If 20% people of peak time then, = 1500x20/100 = 300 persons 3 min time Duration of elevator = 300/3 = 100 If 16 persons in 1 elevator at one time so, 100/16 = 6.25 no of elevators So we require 6 elevators required for nestle users
Nestle Users = 1820