Professional Documents
Culture Documents
SBM Sprinker Water Based123
SBM Sprinker Water Based123
Dollera
February 4 2020
(Date submitted for
Assessment)
I, the undersigned declare that I am the author of this work, and that any content
from other sources has been acknowledged and fully cited.
LAKAMPUENGA, JERICHO G.
GIRONELLA, RANDY
SIGNATURE OF STUDENT
To help us with our planning, please estimate here how long 48 hours 45 minutes you spent on this
assignment.
Assessor’s comments:
Assessor: Mark of Assessment:
____/___
Date of Assessment:
WATER BASED FIRE PROTECTION SYSTEM FOR
SCHOOL OF BUSINESS AND MANAGEMENT BUILDING
Calculation Parameters:
(Taken from: GAPS Guidelines, Sprinkler System Hydraulics, pg. 8-9)
1. Designed Sprinkler Spacing: 3m 10. Dynamic Viscosity of water: 0.0083
2. Number of Sprinklers: Pa-s
a. 1st Floor: 34N 11. Surface Roughness of Steel Pipe:
b. 2nd Floor: 60 4.6 x 10-5
c. 3rd Floor: 80 12. Specific Weight of water: 9.81
d. 4th Floor: 63 KN/m3
e. 5th Floor: 63 13. Min. Residual Pressure at the
f. 6th Floor: 59 farthest Sprinkler:
3. Classification of Occupancy: Light 𝑄2
a. 𝑃 = (𝐾2 ) = 0.5 bar or 7.265 psi
Hazard
4. Number of Storey: 6 14. System Balancing Equation:
5. Estimated Floor Area of Sprinkler a. Conventional Method
Operation: 139m2 𝑄𝑐𝑎𝑙
6. Designed coverage per Sprinkler 𝐾𝑛𝑒𝑤 =
√𝑃𝑐𝑎𝑙
Head: 11.52m2
7. Density: 0.1 gpm/ft2 or 4.074
L/min/m2 𝑄𝑛𝑒𝑤 = 𝐾𝑛𝑒𝑤 × √𝑃𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑
8. Desired Flow Rate per Sprinkler:
57.1 L/min b. Simple Proportion
𝑄𝑛𝑒𝑤 √𝑃𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑
9. Sprinkler K – factor: 5.6 or (80.7 @ =
SI units) 𝑄𝑐𝑎𝑙 √𝑃𝑐𝑎𝑙
APRROXIMATE OCCUPANCY OF AREA PER ROOM
Table 1; Approximate Occupancy of Area per Room
Floor Area Occupancy A3 - 1 45
A1 - 1 40 A3 - 2 45
A1 - 2 40 A3 - 3 45
A1 - 3 40 A3 - 4 45
3
1 A1 - 4 40 A3 - 5 45
A1 - 5 40 A3 - 6 45
A1 - 6 40 A3 - 7 3
A1 - 7 40 A3 - 8 3
A2 - 1 10 A4 - 1 45
A2 - 2 10 A4 - 2 45
A2 - 3 1 A4 - 3 45
A2 - 4 1 4 A4 - 4 45
A2 - 5 1 A4 - 5 45
A2 - 6 1 A4 - 6 45
A2 - 7 2 A4 - 7 45
A2 - 8 1 A5 - 1 45
A2 - 9 1 A5 - 2 45
A2 - 10 1 A5 - 3 45
2 A2 - 11 2 5 A5 - 4 45
A2 - 12 1 A5 - 5 45
A2 - 13 1 A5 - 6 45
A2 - 14 1 A5 - 7 45
A2 - 15 1 A6 - 1 45
A2 - 16 1 A6 - 2 2
A2 - 17 30 A6 - 3 2
A2 - 18 1 6 A6 - 4 45
A2 - 19 1 A6 - 5 45
A2 - 20 1 A6 - 6 20
A2 - 21 40 A6 - 7 2
TOTAL 1456
The total approximation for the occupancy of the building has 1,456 people.
The assumption made, is that all the zoned areas are being occupied by the number
indicated at the table.
Location and Size of blind spaces
All the sprinklers in the system are the same; therefore the sprinkler heads
have the same temperature ratings of 155°F (68°C) This has low-profile yet durable
design, utilizing a frangible 5mm glass ampule as the thermosensitive element. This actuating
assembly is hermetically sealed, containing a precise amount of fluid. When heat is absorbed,
this fluid expands, shattering the glass at the prescribed temperature and discharging the water
in an approved pattern depending upon deflector style.
HANGERS
Pipe hanger and pipe clamp, known as pipe support, are designed to transfer the
load from a pipe to the supporting structures. The main functions of the pipe hanger
and clamp are to anchor, absorb shock, and support a specified load of pipeline
FIRE HOSE SET
Figure 8 FDC
Figure 8
1
A. The FDC connection shall consists of 2 2 in. (65 mm) connections using
NH internal threaded swivel fitting(s) with “2.5 – 7.5 NH standard thread”.
