Professional Documents
Culture Documents
48
N
CROSS ROAD PLAN E
W
S
0+2
00
MAIN CARRIAGE WAY
CARRIAGEWAY 7.0m
SEPARATOR 0.75m
SERVICE ROAD 6.5m
PAVED SHOULDER 1.5m
R2
APPROVED
0m
STOP
STO
20m
PROJECT MANAGER:SHAJ PIU
P S
20m
P TO
TOP
20m
PS
20m
STO
MEDIAN OPENING
MEDIAN OPENING
STOP
5m
R5
5000
R2 CONSTRUCTION SUPERVISION AND QUALITY CONTROL
4900
4800
0m
SUPPORT CONSULTANTS (DMEC - RODIC)
0+1
0 0
0+0
NARIMAN POINT,
DARASHAW & CO.PVT.LTD MUMBAI - 400021
SABEESH
CYCLE TRACK
00
PROJECT: DESIGNED:
STRENGTHENING, DEVELOPMENT TO FOUR LANE WITH SERVICE
SECTION - 'A-A' LANE AND CYCLE TRACK AND BEAUTIFICATION OF KAKO CHOWK TO
BINOD BIHARI CHOWK VIA SHAKTHI CHOWK ROAD IN DHANBAD, CH.PREETHAM
JHARKHAND (FROM KM.0.000 TO KM.11.700) NCB01 CHECKED:
0+
24
8
0+
20
0
480
0
490
0
0+
10
0
500
0
0+
00
0
51
CROSS ROAD PLAN
00
KEY PLAN
Chainage=248.145m
Chainage=235.200m
LETTER No. APPROVED DATE:-
Level=237.669m
Level=237.436m
Chainage=193.200m
Chainage=118.964m
Chainage=116.640m
Level=236.428m
Chainage=158.961m
Chainage=133.890m
Chainage=102.674m
STATE HIGHWAYS AUTHORITHY OF JHARKHAND
Chainage=92.837m
Level=235.578m
Level=235.571m
Chainage=78.529m
Level=235.401m
Level=235.277m
JHARKHAND MUNICIPAL DEVELOPMENT PROJECT
Level=235.203m
Level=234.992m
Chainage=48.529m
Level=234.756m
PROJECT IMPLEMENTATION UNIT, DHANBAD
Level=234.186m
PROJECT MANAGER:SHAJ PIU
Chainage=0.000m
Level=233.143m
-0.302
-0.629
-0.770
-0.714
-0.576
-0.434
-0.308
-0.182
-0.081
-0.007
0.000
0.031
0.022
0.013
0.008
0.008
0.009
0.008
0.076
0.061
0.038
0.020
FRL-ERL DIFFERENCE
232.665 232.974 233.143 233.143
232.843 233.104 233.327 233.358
233.079 233.268 233.551 233.573
233.328 233.433 233.774 233.788
233.552 233.573 233.994 234.003
233.886 233.745 234.210 234.218
234.115 233.888 234.412 234.422
234.177 234.356 234.602 234.609
234.471 234.740 234.781 234.780
234.443 234.934 234.961 234.945
234.523 235.027 235.140 235.136
235.025 235.138 235.320 235.396
235.349 235.336 235.496 235.557
235.481 235.502 235.658 235.356
235.737 235.634 235.820 235.192
235.948 235.436 235.983 235.212
236.063 235.261 236.145 235.432
236.441 235.182 236.308 235.732
236.780 235.257 236.465 236.032
236.619 235.960 236.640 236.332
236.271 236.191 236.808 236.625
236.736 236.197 236.972 236.892
236.520 236.203 237.136 237.129
236.457 236.190 237.301 237.339
237.454 236.728 237.502 237.522
237.742 236.942 237.669 237.669
FINISHED ROAD LEVEL
K K G K FEB-2020
ENGINEERING CONSULTANT: HEAD OFFICE
DRAWN:
12th FLOOR, REGENT CHAMBERS,
RHS=2.500% DARASHAW & CO.PVT.LTD NARIMAN POINT,
MUMBAI - 400021
SUPERELEVATION PROJECT:
SABEESH
DESIGNED:
TITLE:
DESIGN CHAINAGE JUNCTION PLAN & PROFILE SK SINGH
APPROVED: