You are on page 1of 1
HS.1 LADDER © HSA The tank interior is considered a confined space environment with restricted acces (sce API RP 2026). I'pcifcd by ¢he Purchaser, the tank shall be supplied wih a lader for ictemal floating roof deck acess. Ife Inder i not supplied ar the floating root snot tel, ladder landing pd shal be provided on he foting root. *H.5.21 Internal Floating Roof Pressure-Relieving Vents 5.2.1.1 Vents suitable 10 prevent overstessing of the roof deck or seal membrane shal be provided on the floating roof These vert shall be adequate to evacuate air and gases from undemeath the roof such thatthe intemal floating roof i no lifted from resting on its supports during filling operations, until floating onthe stored liquid. The vents shall also be adequate to release any vacuum generated undemeath the roof aftr it setles on its supports during emptying operations to limit the floating oof ‘extemal pressure to Ps. The Purchaser shall specify filing and emptying rates. The manufacturer shall size the vents, © HAAT Each closed flotation compartment shall be capable of being fcld-inspected for the presence of combustible gas. Inspection openings shall be located above the liquid level an closed compartments shal be capable of being rescaled inthe field afer periodic inspection (to prevent liquid or vapor entry). Closed-op compartments (types H.2.2c and g) shall be acessible from the top ofthe internal floating roof and provided with a seeured and gesketed manhole for visuel internal inspection andthe manhole cover shall be provided with a suitable vent. The top edge ofthe manhole shall extend a minimum of 25 ma (1 in.) above the top ofthe pontoon rimski, With agreement by the Purchaser, type F.2.2,d, and g loatng roofs 6 m (20 fn diam- fer or less may be provided with an inspection port in place of a manhole. The inspection por must meet the sealing, securing and extension requremen listed here for manholes in interna loatng roof closed compartments H5.223 If circulation vents (per H522.1 and H.5.2.22) are no installed, gas blanketng or another acceptable method to prevent the development of a combustible gas mixture within the tank is required. Aditionaly, te tank shall be proveted by ressure-vaouam vers in accordance with 5.8, based on information provided by the Purchaser H.5.4 ANTLROTATION AND CENTERING DEVICES ‘The internal floating roof shall be cestered and restrained fiom rotating. A guide pole with rollers, two or more seal centering ‘cables or other suitable device) shall be provided as required for this purpose. The internal floating roof shall not depend solely fn the peripheral seals or Vertical penetration wells o maintain the centered position of to resist rotation. Any device wsed for citer purpose shall not interfere withthe ability of the intemal floating roof to travel within the full operating elevations in accor dance with H.A.11. 115.52 Floating-Roof Manholes Atleast one internal floating roof deck manhole shall be provided for access to and ventilation of the tank when the floating roof is on its supports and the tank is empty. The manhole skal have a nominal opening of 600 am (24 in.) or larger and shall be pro vided with a bolted or secured and gasketed manhole cover. The manhole neck dimensions shall meet the requirements of H..1.4 and HA. H.6 Fabrication, Erection, Welding, Inspection, and Testing © 61 The applicable fabrication, erection, welding, inspection, and testing requirements ofthis Standard shall be met. Upon the start of internal floating roof installation, or concurrent with assembly within a tank under construction, the tank (interior shell and vertical components) shall be inspected by the floating roof erector, unless otherwise specified. The purpose of this inspection shall be to confirm plumbness of ll interior components, along with roundness and the condition ofthe shell (forthe presence of damage, projections, or obstructions) to verify that the floating roof and seals will operate properly. Any defects, projections, obstructions or tank tolerance limits (exceeding those defined in 75 ofthis Standard), which would inhibit proper internal floating roof and seal operation, that are identifiod by the intemal floating roof erector shall be reported tothe Purchaser. H.63 The Doing rof Manure stall suply ll fing of clos ree for tesing per W413, HALT, HAL, and F.62 Rivets se aping res, nd movable sections ae ol aceplabl ret pls

You might also like