(Specified in NFPA 1963; NFPA 13 Handbook pg. 169)
SPECIFICATIONS OF GENERATOR
Figure 12 Generator
Power:150kw
Engine: 6CTA8.3-G2
Alternator: Hengsheng HSJ 274G
Digital Controller:ComAp MRS10
Silent canopy with 8 hours base fuel tank
Equipped with 50℃ Radiator;
Equipped with 24V DC Start motor;
Equipped with vibration Isolators between the engine/alternator and base frame;
Equipped with high performance maintenance-free lead-acid starting
batteries,battery charger and battery switch;
Equipped with industrial silencer and flexible exhaust hose;
Equipped with high performance MCCB circuit breaker;
Designed to Comply with ISO9001&CE;
GENSET POWER
Voltage Hz Phase Power Factor Current Power Power
415V 50HZ 3 0.8 260A 187.5kva 150kw
ENGINE DATA
Manufacturer/Model 6CTA8.3-G2
No. Of Cylinder 6 Cylinders
Cylinder Arrangement L Type
Cycle 4 Stroke
Aspiration Turbocharged , Aftercooled
Combustion System Direct Injection
Bore×Stroke 114x135mm
Displacement 8.3L
Speed Governor Electrical
Cooling System Forced water cooling cycle
Steady speed droop ≤1%
Starter Motor DC24V
FUEL SYSTEM
Fuel Type Diesel
Fuel Consumption at 100% Load 207g/kw.h
LUBE OIL SYSTEM
Total lubrication system capacity 24 L
Lube Oil Type CD15W Class and Above
ALTERNATOR DATA
Manufacturer / Model HSJ 274G
Power 150KW
Frequency/speed 50HZ/1500rpm
Exciter type Single bearing, Brushless, Self-excited
Power factor 0.8
Voltage adjust range ≥5%
Insulation Grade H
Pole No. 4
Protection Grade IP22
Phase / wire 3 phase 4 wires
BILL OF MATERIALS
Bill of Materials
Materials/Components Price (Php) No. of Cost (Php)
Components
Alarm Bell 2,400.00 12 28,800.00
Alarm Valve 6,930.00 1 6,930.00
Elbow 300 359 107,700.00
Fire hose Set 6,200.00 6 37,200.00
Fire Pump 202,882.00 1 202,882.00
Generator 608,646.00 1 608,646.00
Jockey Pump 101,441.00 1 101,441.00
Pipe 1 inch 170 1680 285,600.00
Pipe 3 inch 760 468 355,680.00
Pipe 4 inch 1,200.00 94 112,800.00
Tee 350 300 105,000.00
Water flow Detector 5,800.00 6 348,00.00
Total Cost 1,958,679.00
Minimum Pressure:
𝑃 = 𝑄2 ÷ 𝐾 2
𝑃 = (47.05)2 ÷ (80.7)2
𝑃 = 0.34 𝑏𝑎𝑟 = 4.9 𝑝𝑠𝑖
Since NFPA recommends that the remotest sprinkler should operate at P ≥ 7 psi.
And P calculated is 4.9 psi; therefore, the remotest sprinkler should be adjusted to 7
psi.
Hazen-Williams Equation:
6.06 𝑥 105 𝑥 (𝑄)1.85
𝐹𝑝 =
(𝐶)1.85 𝑥 (𝑑)4.87
Pipe Friction Loss:
𝑃𝑓 = 𝐹𝑝 × 𝐿
Pipe Friction Loss (Elbow / Tee):
𝑃𝑓 = 𝐹𝑝 × 𝐿𝑒𝑞
Remote Figure:
1
2
3
A
Sprinkler 1 to 2:
6.06 𝑥 105 𝑥 (57.05)1.85
𝐹𝑝 = = . 022 𝑏𝑎𝑟/𝑚
(120)1.85 𝑥 (25.4)4.87
𝑃𝑓 = 0.217 𝑏𝑎𝑟/𝑚 × 3𝑚 = . 0662 𝑏𝑎𝑟
Sprinkler 2:
𝑄 = 𝐾𝑓𝑎𝑐𝑡𝑜𝑟 × √𝑃𝑡𝑜𝑡𝑎𝑙𝑄 = 60.76 𝐿/𝑚𝑖𝑛
𝑄𝑡𝑜𝑡𝑎𝑙 = 𝑄1 + 𝑄2 = 117.856 𝐿/𝑚𝑖𝑛
Sprinkler 2 to Tee:
6.06 𝑥 105 𝑥 (117.856)1.85
𝐹𝑝 = = . 084 𝑏𝑎𝑟/𝑚
(120)1.85 𝑥 (25.4)4.87
𝑃𝑓 = 0.084 𝑏𝑎𝑟/𝑚 × 2.61𝑚 = . 22 𝑏𝑎𝑟
𝑃𝑡𝑜𝑡𝑎𝑙 = 0.567 𝑏𝑎𝑟 + 0.22 𝑏𝑎𝑟 = . 787 bar
Tee:
6.06 𝑥 105 𝑥 (117.856)1.85 bar
𝐹𝑝 = = . 084
(120)1.85 𝑥 (25.4)4.87 m
𝑃𝑓 = 0.084 𝑏𝑎𝑟/𝑚 × 1.52𝑚 = . 128 𝑏𝑎𝑟
𝑄𝑛𝑒𝑤 √𝑃𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑
=
𝑄𝑐𝑎𝑙𝑐 √𝑃𝑐𝑎𝑙𝑐
Hose Allowance
Since NFPA states that a total water allowance of 50gpm (190 L/min) for a
single hose connection installation shall be added to the sprinkler requirements.
