PORT 3 PORT 5 PORT 7 PORT 9 PORT 11 PORT 13 PORT 15 PORT 17 PORT 19 PORT 21
NETWORK BACKBONE
PORT 23 PORT 25 PORT 27 PORT 29 PORT 31 PORT 33 PORT 35 PORT 37 PORT 39 PORT 41 PORT 43 PORT 45 PORT 47
Catalyst 2960 series
6
SYST
RPS
STAT
PORT 1 PORT 3 PORT 5 PORT 7 PORT 9 PORT 11 PORT 13 PORT 15 PORT 17 PORT 19 PORT 21
NETWORK BACKBONE
PORT 23 PORT 25 PORT 27 PORT 29 PORT 31 PORT 33 PORT 35 PORT 37 PORT 39 PORT 41 PORT 43 PORT 45 PORT 47
Catalyst 2960 series
8. UPS. 3000VA
9. HEAVY-DUTY POWER STRIP (MINIMUM 5
UTIL UTIL
DUPLEX DUPLEX
SPEED SPEED
PORT 2 PORT 4 PORT 6 PORT 8 PORT 10 PORT 12 PORT 14 PORT 16 PORT 18 PORT 20 PORT 22 PORT 24 PORT 26 PORT 28 PORT 30 PORT 32 PORT 34 PORT 36 PORT 38 PORT 40 PORT 42 PORT 44 PORT 46 PORT 48 PORT 2 PORT 4 PORT 6 PORT 8 PORT 10 PORT 12 PORT 14 PORT 16 PORT 18 PORT 20 PORT 22 PORT 24 PORT 26 PORT 28 PORT 30 PORT 32 PORT 34 PORT 36 PORT 38 PORT 40 PORT 42 PORT 44 PORT 46 PORT 48
MODE MODE
8. UPS. 1500VA
7
GE-DS-242-PoE 2 4 6 8 10 12 14 16 18 20 22 24 24 + 2G Managed PoE Switch
ifs FAN 3 2 4 6 8 10 12 14 16 18 20 22 24 25 26
3. PROVIDE HORIZONTAL WIRE MANAGEMENT ON EACH 3. PROVIDE HORIZONTAL WIRE MANAGEMENT ON EACH
Console
FAN 2 Mini GBIC Mini GBIC
FAN 1 1 3 5 7 9 11 13 15 17 19 21 23 1000
4
SIDE OF FREESTANDING RACK SIDE OF FREESTANDING RACK 6
SYST
RPS
STAT
UTIL
DUPLEX
SPEED
PORT 1
PORT 2
PORT 3
PORT 4
PORT 5
PORT 6
PORT 7
PORT 8
PORT 9
PORT 10
PORT 11
PORT 12
PORT 13
PORT 14
PORT 15
PORT 16
PORT 17
PORT 18
PORT 19
PORT 20
PORT 21
PORT 22
NETWORK BACKBONE
PORT 23
PORT 24
PORT 25
PORT 26
PORT 27
PORT 28
PORT 29
PORT 30
PORT 31
PORT 32
PORT 33
PORT 34
PORT 35
PORT 36
PORT 37
PORT 38
PORT 39
PORT 40
PORT 41
PORT 42
PORT 43
PORT 44
PORT 45
PORT 46
PORT 47
PORT 48
Catalyst 2960 series
UPS 1 4. SUPPLY 100BASET, CATEGORY 6 CERTIFIED UPS 1 4. SUPPLY 100BASET, CATEGORY 6 CERTIFIED 9 UPS
8
RACK-MOUNTED MODULAR RJ45 PUNCH DOWN RACK-MOUNTED MODULAR RJ45 PUNCH DOWN
BLOCK/PANEL (24/48 PORTS) FOR JACKS MEETING BLOCK/PANEL (24/48 PORTS) FOR JACKS MEETING
THE ANSI/EIA/TIA 568- B CATEGORY 5E/6 STANDARDS. THE ANSI/EIA/TIA 568- B CATEGORY 5E/6 STANDARDS.
