Professional Documents
Culture Documents
Sd Su 793 r00 حديدoffset b
Sd Su 793 r00 حديدoffset b
Work Inspection
Contract No. 012018 SD-SU-793
Request No.
MOHAMED HARASANI
To Consultant Date 02-01-2020
ARCHITECTS
Date Inspection 02-01-2020
Requested
استالم ارتفاعات الكراسي Time Inspection
02:00 PM
Description Of Works To Be سقف الثالث Requested
Inspected And / Or Tested
Civil Architectural
PART (B)
Discipline Mechanical Electrical
SURVEY
Block No.
Level
Element
Signature
MHA PM
Engineer’s Decision ENG. MEDHAT
Ali Hurmuzlu
(the work is) ENG. BILIL HARFOUSH
Date Signature
Signature
A) – Work shall only proceed when action is only approved or approved as noted
B) – Approval of this document does not release contractor of his obligations