第一章 機組概論
..................................................................................................... 2
一、 概 述 ................................................................................................................... 2
1. GENERAL INTRODUCTION ............................................................................................... 2
二、 機組設備組成......................................................................................................... 2
2. COMPONENT PARTS IN LINE ............................................................................................ 2
三、 工藝流程............................................................................................................... 3
3. TECHNOLOGICAL PROCESS ............................................................................................. 3
四、 機組的安裝............................................................................................................ 3
4. INSTALLATION................................................................................................................ 3
五、 機組的維護、保養及安全技術.................................................................................. 4
5. SAFEGUARD, MAINTENANCE & SAFE-TECHNOLOGY ........................................................... 4
第二章 簡易放料架
.................................................................................................. 6
第一節 概 .....................................................................................................................
述 6
1. GENERAL INTRODUCTION ...................................................................................................... 6
第二節 技 .............................................................................................................. 6
2. TECHNICAL PARAMETER ........................................................................................................ 6
第三節 使用 性 ........................................................................................................... 6
3. APPLICATION & PERFORMANCE ............................................................................................... 6
第三章 自動扇形分條機使用說明
............................................................................... 7
一、 基本參數............................................................................................................... 7
1. PARAMETER ...................................................................................................................... 7
二、 构造及工作原理 ..................................................................................................... 8
2. STRUCTURE AND OPERATION PRINCIPLE .................................................................................... 8
三、 安裝、調試及注意事項............................................................................................ 9
3. INSTALLATION, REGULATION & ATTENTION ................................................................................ 9
四、 主機的維護、保養和安全技術.................................................................................. 9
4. SAFEGUARD, MAINTENANCE & SAFE-T ECHNOLOGY ....................................................................... 9
Auto Taper Slitting Machine -2-
一
CHAPTER Ⅰ ESSENTIALS
一、 述
1. GENERAL INTRODUCTION
本生產 用 成 開 , 行橫 和和 向分 。橫向 帶有 功
This production line is to un-coil the sheet, and then pre-shearing and slitting. The
pre-shearing device is with cut-to-length control, and the slitting can do auto taper
The steel sheet after shearing and slitting from this equipment can be sent to next
If feed the banking sheet into double sides manual roll former, then it can produce
taper profiles. The taper profiles can be used in the building with round roofing section.
二、 成
本 由 列各 成(
: 見 “機組工藝流程圖”)
The complete line is composed of the machine as follows. Please refer to the Flow
Diagram
① 簡易 料架;②前 + 形分 ;
PLC
③ 制 ;④成品托架(用戶自 ;
)
① Manual un-coiler
三、 工 程
3. TECHNOLOGICAL PROCESS
看附件平面佈
、 的
4. INSTALLATION
1. 各 運 , 首先 技 檔,仔 閱 檢 各 : 單
對 中各 是否 全,並 附件 易損件 日 。
When the machines arrive, please claim the technical documents first. After careful
reading, please inspect the external devices of the complete line: check the
equipment according to the order / packing list for completeness, and record
漆, 用棉 團、毛毯、 等軟質物墊 鋼 間。
The steel cable used for lifting the equipment must be more than 16mm in diameter.
Cotton yarn roll, blanket, rubber and other soft material are suggested to be put
between the steel cable and the machine against the paint of the machine going off in
3. 的地基 有一 的堅固性和平面 。
4. ,要 用 水 在 向和橫向分別 對水 ,其 向 不得大
0.15mm/1000mm。
After placing the machines, please regulate the horizon both lengthwise and
0.15mm/1000mm.
5. 各 的 的 一性要求:
The installation of every machine must comply with the following uniform
requirements.
各 的工作 要求等 ;
各 的中心平面要求在同一水平面 ;
各 的間 “ 工 程 ”上 注明的尺寸 行 ;
各 的工作 速 要求基本一 。
The working speed of every machine should be the same on the whole.
成功。
Once intalled, the machine should be first checked to ensure that every machine
accords with the above requirements. If sure, check the test of the machine in
no-load condition. If there is nothing abnormal, the machine is allowed to run the
sheet. The successively running of the machine and the producing of qulified panel
五、 的 、保 全技
1. 在使用操作前,必須仔 閱 本 明書 瞭 本 各 的工作性 使用
, 樣 期保 好的狀 , 使用壽命。
Before operating the equipments, please read this manual to understand the working
service life.