Therefore:
TANK DIMENSION
Tank Volume = 970.87 L/min x 30 mins
Tank Volume = 29,126.17 L or 29.1262 cubic meter
Tank Actual Capacity = 29.1262 cubic meter + ((29.1262 cubic meter) x (1/4))
Tank Actual Capacity = 36.4 cubic meter
Tank Height = 7 meters
36.4 𝑐𝑢𝑏𝑖𝑐 𝑚𝑒𝑡𝑒𝑟
Tank Base = √ 7 𝑚𝑒𝑡𝑒𝑟𝑠
Tank Base = 2.3 m
Tank Dimension = 2.3 m x 2.3 m x 7 m
FIRE PUMP FOUNDATION
a. Weight of foundation
𝑊𝑓 = 𝑊𝑒 × (0.11) × √𝑅𝑃𝑀
Where: 𝑊𝑒 = 𝑤𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑒𝑛𝑔𝑖𝑛𝑒
𝑊𝑓 = 𝑤𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛
𝑊𝑓 = (362 𝑘𝑔) × (0.11) × √1470 𝑟𝑝𝑚
𝑊𝑓 = 1527 𝑘𝑔
b. Area of foundation
If steel base is 2.7 m x 1.2 m, assume an extension of 1m on all sides,
therefore dimension will be 2.7 m x 1.2 m:
𝐴𝑟𝑒𝑎 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = (2.7 𝑚) × (1.2 𝑚)
𝐴𝑟𝑒𝑎 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = 3.24 𝑚2
c. Depth of foundation
𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = (3.22 × 4.2) × (𝐶𝑎𝑙𝑖𝑏𝑒𝑟 𝑆𝑡𝑟𝑜𝑘𝑒); 𝑃ℎ𝑖𝑙. 𝑀𝑒𝑐ℎ𝑎𝑛𝑖𝑐𝑎𝑙 𝐶𝑜𝑑𝑒
𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = (13.524) × (0.025)
𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = 0.34 𝑚
JOCKEY PUMP FOUNDATION
a. Weight of foundation
𝑊𝑓 = 𝑊𝑒 × (0.11) × √𝑅𝑃𝑀
Where: 𝑊𝑒 = 𝑤𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑒𝑛𝑔𝑖𝑛𝑒
𝑊𝑓 = 𝑤𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛
𝑊𝑓 = (35 𝑘𝑔) × (0.11) × √2900 𝑟𝑝𝑚
𝑊𝑓 = 207 𝑘𝑔
b. Area of foundation
If steel base is 1.5 m x 0.5 m, assume an extension of 1m on all sides,
therefore dimension will be 1.5 m x 0.5 m:
𝐴𝑟𝑒𝑎 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = (1.5 𝑚) × (0.5 𝑚)
𝐴𝑟𝑒𝑎 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = 0.75 𝑚2
c. Depth of foundation
𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = (3.22 × 4.2) × (𝐶𝑎𝑙𝑖𝑏𝑒𝑟 𝑆𝑡𝑟𝑜𝑘𝑒); 𝑃ℎ𝑖𝑙. 𝑀𝑒𝑐ℎ𝑎𝑛𝑖𝑐𝑎𝑙 𝐶𝑜𝑑𝑒
𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = (13.524) × (0.005)
𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = 0.07 𝑚
GENERATOR FOUNDATION
a. Weight of foundation
𝑊𝑓 = 𝑊𝑒 × (0.11) × √𝑅𝑃𝑀
Where: 𝑊𝑒 = 𝑤𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑒𝑛𝑔𝑖𝑛𝑒
𝑊𝑓 = 𝑤𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛
𝑊𝑓 = (997 𝑘𝑔) × (0.11) × √1800 𝑟𝑝𝑚
𝑊𝑓 = 4653 𝑘𝑔
b. Area of foundation
If steel base is 2.42 m x 0.89 m, assume an extension of 1m on all sides,
therefore dimension will be 2.42 m x 0.89 m:
𝐴𝑟𝑒𝑎 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = (2.42 𝑚) × (0.89 𝑚)
𝐴𝑟𝑒𝑎 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = 2.15 𝑚2
c. Depth of foundation
𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = (3.22 × 4.2) × (𝐶𝑎𝑙𝑖𝑏𝑒𝑟 𝑆𝑡𝑟𝑜𝑘𝑒); 𝑃ℎ𝑖𝑙. 𝑀𝑒𝑐ℎ𝑎𝑛𝑖𝑐𝑎𝑙 𝐶𝑜𝑑𝑒
𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = (13.524) × (0.005)
𝐷𝑒𝑝𝑡ℎ 𝑜𝑓 𝑓𝑜𝑢𝑛𝑑𝑎𝑡𝑖𝑜𝑛 = 0.07 𝑚