You are on page 1of 2

Project: PASIG SPORTS ARENA

Location: F. ANDRES ST., ROSARIO, PASIG CITY


Date: September 28, 2018

BEAM AND GIRDER REBAR INSPECTION REPORT

Beam and Girder with defficient items and corrections


1. GMB-3 at the left side of GMG-6 in grid line 7
Web bar not sufficiently tied with the stirrups. It should be tied at all intersections
2. GMG-12b
Splice of continuous bottom bar not yet installed.
3. GMG-6
2 continuous top bar not met the minimum lap splice length.
Web bar not installed.
4. GMB-3 at the left side of GMG-6 in grid line 6
Continuous top bar not met the minimum lap splice length.
Web bar not installed.
5. GMG-11
No extra bar at midspan and at top left support
No web bar installed.
6. GMG-7
No web bar installed.
7. GMG-12
No web bar installed.
8. GMG-8 in grid line 4/J-K
Extra bar at top right support and web bars not yet installed
9. GMG-7a
No extra bar at midspan
2 continuous bottom bar not splice through the column.
10. GMG-3a right of grid line 5
No extra bottom bar at midspan.
11. GMG-13
No extra bar at top left support
12. GMB-3a left of grid line 6
No web bar installed.
13. GMB-3a right of grid line 6
Web bar not sufficiently tied with the stirrups. It should be tied at all intersections
14. GMG-13a between grid line 6 and 7
No extra bar at right support.
Continuous top bar not met the minimum lap splice length.

Beam and Girder completely installed and no corrections.


1. GMG-6 and GMG-6a in grid line 7
2. GMB-3 at right side of grid line 6
3. GMB-3 at right side of grid line 5
4. GMB-7
5. GMG-6a in grid line 6
6. GMB-22
7. GMB-29

Inspected By: Received By:

Romyr P. Nacar Jonald Lalo


QA/QC Engineer Site Engineer

Jose R. Yodico
QA/QC Inspector