c aw ‘ronmental Protection ‘Agency
Dispatch No:_220. 72
Time:
As per Rule 35 of AJK-PPRA Rules, 2017
me of Procuring Agency: AJK Environmental Protection Agency
2. Method of Procurement: Single Stage—one Envelope bidding procedure
3. Title of Procurement: ‘ing of AJK Environmental Protection Act, 2000
Law Manual)
4. Tender Inquiry No. ice 459 dated 019
5. AJK PPRA Ref. No: e459 dated 20-05-2019
6. Date & Time of Bid Opening:
7. Date & Time of Bid Closing:
8. No. of Bids Received:
9. Criteria for Bid Evaluation: ‘Technical Responsiveness
10. Detail of Bid(s) Evaluation: As mentioned in below table:
Detail of Vendor along with quoted cost
Mis S. Habib Govt. Contractor &
Single colour on 90 gram off set
[sot | Nameotitom | o1y | spesitcation General Order Suppliers Abbottabad.
Unit cost in Total | Bid Security |
| i "PKR cost_ | @2%
j aside Pages:
|
Printing of paper (each booklet may contain |
Environmental 118 pages approximately)
2000 (Law Art Card 260gram, Printing in
manual) 41 colour
Slide bind with hot glue, cet
Lowest Evaluated Bidder:
=> The bid submitted by bidder M/s 8. Habib Govt. Contractor & General Order Suppliers
Abbottabad along with ready reference documents, specimens of demo copy or sample
documents with 04 color printing along with company profile and past performance in the
same field.
=> Mb S. Habib Govt. Contractor & General Order Suppliers Abbottabad is technically
“Responsive” based on fulfillment of all requisites of the procuring agency that enabled
Evaluation Committee declaring the firm a ‘Responsive’ enlisted in advertisement
Tender notice 460 dated 20-05-2019 on AJK PPRA website.
11. Any other additional/supporting information, the procuring agency may like to
share :
= The two bidders i.e. M/s Haider Suleman Builders Govt. Contractor and General Order
‘Suppliers and M/s H.Y Engineering & Construction Company has submitted unsigned
bids without office reference No, date, office and Stamp;
= Moreover both firms i.e. M/s Haider Suleman Builders Govt. Contractor and General
Order Suppliers and M/s H.Y Engineering & Construction Company has filed profile of
ion company with certificate of registration with Pakistan Engineering Council
(PEC) category C-6 and haven’t submitted any demo copy or sample document for readyreference of TEC which showed that the vendors have no experience of printing hence
consider technically ‘Non-Responsive’.
Muhammad Shafiq Abbasi
Deputy Director / Chairman Committee
Muhammad Ali Saleem,
Assistant Director /Member
Ms. Sehrish Munsif Assistant Director /
Member/Secretary Committee
Raja Kashif Aftab, Assistant Director (legal)
Member/Technical
Issuing Authority
hi
Hn
Director General
AJK-EPA