2. 在 一次使用前 先行 , 檢 各 是否運行正常。
Please put the machines to trial before application at every turn to ensure that them
工作, 生危險。
Delimit a 1.5m-width boundary line of working area on each side of the Complete Line
and forbid other staff members inside the area in case of any interference of regular
4. 保 周 的 生, 不 在 的 中工作。
Please keep clean in the surroundings of the machines. The machines should not be
二 簡易 料架
II MANDREL UN-COILER
一 述
1. General Introduction
本簡易開 有動力, 動 料。手動 (或 開)鋼 孔, .構簡單.易
The simple un-coiler is a manual one. It’s un-powered and with drag-off type rotation.
二 技
2. Technical Parameter
描述
DESCRIPTION SPECIFICATION
鋼 孔Coil inner diameter 508mm
鋼 徑Coil outer diameter MAX. 1200mm
鋼 Coil Width MAX.1250mm
鋼 重量Capacit y MAX.5Ton
形尺寸Overall dimension 1990*1000*1100mm
三 使用 性
The Un-coiler is suitable for galvanized steel coils , pre-painted GI steel coils, iron
coils, etc.
Auto Taper Slitting Machine -7-
三 自動 形分 使用 明
一、 基本
1. Parameter
描述
DESCRIPTION SPECIFICATION
工作
Max. 1250mm
Working width
工作 厚 Aluminum sheet: 0.7-1.2mm, yield strength: 245Mpa
Working thickness PPGI: 0.4-0.8mm, yield strength: 245Mpa
橫 範
0°≤θ≤5 °
Angle of Pre-Shearing
分 範
0°≤θ≤15°
Angle of taper slitting
小頭尺寸Smaller end min. 50mm, max. 1200mm
大頭尺寸Bi gger end min. 50, max. 1250mm
送電 Feed-in Moto r GR77-Y2.2-43.26-4-M1
料電 Run Out Moto r GR77-Y2.2-43.26-4-M1
橫 電
RV63-0.75kw-15
Motor for Shearing
橫向 動伺服電
SIEMENS 0.82KW
Servo motor
珠 杆Ball Screw 1R32-5-FSI-1380-1500
大 形尺寸
2050×1900×1200mm
Overall dimension
工作速 Workin g speed Approx. 12m/min
主 重量 Total weight Approx. 1 Tons
Auto Taper Slitting Machine -8-
二、 构造 工作原理
1. 工作原理图(见附图)
将平板往前引送,
2. 减速电机 1驱动进料辊, 穿过前剪装置和分条轮,
引送至动力出料辊。
The powered feed-in shaft driven by AC motor 1 to run the flat sheet move forward,
go through the pre-shearing device and slitting rollers and then reach the powered
The powered run-out shaft driven by AC motor 2 to run the flat sheet (which has been
合成形成设 的 路 。
The slitting wheel driven by a servo motor with gear box and ball screw, moves on
line bearing in horizontal direction. It work with the sheet moving in vertical direction
6. 电动前 的 可手动调整。
After the pre-shearing device cut-off the flat sheet, the powered feed-in shaft stop.
The sheet which has been cut-off is driven by the powered run-out shaft and
continues moving forward. Only after the sheet which has been cut-off leave the
equipment, and the slitting wheel resets, then the feed-in shaft continues working to
三、 、 注 事項
Before running, all the sundries on the machine should be taken away and all the
connect parts should be checked. Clean the forming-rollers with oil-fabric. Only when
换。
The tooling wheel in the pre-shearing device is the same as the tooling wheel in the
slitting device. There are two sets of spare tooling wheel dispatch with the machine.
、 主 的 、保 和 全技
日常工作中要注 保 和 , 使用壽命。
Before operating the equipments, please read this manual to understand the working
service life.
2. 在工作期間,要求 期 或更 減速 的 油, 期對軸承加注黃油。
The engine oil in the retarder should be supplied or replaced at regular intervals and
3. 勿用 生產超厚 或 有硬疤、夾 焊 等 的 料, 損 相 模 。
DO NOT produce over-thick steel sheet or hard-scar on it. Otherwise, the tooling
would be damaged.
