TRAINING ACTIVITY MATRIX


Plumbing NC II

Prepared by: Approved by:

Jonathan D. Caporas Mary Faith C. Pongos


Trainer Administrator
OSPA Training Center
Carlota Hills, Can-adieng, Ormoc City
Tel.No. (053) 561-9408, 255-7264
Ospa_trngcenter@yahoo.com

TRAINING ACTIVITY MATRIX - ( Plumbing NC II )

FACILITIES TOOLS
TRAINING TRAINEE & VENUE DATE & REMARKS
TIME
ACTIVITIES EQUIPMENT
WORKSTATION AREA
-PRELIMINARIES  Power point
1. Prayer Presentation
2. Attendance ALL TRAINEES  Computer
 Projector
3. Orientation on school policies
 Workshop Layout
4. Orientation on CBT Delivery and  TR/CBC
different components  CBLM LECTURE
 Attendance Sheet ROOM
 Pen & Paper
 Data Gathering
Sheet
 Pre-test
1. PREPARE ESTIMATION OF MATERIALS FOR MULTIPLE PLUMBING UNITS
-STUDY APPROVED PLUMBING PLAN
 All measurements in the plans  Plumbing Blue
are determined in accordance Print Work Shop
with job requirements with job ALL TRAINEES  Plumbing plan Area
requirements and details.  Structural plan
 Plumbing legends, symbols and  Architectural plan
abbreviations are identified and  Site development
interpreted in accordance with plan
job requirements.  Mechanical plan
 Electrical plan
 Specification of materials are  Plumbing Legend,
identified in the plan according Symbols and
to the job requirements. abbreviation.
 Plumbing layout is  Floor plan
determined/visualized based on  Schematic
isometric drawing, schematic diagram of (DWV)
water line
diagram and details.
 When necessary, cost of
materials are estimated based
on the current market price.
- ESTIMATE & FINALIZE MATERIALS
TAKE-OFF
 Materials are estimated in  Plumbing Blue
accordance with the job Print
requirements.  Plumbing plan
 Materials and consumables are  Structural plan Work Shop
quantified and listed in ALL TRAINEES  Architectural plan Area
accordance with the job  Site development
requirements. plan
 All results are summarized for  Mechanical plan
submission in accordance with  Electrical plan
job requirements.  Plumbing Legend,
 Bill of materials and cost Symbols and
abbreviation.
estimate is presented to client /
 Floor plan
supervisor for approval.
 Schematic
diagram of (DWV)
water line
2. PERFORM MULTIPLE PLUMBING UNITS INSTALLATION AND ASSEMBLIES
- PREPARE MATERIALS FOR  Steel tape
DRAINAGE, SANITARY, VENT AND  Ballpeen hammer
WATERLINE LAYOUT WORK  Hacksaw w/ blade
 Work instructions/ plans are  Blow torch
read and interpreted in  Pointed steel
chisel
accordance with the job  Manual pipe Work Shop
requirements. Threader ( ¼’’ – 2’’ Area
 Materials, tools, and ALL TRAINEES )
equipment are selected and  Pipe wrench ( 10’’,
12’’, 14’’, 18’’, 24’’)
prepared according to job
 Pipe vise
requirements.
 Bar/hose level
 Appropriate PPE are selected
 Plumb bob
according to job requirements.  Pipe cutter
 Pipe reamer
 Threading
machine
 Welding Machine
 Test pump (
manual / power
driven)
 Electric grinder
 Fushion machine
 Grooving machine
 Pliers
 Wrenches ( open,
box, combination,
adjustable, socket,
allen)
- INSTALL PIPES & FITTINGS FOR
DRAINAGE, SANITARY, VENT AND  Steel tape
WATERLINE LAYOUT.  Ballpeen hammer
 Pipes and fittings are installed  Hacksaw w/ blade
as indicated in the approved  Blow torch
Work Shop
working plan. ALL TRAINEES  Pointed steel
chisel Area
 Pipe supports and braces are
installed in accordance with the  Manual pipe
Threader ( ¼’’ – 2’’
approved working plan.
)
 Correct use of materials, tools  Pipe wrench ( 10’’,
and equipment is observed in 12’’, 14’’, 18’’, 24’’)
accordance with manufacturer’s  Pipe vise
instruction manual.  Bar/hose level
 Appropriate PPE is used in  Plumb bob
accordance with the job  Pipe cutter
requirements.  Pipe reamer
 Threading
machine
 Welding Machine
 Test pump (
manual / power
driven)
 Electric grinder
 Fushion machine
 Grooving machine
 Pliers
 Wrenches ( open,
box, combination,
adjustable, socket,
allen)

