Note for Approval

Sub: Payment towards steel pipeline laying permission at Kohapur-Sangli Highway


NH-166 (NH-204), Kolhapur

1.0. Preamble

Consortium of HPCL and OIL is authorized by Government of India through its


regulatory board PNGRB to lay, build & operate City Gas Distribution Networks in the
district of Kolhapur.

To develop the CGD network and to meet the Minimum Work Program targets set by
PNGRB, it is essential to lay steel pipeline network for transportation of Piped Gas for
Domestic/Industrial/Commercial Connections.

It is planned to lay steel pipeline networks at Kohapur-Sangli Highway. Accordingly


permissions for laying of pipeline was applied for the same. The Z.P. vide letter dated
17.09.2019 (Annexure 1) granted permission for laying of steel pipeline networks at
NH-166 (NH-204) Kohapur-Sangli Highway for 1.6131 Kms. M/s Deshpande-Patil
Consultants vide Ref. No. DPC/HPOIL/KOLHAPUR GA/ZP-KOLP/DN DATED 27.09.19
(Annexure 2) forwarded us the laying permission letter in their format. The payment
details are mentioned below,

1)Asphalted Roads joining NH-166 (NH-204)

Sr.No. Description Amount(Rs) Note


1. Total Restoration 22,84,410.00 Payment to be done by DD/Cheque in
Amount the name of Chief Account and
Finance Officer, Zilla Parishad,
Kolhapur
Total Amount to 22,84,410.00/-
be paid

Total Amount Rs.22,84,410/- (Rs. Twenty Two lakhs Eighty Four Thousand Four
Hundred and Ten Only).

10% Bank Guarantee of Rs. 2,28,441/- (Rs. Two lakhs Twenty Eight Thousand Four
Hundred and Forty One Only).

The detailed wise restoration charges break up is mentioned below,


Calculation statement from ZP Kolhapur
Length Restoration
Road Details Sr.No. Description Amount (Rs)
(M) Rate (Rs/m)

Asphalt Crossing
VR-25 Joining to MSH-6 From Halondi At KM
1 0/00 14.5 5500 79750

ODR-192 Joining to MSH-6 From Herle Mauje


2 15.9 5500 87450
Vadgaon Tasgaon to Vadgaon road at km 0/00
VR-28 Joining to MSH-6 from Herle Male
3 Mudshingi at KM 0/00 5.5 5500 30250

VR-142 Joining to MSH -6 Herle Hanuman


4 temple at KM 0/00 5.2 5500 28600

VR-27 Joining to MSH-6 from Male Malwadi at


5 KM 0/00 8.35 5500 45925

VR-28 Joining to MSH-6 Herle Male Mudshingi


6 at KM 5/500 8.3 5500 45650

VR-30 Joining to MSH-6 from Atigre to


7 Chaugulewadi at KM 0/00 3 5500 16500

ODR-33 Joining to MSH-6 from Aalate Majale


8 at KM 0/00 10.95 5500 60225

VR-96 Joining to MSH-6 from Datta sutgirani to


9 Aalate Majle at KM 0/00 5.5. 5500 30250

ODR-32 joining to MSH-6 from Ramping


10 Devalay to Dhuloba Devalay at KM 0/00 5.5 5500 30250

VR-62 joining to MSH-6 from Majle ( via More


11 Mala) at KM 0/00 5.5 5500 30250

ODR-33 joining to MSH-6 from Aalate Majale


12 at KM 9/100 10.5 5500 57750

Kolhapur Sangli Side Shoulder Along


Highway NH- VR-244 from VR-No.26 To Nandiwale Estate
13 (Nagaon) Road from KM 0/00 To 1/500 1500 1150 1725000
166(NH-204)
Side Shoulder Crossing
VR-25 joining to MSH-6 From Halondi At KM
14 1.2 1150 1380
0/00
ODR-192 joining to MSH-6 From Herle Mauje
15 Vadgaon Tasgaon To Vadgaon Road At KM 1.2 1150 1380
0/00
VR-28 Joining to MSH-6 from Herle Male
16 Mudshingi at KM 0/00 1.2 1150 1380

VR-142 Joining to MSH-6 from Herle Hanuman


17 Temple at KM 0/00 1.2 1150 1380

VR-27 joining to MSH-6 from Male Malewadi


18 at KM 1.2 1150 1380

VR-28 Joining to MSH-6 from Herle Male


19 Mudshingi at KM 5/500 1.2 1150 1380

VR-30 joining to MSH-6 from Aatigre To


20 Chougule Wadi at KM 0/00 1.2 1150 1380

ODR-33 joining to MSH-6 from Aalate Majale


21 at KM 0/00 1.2 1150 1380

VR-96 joining to MSH-6 From Datta Sutgirini


22 To Alate Majle at KM 0/00 1.2 1150 1380

ODR-32 joining to MSH-6 from Ramling


23 Devalay To Dhuloba Devalay at KM 0/00 1.2 1150 1380

VR-62 joining to MSH-6 from Majle (via More


24 Mala) at KM 0/00 1.2 1150 1380

ODR-33 joining to MSH-6 from Aalate Majale


25 at KM 9/100 1.2 1150 1380

TOTAL 1613.1 22,84,410

GRAND TOTAL 22,84,410


It seems that rates are high considering nature of road ,in this regard we advised the
contractor to negotiate with ZP but as per ZP, rates claimed by them are as per Government
GR and thus cannot be negotiated.(Annexure 3)

2.0. Proposal

It is proposed to go ahead with the laying of steel pipeline uninterrupted to meet the
MWP of the Financial Year by providing laying permission charges amounting to Rs.
22,84,410/- and 10% Bank Guarantee of Rs. 2,28,441/- (Rs. Two lakhs Twenty Eight
Thousand Four Hundred and Forty One Only)

The payment to be made by cheque/DD in the name of Chief Account and Finance,
Zilla Parishad Kolhapur.

3.0. Approval Sought:

As per Clause 10.a. of Revenue Expenditure related to Project of delegation of power,


approving authority for approval of Revenue Expenditure is CEO/CFO. Hence,
approval of CEO/CFO is sought to make payment of Rs.22,84,410/- and 10% Bank
Guarantee of Rs. 2,28,441/- towards steel pipeline laying permission at Kohapur-Sangli
Highway NH-166 (NH-204), Kolhapur for 1.6131 Km.

Proposed By: Reviewed By:

Hemant Kumar Sunil Sadmake


Manager(BD-CGD) Project Head-Kolhapur CGD

Approved By:

Jyotirmoy Bhattacharya
CFO - HOGPL

Arun Kumar Mishra


CEO – HOGPL

Attachments:

Annexure 1: Z.P. Letter dated 17/09/2019.


Annexure 2: M/s DPC Letter dated 27.09.19
Annexure 3: Mail Communication-High Permission Charge
Annexure 4:M/s DPC Clarification letter of road restoration scope