Auto Taper Slitting Machine -10-
生 或其 物掉 。
If the machine is not used for a long time, the driving system such as screw and the
tooling should be oiled and covered with plastic film to keep them being rust-eaten
5. 運轉 如 生不正常 , 車檢 , 復 重 開車使用。
When the running machine makes abnormal sound, stop the machine and check
immediately. Only after trouble is found and solved, the machine can be restarted.
6. 在 整 電 止, 生 。
When regulating the machine, the drive motor should be stop in case of accidents.
PLC CONTROL SYSTEM
OPERATION MANUAL
A. ATTENTION
1. Do supply the product with reliable ground connection. PLC connection, the motor connection
380V±10%. If the voltage is not within the requiring limit or the electrical wire
netting is not stable, please provide with line form 1KVA UPS regulated power supply.
3. Do not expose the control box right under the sunshine. Do not use this control board in the place
where the air was polluted for the serious powder & dust or causticity gas and so on. Please keep
5. Do separate such controlling lines as coding apparatus, power line to avoid interference. Connect
the lines of electrical machinery electromagnetic valve and main power source from the side of
inverter, while the lines of coding apparatus and photoelectric switch from the other side of the
control power.
6. Ambient temperature variations of PLC: 0-40℃. Ambient temperature variations of IOP: 0-60℃.
7. The rated current of frequency must mate with the motor nameplate. It is not permitted to drive
the motor which power is higher or lower than half of requirement of the inverter.
9. During the power off or not work, please SHUT OFF the general power switch QF1 & control circuit
10. In the maintaining process, please refer to the above items to ensure safe. If require moving the
machine, it is necessary that the special person operate the control board and who can’t presume
to leave.
11. When transiting the PLC control box, it should be make a measure to take precautions against
12. If the machine is damaged or personnel are injured for ignoring the above items, the expense
13. If there is any change about the wiring within the control power. Excuse for not to notify later.
PLC CONTROL SYSTEM 3
1) Adjusting and producing for the buttons and switches in the PLC control system in manual
2) It can be used IOP on the operation table of control box according to the pieces and length
3) Use the Encoder to follow the moving length of the steel plates automatically. When running
4) The whole processes of cutting actions are running automatically. The display shows the
dynamic states of machines, such as the dynamic states of batch number piece number and
5) In the operation manual, it is able to control separately the running of the hydraulic oil pump,
the action of cutting tool and the main motor in the manual mode.
6) It is able to store the information’s if power fails, It stores the informational of working batch
and the number of already cut steel word if the former starts again, it is able to continue to
C. MANUAL OPERATION
D. I.O.P Operation
IOP is used to set the parameter (such as batches, length and pieces, etc.) of the forming line in the
AUTO mode and display alarm, moreover, which is the operation display board of current running
status.
When power is served, the screen will firstly show the above interface, press the “enter”button to
2. Running State
This display shows the current running state of the machine, such as shows the running batch, the
The button “HOMEING” is to run the slitting wheel back to initial position.
PLC CONTROL SYSTEM 7
The “RESTART”botton is used to change the operation after reset the order, running from the
setting of the first batch and first piece and product length “0”when meet the below display terms
The “CONTINUE”botton is used to continues the working paused last time, such as adjust the
“CURRENT”
end-limit-switch
4 ORDER SETTING The setting of width of bigger edge and the width of
4. Parameter Setting
ATTENTION: Parameter setting is used to set different kinds of parameters, because these
parameters will affect the precision of the production, please be more careful when you want to
change the values. We DON’T suggest you change any of the values if not necessary.
1 HI SPEED DIST. In AUTO mode, the distance in low speed of the machine before
speed value, if the value set is too small, the length is not
2 PRE_CUT TO The distance between the motorized pre-shearing device and the
3 LOCKUP COMP. The lockup error caused by the inertia when the machine stops,
the value is fixed usually, we can see to adjust from the “current
the machine stop fully, the cutter will cut, then we can see the
actual length will be more or less compare to the set length, that
PLC CONTROL SYSTEM 9
errors. If the lengths and the errors of each piece are different,
errors.
mm) / 1000)
5 ZERO OFFSET The distance between the initial position of servo motor and the
DIST. fix side of the feeding coil <fix guide section>. This parameter
has been set and not need modify except the fix guide section
moved.