4
1 ADMINISTRATION TELECOM RACK 2 MAINTENANCE TELECOM RACK 3 HONOR GUARD TELECOM RACK
C TN601 SCALE: NTS TN601 SCALE: NTS TN601 SCALE: NTS C
0
4
D D
0
ifs
Console
FAN 2 Mini GBIC Mini GBIC
FAN 1 1 3 5 7 9 11 13 15 17 19 21 23 1000
4
8
6
SYST
RPS
STAT
UTIL
DUPLEX
SPEED
MODE
PORT 1
PORT 2
PORT 3
PORT 4
PORT 5
PORT 6
PORT 7
PORT 8
PORT 9
PORT 10
PORT 11
PORT 12
PORT 13
PORT 14
PORT 15
PORT 16
PORT 17
PORT 18
PORT 19
PORT 20
PORT 21
PORT 22
NETWORK BACKBONE
PORT 23
PORT 24
PORT 25
PORT 26
PORT 27
PORT 28
PORT 29
PORT 30
PORT 31
PORT 32
PORT 33
PORT 34
PORT 35
PORT 36
PORT 37
PORT 38
PORT 39
PORT 40
PORT 41
PORT 42
PORT 43
PORT 44
PORT 45
PORT 46
PORT 47
PORT 48
Catalyst 2960 series
5. NOT USED
6. ETHERNET SWITCH (VV) 3.47 ifs
GE-DS-242-PoE
FAN 3 2 4 6 8 10 12 14 16 18 20 22 24
2 4 6 8 10 12 14 16 18 20 22 24
25
24 + 2G Managed PoE Switch
26
E E
Console
FAN 2
[88.1] 57600,N,8,1
FAN 1 1 3 5 7 9 11 13 15 17 19 21 23
PWR
LINK ACT PoE In Use
RESET
1 3 5 7 9 11 13 15 17 19 21 23
1000
10/100
19.74
[501.4]
24 PORT FAST ETHERNET SWITCH
4
4 PUMPHOUSE TELECOM ENCLOSURE 5 TYPICAL CAT 6 PATCH PANEL 6 WITH RACK EARS
TN601 SCALE: NTS TN601 SCALE: NTS TN601 SCALE: NTS
0
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
TELECOM DETAILS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN601
03/09/2017 FAX: MARCH 2017 TGCT DKS
Revisions: Date Dwg. 645 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
DATA ROOM #
D304.1.A.01
PATCH PANEL NAME(LETTER) CATEGORY 6 RJ-45 JACKS
PATCH PANEL PORT# FOR VOIP (WHITE)
(A.01)
DATA JACK (YELLOW, CAT. CATEGORY 6, RJ-45 JACK
6 FOR DATA (YELLOW)
B B
D304.1.A JACK IDENTIFIER/LABEL:
(A.02) JACK ROOM. JACK#. PATCH
DATA JACK (YELLOW, CAT.
PANEL NAME(LETTER)
6)
NOTE:
0
PATCH PANEL NAME(LETTER) · PROVIDE (1) CAT 6 8-CONDUCTOR CABLES TO EACH RJ-45 JACK. EACH
PATCH PANEL PORT# PATCH LEAD SHALL BE TERMINATED IN RJ45 CONNECTORS (MALE)
· COLORS BASED ON TABLE 3-2 IN TELECOMMUNICATIONS MANUAL FEB 2016
NOTE: PROVIDE (1) CAT 6/CAT5E 8-CONDUCTOR
· 2" X 4" DUAL GANG OUTLET BOX
CABLES TO EACH OUTLET, TERMINATED ON · PROVIDE FLUSH-MOUNTED SINGLE- GANG OUTLET BOXES WITH
CAT-6/CAT5E 8-PIN/8-POSITION RJ-45 TWO-PORT BASE PLATES AND APPLICABLE WALL DEVICE FACEPLATES
AT DRYWALL LOCATIONS (CABLE TO BE INSTALLED BEHIND DRYWALL)
4
TN602 TN602
D D
0
8
E E
4
0
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
TELECOM DETAILS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN602
03/09/2017 FAX: MARCH 2017 TGCT DKS
Revisions: Date Dwg. 646 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
ROOF
2
WALLS TO ROOF TO
BAR JOIST TOP MAINTAIN FIRE RATING
CHORD
BAR
JOIST
WEB
A TYPICAL CHAIN A
HANG LIGHT
FIXTURE
TYPICAL TYPICAL
0
GROUND BUS
METALLIC COLD WATER SERVICE
GROUNDING ENTRANCE
ELECTRODE
CONDUCTOR IN
AC PANEL
4
9.0" LUGS.
