Table 1 – Loads and Dimensions for Tubes and Fittings Scaffold
Type of Use of Scaffold Maximum Maximum Typical load
scaffold scaffold loading per number of spacing examples per m2 working between bay platforms standards Very light duty Inspection 75 kg. 1 working 2.7 m. 1 man+ tool. independent access and platform No materials Very light duty painting independent Power cleaning, 150 kg. 2 working 2.4 m. 2 men+ tool. painting, light platform No materials General engineering purpose Light independent engineering, 200 kg. 2 working 2.1 m. 2 men+175kg.of e.g. welding or platforms+ materials Heavy duty electrical 1at very light independent Heavy duty 2.0 m. 2 men+250kg.of engineering, e.g. 250 kg. 2 working materials large pipe work platforms+ of structual 1at very light duty