REMARKS:
The attached signatures certificate that the eNodeB has been accepted according with the describe tests in this document.
Revision number: 00
Date of issue: January, 16th , 2018 1 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
A. eNodeB SITE INFORMATION
Site ID : 104138LU1
Site Name : Kayumanis Cibinong
Site Address :
Jl. Raya Kayu Manis RT. 02 RW. 03 Kel. Cirimekar Kec. Cibinong Kab. Bogor
Revision number: 00
Date of issue: January, 16th , 2018 2 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
B.2 Dismantle Hardware (if any)
1. MRFU (4G)
2. RRU………. (4G)
3. …………………
* Fill only equipment that dismantle for eNodeB MIMO Upgrade
1 Cables should be tiled with uniform spacing and moderate tightness. Cable ties should YES
be tied in a tidy way.
2 The board can be plugged and unplugged smoothly. Its panel screws should have YES
appropriate tightness if they exist.
C.2 Others
No Check Content YES / NO / N/A
2 Check that all installation and packing materials have been removed from the site YES
3 The equipment room should be neatness and tidy. Discarded packing materials should YES
be cleaned. Spare parts should be arranged in a tidy way after installation.
D. SITE CLEANING
No Check Content YES / NO / N/A
2 The rest of materials sent back to warehouse and inform person in charge. N/A
Revision number: 00
Date of issue: January, 16th , 2018 3 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
E. HARDWARE STATUS CHECK
Objective
Verify the power-on state of BBU and eNodeB’s Boards.
Verify the boards are running well through the visual check.
Prerequisites
Cabinet is power on.
Procedure Expected result
1. Status check of Board. All board status displayed in the returned result is
Query all the board status through “Enable”.
DSP BRD: CN=MASTER;
YES
Observations/ Remarks:
Revision number: 00
Date of issue: January, 16th , 2018 4 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
F. COMMISSIONING AND CONFIGURATION TEST
To do the following tests the LMT software must be running with the username “admin” and password “ENodeB”
eNODEB TEST EXPECTED RESULT MEASUREMENT
It must verify that all cells are
1. Verify the cells status. To do this, execute the available:
next command.
LST CELL;
DSP CELL;
Observations/ Remarks:
Revision number: 00
Date of issue: January, 16th , 2018 5 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
G. eNodeB LICENSE:
To query the ENodeB License configuration before and after execute the following command:
DSP LICINFO:; (Before)
MML result
Revision number: 00
Date of issue: January, 16th , 2018 6 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
H. ALARM QUERY
To do the following tests the LMT software must be running with the username “admin” and password “ENodeB”
ALARM QUERY EXPECTED RESULT MEASUREMENT
Query active alarms through related MML The returned result indicated the
commands. system didn’t report any service
o Query active ENodeB alarms through affected alarms.
o LST ALMAF: CNT=64;.
Observations/ Remarks:
Revision number: 00
Date of issue: January, 16th , 2018 7 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
I. CELL INFORMATION
Objective
Query some Information of the cell.
Prerequisites
1. The eNodeB works well after system commissioning.
2. Log in to the eNodeB LMT System.
Procedure
Query the some cell information about the eNodeB
DSP CELL: MODE=ALLCELL;
Revision number: 00
Date of issue: January, 16th , 2018 8 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
J. Service Verification
Objective
Test the service in each cell.
Prerequisites
1. The eNodeB works well after system commissioning.
2. Log in to the eNodeB LMT System.
Procedure
Query the some cell information about the eNodeB
DSP CELL: MODE=ALLCELL;
Revision number: 00
Date of issue: January, 16th , 2018 9 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
K. SITE PHOTO CHECKLIST
□ Front view of Site or Building
□ Front view of Cabinet (2G, 3G, and 4G) - door closed
□ Front view of Cabinet (2G, 3G, and 4G) - door open
□ Front view of BBU Box (View off all board that Installed at BBU Box)
□ Front view of RFC Cabinet (View of All Board that Installed at RF Cabinet Before and After)
L. CONCLUSION SUMMARY
Does the inspection indicate that Commissioning can start?
M. FINAL DECISION
□
Revision number: 00
Date of issue: January, 16th , 2018 10 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
Punch list eNodeB ATP
Site ID
Site Name
Severity
Item No
Description Supervisor
Minor
Major
Revision number: 00
Date of issue: January, 16th , 2018 11 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
* Only fill Punch list that related to Wireless Equipment (eNodeB)
** Date when deficiency cleared
Performed by:
Approved by:
Hutchison 3 Indonesia
Name : .....................................
Date : .......................................
Revision number: 00
Date of issue: January, 16th , 2018 12 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
Photo Attachment
Revision number: 00
Date of issue: January, 16th , 2018 13 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
3. Front View of Cabinet (2G & 3G & 4G) – Door Opened
4. Front view of BBU Box (View off all board that Installed at BBU Box)
Revision number: 00
Date of issue: January, 16th , 2018 14 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
5. Front view of RFC Cabinet (View of All Board that Installed at RF Cabinet)
Revision number: 00
Date of issue: January, 16th , 2018 15 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release