1) 6 LUGS WITH 15.8 MM (5/8 INCH) HOLE
BASE CLAMP/ 1/4" THICK CENTERS.
BRACKET CU BAR 2) 3 LUGS WITH 25.4 MM (1 INCH) HOLE
#6 AWG CU
CENTERS.
HEX HEAD BOLT TO RACK
D. WALL-MOUNT STAND-OFF BRACKETS,
LOCK WASHER ASSEMBLY SCREWS AND INSULATORS
8
TRAY SIZE (INCHES) MAX QTY OF FLAT WASHER FOR 100 MM (4 INCHES) STANDOFF FROM
DEPTH WIDTH CAT. 6 CABLES WALL.
INSULATOR
E 1 4 16 STEEL E. LISTED AS GROUNDING AND BONDING E
1 6 25 EXPANSION FLAT WASHER & EQUIPMENT.
1 8 34 ANCHOR LOCK WASHER F. PROVIDE CONTINUOUS GROUND PATH
4
GROUNDING DIAGRAM
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
TELECOM DETAILS
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TN603
03/09/2017 FAX: MARCH 2017 TGCT DKS
Revisions: Date Dwg. 647 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
x x x
x
x
MAIN GATE 1. GO TO SHEET TN601 FOR DETAILS
2. GO TO SHEETS CU139 TO CU143 FOR TELECOM UTILITIES
x
CR
1
x
01
LAYOUT INFORMATION
x
M
x
PTZ
A A
x
x
HONOR GUARD MAINTENANCE
TRAILER
x
BUILDING
x
2
TN401
x
109 107
ADMINISTRATION
x
FD VESTIBULE
XFMR
B B FD 101
0
B
HR / LINK STATION/
COTR OFFICE
B
103
VEHICLE AND
EQUIPMENT STORAGE
114
FD
FLOOR DRAIN
HAC
1" CONDUIT
UP CORRIDOR FD
102 104
R
R ICE
ELEC FD
TRAILER
110 FOREMAN
WH 105
LUNCHROOM / LOUNGE
x
MECH
FD V
GEN 108
112
V FD
AHU-3
B
EP
CU-3
ETHERNET, RS485
VEST/ BOOT WASH/
HOLDING
106
LP
MAINTENANCE
6"
x
HANDHOLE
CHH05 1. PROVIDE A CARD READER FOR AFTER-REGULAR-HOURS ACCESS
x
TO AUTHORIZED PERSONNEL. GATE SHOULD AUTOMATICALLY
x
2
x
2
FOR HANDHOLES
PATH TO ADMIN
x
BLDG.
x
1
B B
x
x
x
x
0
x
6"
x
1
x
ADMINISTRATION
x
BUILDING VEST
101A FD
HAC FAMILY
102 103
FD
BCS
DIR STOR
ELEC
107
AHU-2 AHU-1
x
104 108 TN401
WH
4
CORR
111
FD HAC VEST
TOILET 112 110
115 FD FD TOILET
114 R
WOMEN MEN MULTI / MEETING
ROOM OPS LUNCH
121 120 GS LOC
118 117 113
119
FD FD OP STOR
BCS 116
x
VEST
101B
x
C C
x
x
x
x
0
x
x
x
x
4
x
x
D D
x
x
x
HONOR GUARD
x
1
TN402
?
105
106
102
2
x
0
101A
x
x
x
x
8
x
x
E PUMP STATION E
x
102
x
4
101
±45°
FLOW
x
x
x
0
0' 64'
4' 128'
8' 256'
16'
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
TELECOM SITE PLAN
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TS101
03/09/2017 FAX: MARCH 2017 TGCT DKS
Revisions: Date Dwg. 648 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
1
TY601
2
PIV
HAC FAMILY 6"WX10'LX2"D ALARM PANEL WITH AUXILIARY
102 103 OUTPUT RELAY PROGRAMMED 2 CONDUCTOR 22-GAUGE
SHIELDED WIRE (TYP. ALL DOOR
6C
FOR DOOR STRIKE.