7 Counter Wheel To set the perimeter of the counter wheel, can be measure by the
Circum caliper
PLC CONTROL SYSTEM 10
1 MASTER MANUL To set the speed of the main device required to run in the manual mode
SPEED
2 FEED MANUAL To set the speed of the feeding device required to run in the manual mode
SPEED
3 MASTER AUTO To set the maximum speed of the main device required to run in the auto
4 FEED AUTO HI. To set the maximum speed of the feeding device required to run in the
5 MASTER AUTO To set the low speed of the main device required to run in the auto mode
LOW SPEED
6 FEED AUTO LOW To set the low speed of the feeding device required to run in the auto
SPEED mode
PLC CONTROL SYSTEM 11
After setting the width of bigger edge and the width of smaller edge, press the button
“ANGLE COUNT” to calculate the width difference and the gear rate automatically.
PLC CONTROL SYSTEM 12
6. PLC STATE
This is the indicator for the current system inputs, wh ich is used when the machine has error during running.
If the machine has signal input, it will shows ON; If the machine has no signal input, it will shows OFF.
PLC CONTROL SYSTEM 13
Attention: the inverter parameters has been regulated before the equipment is sent out, please don’t chang
P.S.: Please stop the roll former before set up the inverter parameter.
PLC CONTROL SYSTEM 14
厂默
小设
参数编
设 范围 设 值
名 认值 备注
单
Adjustment Setting
Description Factory Marker
Range Min. setting value
Code default
unit
value
P.4 0~650Hz 0.01Hz 60Hz 50
1速( 速)
First preset speed
(high)
P.5 0~650Hz 0.01Hz 30Hz 5 速速
2速(中速)
Low speed
Second preset speed
(middle)
P.6 0~650Hz 0.01Hz 10Hz 0 机速
3速( 速)
Stop speed
Third preset speed
(low)
P.7 0~3600s 0.01s/0.1 5s 1
加速时间
s
Acceleration ramp
times
P.8 0~3600s 0.01s/0.1 5s 1
减速时间
s
Deceleration ramp
times
P.24 0~650Hz, 0.01Hz 9999 50 速速
4速
9999 High speed
Fourth preset speed
P.79 0~8 0 0 2
操作模式
Mode of
operation
0 1 2 3 4 5 6 7 8 9
-QF1
L1 R1
2 1
I>
-X1 L1
L2 S1
4 3
I>
-X1 L2
L3 T1
6 5
I>
-X1 L3
PE
-X1 PE PE/ 4.4
1 1
-QF2
2 2
S2 R2
1 2
1 3 5 13
-QF3 -T1
14
3 4
I> I> I>
/4.6
2 4 6
-servo -F1 -F2 L N
U1/L1 V1/L2 W1/L3 PE /3.0 F1:R/L1 S/L2 T/L3 PE /3.6 F1:R/L1 S/L2 T/L3 PE
-R2 /4.5 /4.6
x1 x2 R01 /1.2
R1 /1.3
/1.2 F1:U/T1V/T2 W/T3 PE F1:U/T1 V/T2 W/T3 PE
/1.3 R3 S3 T3
R02 R2
U2 V2 W2 PE
1 1 1 1 1 1
-KM1 -KM2
/4.7 2 2 2 /4.8 2 2 2
散热风
-M5
-G1 1 2
M
1~
-X1 U1 V1 W1 PE X1 U2 V2 W2 PE X1 U3 V3 W3 PE
X1 U4 V4 W4 PE
U1 V1 W1 PE U2 V2 W2 PE U3 V3 W3 PE U4 V4 W4 PE
U1 V1 W1 PE U2 V2 W2 PE U3 V3 W3 PE U4 V4 W4 PE
-M1
M -M2
M -M3