- INSTALL COLD WATER SYSTEM


AND MULTI-POINT WATER HEATER  Steel tape
FOR HOT-WATER SUPPLY LINES  Ballpeen hammer
 Specifications of materials for  Hacksaw w/ blade Work Shop
hot and cold water piping used ALL TRAINEES  Blow torch
 Pointed steel
Area
according to the approved plan.
 Hot and cold water supply is chisel
installed according to the  Manual pipe
Threader ( ¼’’ – 2’’
approved plan.
)
 Water supply pipe assembled  Pipe wrench ( 10’’,
and installed is leak free. 12’’, 14’’, 18’’, 24’’)
 Proper use of tools and  Pipe vise
equipment is observed in  Bar/hose level
accordance with manufacturer’s  Plumb bob
instruction manual.  Pipe cutter
 Pipe reamer
 Threading
machine
 Welding Machine
 Test pump (
manual / power
driven)
 Electric grinder
 Fushion machine
 Grooving machine
 Pliers
 Wrenches ( open,
box, combination,
adjustable, socket,
allen)
- INSTALL BUILDING DRAINS,  Steel tape
SEWER AND VENTILLATION  Ballpeen hammer
 Building drains/sewer and  Hacksaw w/ blade
ventilation are installed in  Blow torch
Work Shop
accordance to the approved ALL TRAINEES  Pointed steel
chisel Area
plan.
 Manual pipe
 Materials, tools and equipment
Threader ( ¼’’ – 2’’
are selected and prepared )
according to the job  Pipe wrench ( 10’’,
requirements. 12’’, 14’’, 18’’, 24’’)
 Appropriate PPE are selected  Pipe vise
and used according to the job  Bar/hose level
requirements.  Plumb bob
 Pipe cutter
 Pipe reamer
 Threading
machine
 Welding Machine
 Test pump (
manual / power
driven)
 Electric grinder
 Fushion machine
 Grooving machine
 Pliers
 Wrenches ( open,
box, combination,
adjustable, socket,
allen)
- MOUNT AND LAY OUT PLUMBING  Steel tape
FIXTURES AND ACCESSORIES  Ballpeen hammer
 Specifications of plumbing  Hacksaw w/ blade
fixtures are used in accordance  Blow torch
with the job requirements.  Pointed steel
chisel
 Plumbing fixtures and Work Shop
ALL TRAINEES  Manual pipe
accessories are installed
Threader ( ¼’’ – 2’’ Area
according to specified roughing- )
in measurements and / or  Pipe wrench ( 10’’,
manufacturer’s instruction 12’’, 14’’, 18’’, 24’’)
manual.  Pipe vise
 Plumbing fixture and  Bar/hose level
accessories are rigidly secured  Plumb bob
with strict adherence to  Pipe cutter
perpendicularity and levelness.  Pipe reamer
 Usage of tools and equipment is  Threading
observed in accordance with machine
manufacturer’s specifications.  Welding Machine
 Appropriate PPE are used in  Test pump (
manual / power
accordance with the job
driven)
requirements.
 Electric grinder
 Work site is cleaned and kept in  Fushion machine
safe state and in accordance  Grooving machine
with Occupational Safety and  Pliers
Health Standards (OSHS)  Wrenches ( open,
box, combination,
adjustable, socket,
allen)
3. CONDUCT PIPE LEAK TESTING
- PREPARE FOR CONDUCTING PIPE  Pipe wrench
LEAK TESTING  Pipe threader
 Work instructions are read and  Pipe cutter
interpreted in accordance with  Manual test pump
the job requirements.  Blow torch
 Steel tape Work Shop
 Materials, tools and equipment ALL TRAINEES
 Adjustable wrench Area
are selected and prepared in
 Ballpeen hammer
accordance with job
 Cold chisel
requirements.
 Hacksaw with
 All openings in the pipe system blade
are tightly closed except the  Set of allen
highest opening. wrench
 Appropriate PPE are selected in  Screw driver
accordance with job  Mechanical plier
requirements.  Vise grip
 Ladder/scaffolding
 Pressure gauge
- PERFORM PIPE LEAK TESTING  Pipe wrench
 All openings in the pipe system  Pipe threader
are tightly closed except the  Pipe cutter
highest opening prior to leak  Manual test pump
opening prior to leak testing.  Blow torch
 Steel tape Work Shop
 Leak testing is applied after ALL TRAINEES
 Adjustable wrench Area
completion of roughing-ins and
 Ballpeen hammer
complete installation of pipe
 Cold chisel
supports.
 Hacksaw with
 Testing apparatus is set to blade
specified pressure rating  Set of allen
according to testing standards. wrench
 Screw driver
 Mechanical plier
 Gravity or flood testing are  Vise grip
applied to sanitary, waste, vent  Ladder/scaffolding
and storm drainage piping. Pressure gauge
 Pressure testing are applied to
hot and cold water piping.
 Correct usage of tools and
equipment is observed in
accordance with manufacturer’s
specifications.
 Appropriate PPE are used in
accordance with job
requirements.
 Work site is cleaned and kept in
safe state and in safe state and
in accordance with OSHS.
4. PERFORM PLUMBING REPAIR AND MAINTENANCE WORK
- REPAIR DEFECTIVE PIPES,
FITTINGS AND PLUMBING FIXTURES  Pipe wrench
 Defective pipes, fittings and  Pipe threader
plumbing fixtures are identified,
 Pipe cutter
disconnected and replaced with
the same model and in line with  Manual /
electric test Work Shop
its original working condition. ALL TRAINEES
pump Area
 Replacements are checked and
re-tested to ensure they are free  Hand drain
from defects and in accordance cleaner
with standard specification or as  Blow torch
required.  Steel tape
 Joints are tightly secured and  Adjustable
leak free in accordance with the
wrench
job requirements.
 Damaged areas are restored or
 Ballpeen
repaired in line with its original hammer
working condition.  Cold chisel
 Correct usage of tools,  Hacksaw with
equipment and consumables are blade
observed in accordance with job  Basin wrench
requirements.  Screw driver (
Philip / flat)
 Appropriate PPE are used in
 Mechanical plier
accordance with job
 Vise grip
requirements.
 Teflon tapes
 Rags
 Solvent cement
- CLEAR CLOGGED PIPES AND
DRAINS  Hacksaw with
 Clogged pipes and drains are blade
precisely identified in reference  Basin wrench
Work Shop
with the as-built plan. ALL TRAINEES  Screw driver (
Philip / flat) Area
 Clogged pipes and drains are
cleared using appropriate tools,  Mechanical plier
 Vise grip
equipment and methodology.
 Teflon tapes
 Pipes and drain are cleared and
 Rags
provided with screen in line with  Solvent cement
original working condition.
 Appropriate PPE are used in
accordance with the job
requirements.