VEST CONTACTS)
B B
6C
13
101A ELEC 8
107
6C
4
5
6C
0
6 CONDUCTORS GB DIR
6C STOR
6"
6C 2C 2C 2C 2C 2C
6C
22-GAUGE SHIELDED WIRE LOBBY / REC 105 10
106 1
(TYP FOR CR'S) 6C
MECH
101 OPEN OFFICE
KEY NOTES:
6C
CR
6C
6 DATA
2 7 2 109 1
104 108
TY601 3
4C
4C
TN401
5
6C
12 1. PROVIDE A MOTION DETECTOR CONTROLLER INSIDE THE ACCESS
6 PIV CR CONTROL PANEL.
CORR
4
4C
4C
6C
6C
9 11
6C
2. INSTALL POWER SUPPLY FOR MOTION DETECTION AND MOUNT IN
6C 6C 6C 6C 6C 6C 6C 6C 6C 6C 6C 6C 111 6C 6C
6C 6C 6C 6C
CONTROL PANEL. AN INTERNAL, AUTOMATIC CHARGING DC STANDBY
PIV
6C 6C 6C 6C 6C 6C 6C 6C 6C 6C
CR 4C 4C 4C 4C 4C
4C
4C
4C
HAC VEST
C TOILET
PER VHA PROGRAM GUIDE PG-18-3 SEPTEMBER 2004. C
112 110 3. AUDIBLE LOCAL ALARM HORN SHALL BE MOUNTED ABOVE CONTROL
4C
4C
115 TOILET PANEL.A LOCAL ALARM LEVEL OF 80 DB (MIN) TO 90 DB (MAX) WITHIN
114 THE CONFIGURATION OF THE PROTECTED AREA PER VA HANDBOOK
4C
4C
WOMEN MEN MULTI / MEETING 0730
5 OPS LUNCH 4 CONDUCTORS
121 120 ROOM 4. INSTALL SHUNT LOCK AT DOORS INDICATED IN DRAWING TO PROVIDE
GS LOC 22-GAUGE STRANDED
0
4C
4C
117 113
13 WIRE(TYP FOR GB'S)
CR
119 4C 4C THE FULL SYSTEM. WIRE THE SHUNT LOCK TO MAGNETIC CONTACT
GB GB TERMINALS.
5. MOUNT CONTACT ON FRAME OF DOOR TO PROVIDE MOTION
DETECTION SYSTEM TO ENTRANCES OF BUILDINGS PER NCA FDG
5 OP STOR 12.1-A.1
PIV
4
E E
ADMINISTRATION / PUBLIC INFORMATION SECURITY VIDEO SURVEILLANCE SCHEDULE
4
03 NVR-1 101 LOBBY 10'-6"AFF CEILING FIXED INTERIOR MINI DOME COAX POE POE DATA 107
04 NVR-1 101B VEST 10'-6"AFF CEILING FIXED INTERIOR MINI DOME COAX POE POE DATA 107 0' 4' 8' 16'
05 NVR-1 111 CORR 10'-6"AFF CEILING FIXED INTERIOR MINI DOME COAX POE POE DATA 107
SCALE: 1/8" = 1'-0"
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
ADMINISTRATION / PUBLIC INFORMATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U SECURITY PLAN Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TY101
03/09/2017 FAX: MARCH 2017 DKS DKS
Revisions: Date Dwg. 649 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
A B C
2
TN401
2
VESTIBULE 2
0
1
101
6"
HR / LINK STATION/
COTR OFFICE
1 103
VEHICLE AND IT CLOSET
EQUIPMENT STORAGE 7
111
114
4
4 5
UP CORRIDOR HAC
5 3/4" CONDUIT
104
C 102 6 C
CR KEY NOTES:
CR
3 R
3 1. PROVIDE ELECTRIC LATCH RETRACTION FOR DOUBLE DOOR
ELEC
ENTRANCE AND DOOR CONTACT.