M -M4
M
0.82KW 3 2.2KW 3 2.2KW 3 0.75KW 3
伺服电机 主电机1 主电机2 电机
+24VDC 0VDC N L
servo motor main motor 1 main motor 2 pre-cut motor 2.0 4.7 4.7
2
日期 2016-07-25 主回路 =
对. ZQX +
审 YR151105 IEC_tpl001 页 1
日期 姓名 原 项目 替换 替换人 页 4
0 1 2 3 4 5 6 7 8 9
+24VDC
/
+24VDC
13
13 13 13 13 13 13
-SQ1 -SQ2 -B1 -SQ3 -SQ4
14 14 14 14 14 14
-SB8 -SB9 14
20 22 24 26 28 30 32
ET200S-8DI 1 2 3 4 5 6 7 8
0VDC
0VDC/ 1.7
+24VDC
/
+24VDC
1 2
13 13 13 13 11 13 13 13 13
+ -
-SA1 -B2
14 14 -SA1 14 /2.2 14 12 14 14 14 14
-SB2 -SB3 自动 -SB1 -SB4 -SB5 -SB6 -SB7 3
/2.2
手动
+24VDC
02 04 06 08 10 12 14 16 18 34
D410-2 1 2 3 4 5 6 7 8 10 11
D410-2 3 4 5 12
/2.6 /2.0
/3.0 M2 M2 /3.0
/3.6 /3.6
/4.0 伺服正转 伺服 转 手动 自动 急 主机1正转 主机1 转 主机2正转 /4.0 主机2 转 对 式光电
servo forward servo backward manual mode aoto mode e-stop running running running running photoelectric
X121 forward1 backward1 forward2 X120 backward2
1 3
日期 2016-07-25 制输 =
对. ZQX +
审 YR151105 IEC_tpl001 页 2
日期 姓名 原 项目 替换 替换人 页 4
0 1 2 3 4 5 6 7 8 9
0VDC
0VDC/ 3.0
+24VDC
/
+24VDC
D410-2 + + M M 2L+ 2M 2 3 1 3 5 7
/2.0
/2.6
/3.6 6ES7193-4CE00-0AA0:
/4.0 6ES7151-1CA00-0AB0
X124 口模块 子终 模块 2AO模块
ET200S-8DO D410-2
正转输 1 转输 1 全指示 正转指示 转指示 正转 转 /2.0 正转输 2 转输 2
running forward1 running backward1 safety indicator forward indicator backward indicator pre-cut forward pre-cut backward /2.6 running forward2 running backward2
/3.0
/4.0
1 2 3 4 5 6 7 8 X131 1 2 4 5
03 05 09 11 13 15 17 19 21
0VDC 0VDC
3.0 3.2
x1 x1 x1 A1 A1
-P1 -H3 -H4 -KA1 -KA2
x2 x2 x2 A2 A2
-F1 -F2
/1.2 SD STF STR M0 M1 /1.3 SD STF STR M0 M1
/4.5 /4.6
/1.2 变频
/1.3 2 5 2 5
/1.2
/1.3
变频
0VDC
3.6 3.6 0VDC/ 3.6 3.6 3.7
23 25 27 29
2 4
日期 2016-07-25 制输 =
对. ZQX +
审 YR151105 IEC_tpl001 页 3
日期 姓名 原 项目 替换 替换人 页 4
0 1 2 3 4 5 6 7 8 9
D410-2 4 红
SICK
/2.0 5V+
5V+ + 编码
/2.6 encoder
/3.0
/3.6 +24VDC
X23
/
+24VDC L / 1.8
7 5V- 蓝
5V- -
13 13
A A 13
-KA1 -KA2
/3.4 14 /3.5 14
10 Z+ 淡 -F1 -F2 QF3
N+ Z /1.2 C /1.3 C /1.5 14
L01 L03
-HMI 101
11 Z- 黄 24V
N- Z-
1 1
PE
PE/ 1.8 -KM2 -KM1
0V /4.8 2 /4.7 2
12 黑 L02 L04
B-
B- B-
x1 x1
-H1 -H2 A1 A1
电源指示 x2 故 指示 x2 -KM1 -KM2
power indictor fault indictor 正转 转
A2 A2
13 B+ 粉 pre-cut forward pre-cut backward
B+ B
0VDC
14 A- 0VDC/ N/ 1.8
A- A-
15 A+ 白
A+ A
1 2 /1.5 1 2 /1.6
1 2 /1.5 1 2 /1.6
1 2 /1.5 1 2 /1.6
1 2 /4.8 1 2 /4.7
3
日期 2016-07-25 编码 =
对. ZQX +
审 YR151105 IEC_tpl001 页 4
日期 姓名 原 项目 替换 替换人 页 4
0.82KW+2.2KW+2.2KW+0.75KW单 S/N
变频电气设备清单 :YR151105
ELECTRIC COMPONENTS LIST S/N:YR151105
符 /CODE 名 /NAME 型 /TYPE 件 /QTY制造 /MANUFACTURER
编码 /encoder cable
电缆 6FX5002-2DC10-1AF0 5m 1 门子/Siemens