You are on page 1of 15

LTE MIMO Upgrade

Mobile Communication System


eNodeB BTS3900A/BTS3900/DBS3900

H3I Project eNodeB MIMO Upgrade


Acceptance Test Report

REMARKS:
The attached signatures certificate that the eNodeB has been accepted according with the describe tests in this document.

Revision number: 00
Date of issue: January, 16th , 2018 1 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
A. eNodeB SITE INFORMATION
Site ID : 104138LU1
Site Name : Kayumanis Cibinong
Site Address :
Jl. Raya Kayu Manis RT. 02 RW. 03 Kel. Cirimekar Kec. Cibinong Kab. Bogor

MME Name : MENARA MULIA


Scenario : 1.1A
Configuration : SIMO TO MIMO
Subcontractor Company : PT PMT
Subcontractor Supervisor : Iwa Setiawan
Mobile Number : 0896 3936 5554
Date of Upgrade : 2018-11-20
Date of Acceptance : 2018-11-20
Type of Site : Greenfield
Type of ENodeB : BTS3900A
Existing 4G RF Module :
MIMO Module Solution : Cascading MRFU/Add New MRFU

B. Additional Equipment and License for MIMO Upgrade


B.1 Additional Hardware 21023192314MC2083946,21023192314
MB1024087,21023192314MC2083962,2
Hardware on Main Rack Quantity 1023185476TC2004269,2102310KBL10E
Serial Number Source** Remark
B000232,21023185476TC2003762,
2102310KBL10EB001276,21023185476T Ok
1. MRFU (4G) 6 Ok
C2003494,2102310KBL10EA000680
2. RRU………. (4G) 6 21023192314MC2083946,21023192314 Ok Ok
3. MRFUd (4G) MB1024087,21023192314MC2083962,2
1023185476TC2004269,2102310KBL10E
4. RFC Cabinet Ver…. B000232,21023185476TC2003762,21023
5. RF Cross Cable 10KBL10EB001276,21023185476TC2003
494,2102310KBL10EA000680
6. Installation Material &
Auxiliary
7. PSU 50A
8. PSU 30A
9. Battery ……Ah
10. RRC Connected User
11. Basic Feature and
Optional Feature as
Basic Phase 2

12. Basic Feature and


Optional Feature as
Basic Phase 3- CA
* Fill only equipment that installed for eNodeB MIMO Upgrade
** Fill with from “H3I Warehouse” (Re-use) or “New Purchase” from Huawei

Revision number: 00
Date of issue: January, 16th , 2018 2 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
B.2 Dismantle Hardware (if any)

Hardware on Main Rack Quantity Serial Number Remark

1. MRFU (4G)
2. RRU………. (4G)
3. …………………
* Fill only equipment that dismantle for eNodeB MIMO Upgrade

C. HARDWARE INSTALLATION CHECK ITEMS


C.1 Installation of Equipment
No Check Content YES / NO / N/A

1 Cables should be tiled with uniform spacing and moderate tightness. Cable ties should YES
be tied in a tidy way.

2 The board can be plugged and unplugged smoothly. Its panel screws should have YES
appropriate tightness if they exist.

C.2 Others
No Check Content YES / NO / N/A

1 The installation tools accord with the antistatic requirements. YES

2 Check that all installation and packing materials have been removed from the site YES

3 The equipment room should be neatness and tidy. Discarded packing materials should YES
be cleaned. Spare parts should be arranged in a tidy way after installation.

D. SITE CLEANING
No Check Content YES / NO / N/A

1 All rubbish in area Installation cleaned. YES

2 The rest of materials sent back to warehouse and inform person in charge. N/A

3 The site area/container keys should be available and secure. YES

Revision number: 00
Date of issue: January, 16th , 2018 3 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
E. HARDWARE STATUS CHECK
Objective
Verify the power-on state of BBU and eNodeB’s Boards.
Verify the boards are running well through the visual check.
Prerequisites
Cabinet is power on.
Procedure Expected result
1. Status check of Board. All board status displayed in the returned result is
Query all the board status through “Enable”.
DSP BRD: CN=MASTER;
YES
Observations/ Remarks:

Revision number: 00
Date of issue: January, 16th , 2018 4 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
F. COMMISSIONING AND CONFIGURATION TEST
To do the following tests the LMT software must be running with the username “admin” and password “ENodeB”
eNODEB TEST EXPECTED RESULT MEASUREMENT
It must verify that all cells are
1. Verify the cells status. To do this, execute the available:
next command.
LST CELL;
DSP CELL;