110 FOREMAN 2. PROVIDE LOW VOLTAGE ENERGY OPERATOR ABA ACCESS.
0
ACCESS.
CR CR 5. PROVIDE MOTION SENSORS TO PERSONNEL ENTRANCES IN
4
4 EP MAINTENANCE YARD PER NCA FDG 12.1-A.3
6. PROVIDE A SINGLE CONTROL PANEL WITH ANNUNCIATOR FROM EACH
3
D 3 VEST/ BOOT WASH/ MOTION DETECTOR PER NCA FDG 12.1-4.B. COORDINATE WITH VA D
HOLDING FOR EXACT LOCATION PRIOR TO INSTALLATION.
106 7. INSTALL CARD ACCESS SYSTEM CONTROL PANEL AND POWER
SUPPLY ON 3/4"BACKBOARD. REFER TO TELECOM DRAWINGS FOR
DATA ROOM CONFIGURATION (TGB, RACK, TBB, UPS, ETC.)
0
8
E E
SECURITY VIDEO SURVEILLANCE SCHEDULE
MAINTENANCE BUILDING
4
CAM RECOR ROOM ROOM MOUNTING MOUNTING CAMER ENCLOSURE MEDIA FOR VOLT
LOCATION ORIGIN NOTES
1 SECURITY PLAN NO DER NO. NAME HEIGHT TYPE A TYPE TYPE TYPE MAT AGE
TY102 SCALE: 1/8" = 1'-0" 01 NVR-1 101 EXTERIOR 12'-0" AFG CORNER AXIS PTZ EXTERIOR DOME COAX POE POE IT 111
02 NVR-1 102 CORR 10'-6"AFF CEILING FIXED INTERIOR MINI DOME COAX POE POE IT 111
03 NVR-1 CEILING FIXED INTERIOR MINI DOME COAX POE
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
MAINTENANCE BUILDING
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U SECURITY PLAN Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TY102
03/09/2017 FAX: MARCH 2017 DKS DKS
Revisions: Date Dwg. 650 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
?
CU-4 DOES NOT TO EXCEED 100 METERS. CONDUIT INSTALLATIONS UNDER FUME
105 STOR AND VENT HOODS ARE PROHIBITED.
WH
105
LOUNGE 106
0
103
6"
6
5 HALL
106
7104
S
2
2
102
LOCKERS 2
102
107 B
1
101B 109 108
3
MEN WOMEN
PIV
B 101A 109 108 B
4
3 DS
0
6"
VEST/MUD ROOM
101
4
C KEY NOTES: C
VA 0730)
6. INSTALL LOCALLY SOUNDING ALARM WITH A LEVEL OF 80DB MIN OR
90DB MAX. COORDINATE WITH VA TO ENSURE 24 HOUR MONITORSHIP
AND TO CONNECT TO THE REMOTE ANNUNCIATOR. (PER VA 0730)
D 7. REFER TO TELECOM DRAWING TN402 FOR TELECOMMUNICATION D
ROOM CONFIGURATION
0
E E
SECURITY VIDEO SURVEILLANCE SCHEDULE
4
CAM RECOR ROOM ROOM MOUNTING MOUNTING CAMERA ENCLOSURE MEDIA FOR VOLT
LOCATION ORIGIN NOTES
NO DER NO. NAME HEIGHT TYPE TYPE TYPE TYPE MAT AGE
01 NVR-1 - EXTERIOR 12'-0" AFG CORNER AXIS PTZ EXTERIOR DOME COAX POE POE STOR 106
0
02 NVR-1 101 VEST 9'-0"AFF CEILING FIXED INTERIOR MINI DOME COAX POE POE STOR 106
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
HONOR GUARD BUILDING
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U SECURITY PLAN Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TY103
03/09/2017 FAX: MARCH 2017 DKS DKS
Revisions: Date Dwg. 651 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
GENERAL NOTES:
1. GO TO SHEET TN601 FOR DETAILS
2. GO TO SHEET TS101 FOR SITE LAYOUT INFORMATION
3. REFER TO SPECIFICATION SECTION 27 05 26 FOR GROUNDING DETAILS
A 4. PATHWAY(S) SHOWN IS A DIAGRAMMATIC REPRESENTATION OF THE A
SYSTEM. ALTERNATIVE ROUTES ARE ACCEPTABLE AS LONG AS WIRING RUN
DOES NOT TO EXCEED 100 METERS. CONDUIT INSTALLATIONS UNDER FUME
0
CR
IRRIGATION WATER
LOUVER
2"C FIBER OPTIC
0
ELEC. EQ
6"
TELECOM CABINET
1 METERING
1
101
4
PIV
C C
KEY NOTES:
1. INSTALL LOCALLY SOUNDING ALARM WITH A LEVEL OF 80DB MIN OR
±45°
FL
OW
1 2 3
D D
0
MAGNETIC LOCK
(SECURE SIDE)
P/T/Z CAMERA
DOOR CONTACT
PUMP STATION (SECURE SIDE)
1 SECURITY PLAN
8
ACCESS.
0' 4' 8' 16'
SECURITY
SECURITY PLAN
PLAN - PUMP
- PUMP STATION
STATION SCALE: 1/8" = 1'-0"
2 WEST ELEVATION
TY104 SCALE: 1/4" = 1'-0"
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title
PUMP STATION
Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U SECURITY PLAN Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TY104
03/09/2017 FAX: MARCH 2017 DKS DKS
Revisions: Date Dwg. 652 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
CONNECT ADMIN
BUILDING TO
AUDIBLE ALARM HORN MAINTENANCE BLDG
FROM UTILITY DRAWINGS (REFER
1 1 TO CIVIL DRAWINGS TO CONFIRM)
12MM & 12SM FIBER
90 MINUTE BACK UP POWER
A SUPPLY DOOR CONTACT A
IP CAMERAS
CONNECT TO OTHER DOOR CONTACTS FIBER
SECURITY CONTROL PANEL TERMINATIONS
NETWORK
INTRUSION ALARM INFRARED
0
POE SWITCH
MOTION DETECTOR. (FDU) IEEE802.3af/at
6"
CARD READER
B B
PIV CR CONNECT TO OTHER CARD READERS
0
TELECOMMUNICATION ROOM DIFFERENT LOCATIONS IN BUILDING TELECOMMUNICATION ROOM DIFFERENT LOCATIONS IN BUILDING
6"
KEYNOTES: KEYNOTES:
1. DISTANCE FROM THE ADMIN BUILDING TO THE PUNCH DOWN AREA IN THE MAINTENANCE BUILDING EXCEEDS 100m BUT IT IS NO MORE THAN 1.24
1. WIRING IN CONDUITS MINIMUM 19mm (3/4"). MILES. PROVIDE MULTIMODE FIBER 6 STRAND 62.5X125 MICRONS CABLE PER NCA NETWORK CABLING SPECIFICATIONS SEPT 1, 2010.
4
2. PROVIDE CONDUIT AND WIRING FROM CONTROL PANEL TO THE PATCH PANEL TO TIE IN TO LOCAL ALARM MONITORING COMPANY (PER NCA FDG 2. COORDINATE VIDEO FEED WITH THE VA
SECTION 12.1.C )
3. INTRUSION DETECTORS MUST HAVE THE FOLLOWING ESSENTIAL FEATURES.
C a. 1. AN INTERNAL, AUTOMATIC CHARGING DC STANDBY POWER SUPPLY AND A PRIMARY AC POWER OPERATIONS. C
b. 2. A REMOTE, KEY OPERATED ACTIVATION/DEACTIVATION SWITCH INSTALLED OUTSIDE THE ROOM AND ADJACENT TO THE ROOM ENTRANCE
DOOR FRAME AND/OR A CENTRAL ALARM ON-OFF CONTROL IN THE POLICE OFFICE.
c. 3. AN AUTOMATIC RESET CAPABILITY FOLLOWING AN INTRUSION DETECTION.
d. 4. A LOCAL ALARM LEVEL OF 80 DB (MIN) TO 90 DB (MAX) WITHIN THE CONFIGURATION OF THE PROTECTED AREA.
e. 5. AN INTEGRAL CAPABILITY FOR THE ATTACHMENT OF WIRING FOR REMOTE ALARM AND INTRUSION INDICATOR EQUIPMENT (VISUAL OR AUDIO). 2 POE CAMERAS SYSTEM RISER DIAGRAM
SEE INSTALLATION NOTE ON PAGE B-3. SCALE: NTS
0
TY501
f. A LOW NUISANCE ALARM SUSCEPTIBILITY.