Observations/ Remarks:

Revision number: 00
Date of issue: January, 16th , 2018 5 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
G. eNodeB LICENSE:
To query the ENodeB License configuration before and after execute the following command:
DSP LICINFO:; (Before)
MML result

*License configuration should follow the SDB

DSP LICINFO:; (After)


MML result

Revision number: 00
Date of issue: January, 16th , 2018 6 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
H. ALARM QUERY
To do the following tests the LMT software must be running with the username “admin” and password “ENodeB”
ALARM QUERY EXPECTED RESULT MEASUREMENT
Query active alarms through related MML The returned result indicated the
commands. system didn’t report any service
o Query active ENodeB alarms through affected alarms.
o LST ALMAF: CNT=64;.

Observations/ Remarks:

Revision number: 00
Date of issue: January, 16th , 2018 7 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
I. CELL INFORMATION
Objective
Query some Information of the cell.
Prerequisites
1. The eNodeB works well after system commissioning.
2. Log in to the eNodeB LMT System.

Procedure
Query the some cell information about the eNodeB
DSP CELL: MODE=ALLCELL;

Cell 0 Cell 1 Cell 2 Cell 3 Cell 4 Cell 5


Cell ID
UL Frequency
DL Frequency
Root Sequence Index
Max Transmission Power (0.1dBm)
Observations/ Remarks:

Revision number: 00
Date of issue: January, 16th , 2018 8 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
J. Service Verification
Objective
Test the service in each cell.
Prerequisites
1. The eNodeB works well after system commissioning.
2. Log in to the eNodeB LMT System.

Procedure
Query the some cell information about the eNodeB
DSP CELL: MODE=ALLCELL;

Sector 0 Sector 1 Sector 2


CSFB Voice- Originated Call
CSFB Voice- Terminated Call
PS Call (Background and Interactive)
SMS
Observations/ Remarks:

Revision number: 00
Date of issue: January, 16th , 2018 9 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
K. SITE PHOTO CHECKLIST
□ Front view of Site or Building
□ Front view of Cabinet (2G, 3G, and 4G) - door closed
□ Front view of Cabinet (2G, 3G, and 4G) - door open
□ Front view of BBU Box (View off all board that Installed at BBU Box)
□ Front view of RFC Cabinet (View of All Board that Installed at RF Cabinet Before and After)

L. CONCLUSION SUMMARY
Does the inspection indicate that Commissioning can start?

M. FINAL DECISION

Revision number: 00
Date of issue: January, 16th , 2018 10 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
Punch list eNodeB ATP
Site ID
Site Name

Severity
Item No

Date to be Responsible Data


Cosmetic

Description Supervisor
Minor
Major

cleared Group* Cleared**

Revision number: 00
Date of issue: January, 16th , 2018 11 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
* Only fill Punch list that related to Wireless Equipment (eNodeB)
** Date when deficiency cleared

Subcontractor PT.Huawei Tech Investment Managed Services

Name : ..................................... Name : ..................................... Name : .....................................


Date : ....................................... Date : ....................................... Date : .......................................

Performed by:

Subcontractor PT.Huawei Tech Investment Managed Services

Name : ..................................... Name : ..................................... Name : .....................................


Date : ....................................... Date : ....................................... Date : .......................................

Approved by:

PT.Huawei Tech Investment Managed Services

Name : ..................................... Name : .....................................


Date : ....................................... Date : .......................................

Hutchison 3 Indonesia

Name : .....................................
Date : .......................................

Revision number: 00
Date of issue: January, 16th , 2018 12 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
Photo Attachment

1. Front View of Site or Building

2. Front View of Cabinet (2G & 3G & 4G) – Door Closed

Revision number: 00
Date of issue: January, 16th , 2018 13 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
3. Front View of Cabinet (2G & 3G & 4G) – Door Opened

4. Front view of BBU Box (View off all board that Installed at BBU Box)

Revision number: 00
Date of issue: January, 16th , 2018 14 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release
5. Front view of RFC Cabinet (View of All Board that Installed at RF Cabinet)

Revision number: 00
Date of issue: January, 16th , 2018 15 of 15
Document Title: ATP for eNodeB MIMO Upgrade
Release status: release