D D
0
8
E E
4
0
16
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U SECURITY PLAN DIAGRAM Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TY501
03/09/2017 FAX: MARCH 2017 DKS DKS
Revisions: Date Dwg. 653 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
GENERAL NOTES:
2
4
6"
120VAC INPUT
120VAC INPUT
1.0” CONDUIT
3 CORR
2
1
14"
3
3/4" CONDUIT
CONDUIT TO MTR/TR VIA
APPROVED PATHWAY
111
1/2” COND.
1/2” CONDUIT
1/2” COND. 3/4" CONDUIT
1/2” CONDUIT
2 12 1/2” CONDUIT
5
CONDUIT
CONDUIT
CONDUIT
5 5
1/2”
12
1/2”
1/2”
CONDUIT
B B
1/2”
KEY NOTES:
CONDUIT
1/2”
6 6 1. ENT ADA DOOR OPERATOR BUTTON
2. SECURITY CAMERA MOUNTED IN CEILING. 4X4 BACKBOX BY ELECTRICAL
0
7 7 CONTRACTOR.
6"
D D
0
8
E E
4
0
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U SECURITY PLAN DIAGRAM Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TY601
03/09/2017 FAX: MARCH 2017 DKS DKS
Revisions: Date Dwg. 654 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
2 1 2 3 4 5 6 7 8 9
10.7005"
WALL
A A
0
6"
1
TY602 SCALE: NTS 2 WITH LEGS, 610 CROSS CONNECT
TY602 SCALE: NTS
C C
TO DEDICATED
120VAC/20AMP
ELECTRICAL
4'-0"
CIRCUITS
ALTRONIX
0
MAXIM37E
POWER
SUPPLY INSTALL A MINIMUM OF 4'W
3-12 AWG IN 3/4"
CABINET X 8'H X 3/4" FIRE
CONDUIT. INSTALLED BY
RETARDANT PLYWOOD ON 6.8000 71.2000 6.8000
SECURITY CONTRACTOR
WALL OF TELECOM CLOSET
4
12.0000 12.0000
AS INDICATED IN THE
INSTALL DUAL-GANG
AC NO C NC NO C NC BAT
AL1024ULXB
40.0000
QUADRUPLEX. SECURITY
D D
10A 250V
+BAT- -DC+
L G N
+ DC -
INSTALL TELECOM GROUND BAR 2" W
X ¼”H X 10"L CPI PART NO 13622-010 208.0000
+BAT-
3.5A 250V
AL600ULXB
AC DC
L G N
INSTALL 120V/20A
BAT FAIL NC C NO NC C NO AC FAIL
A GROUND
QUADRUPLEX Green
ELECTRICAL WORK Ground Wire
OUTLET (15"AFF)
B INSTALL 120V/20A
QUADRUPLEX
ELECTRICAL WORK
8
OUTLET (15"AFF)
INSTALL 120V/20A 1.0" 8.0000 8.0000
TGB
E E
6.8000 71.2000 6.8000
PIGTAIL IN 152.0000
FLOOR
BID DOCUMENTS
F CONSULTANTS: ARCHITECT/ENGINEERS: A D O L IC E
Drawing Title Project Title
PIKES PEAK NATIONAL CEMETERY
Project Number
933PC2002 Office of F
R
A IG T U SECURITY DETAILS Construction
O
Building Number
NS
CR
C OL
RN
ED
and Facilities
T .G .
8
ER
45462
EER
PRO Approved: Project Director Location Drawing Number
COLORADO SPRINGS, CO Management
4
IN
NAME: BRYAN J. BODNER
FE
SS
IO NA L EN
G
PHONE: (202) 632-5722 Date Checked Drawn TY602
03/09/2017 FAX: MARCH 2017 DKS DKS
Revisions: Date Dwg. 655 of 655
0
VA FORM 08-6231
1 2 3 4 5 6 7 8 9