13 1270/TSCCL-MD/008 18-Mar-19 Submission of Quality Assurance Plan (QAP) VP, AFCONS MD, TSCCL 19-Mar-19

Submission of Method statement for construction of


19 1270/TSCCL/MD/014 26-Mar-19 board cast in-situ piles AR, AFCONS MD, TSCCL 27-Mar-19
Carrying out Concrete Design Mix Trials at Ultatech
48 1270/TSCCL-MD-/037 19-Apr-19 RMC - Regarding AR, AFCONS MD, TSCCL 20-Apr-19
Submission of Mix Design M35 Pile Concrete - PMC/DPE/TSC/SC/255/2019 27-May-19
49 1270/TSCCL-MD-/038 19-Apr-19 Regarding. AR, AFCONS MD, TSCCL 22-Apr-19

PMC/DPE/TSC/SC/232/2019, 29-Apr-2019,
53 1270/TSCCL-MD-/041 27-Apr-19 Construction of Permanent Piles AR, AFCONS MD, TSCCL 29-Apr-19 8348/E5/TSCCL/2018/E 30-Apr-2019

PMC/DPE/TSC/SC/255/2019 27-May-19
58 1270/TSCCL/MD/047 30-Apr-19 Use of Fly ash with Cement in Concrete - Regarding AR, AFCONS MD, TSCCL 2-May-19

Submission of Mix Design M35 Pile concrete - PMC/DPE/TSC/SC/237/2019 3-May-19


60 1270/TSCCL-MD-/049 2-May-19 AR, AFCONS MD, TSCCL 2-May-19
Regarding

65 1270/TSCCL-MD-/053 8-May-19 Submission of Method Statement for Plate Load Test AR, AFCONS MD, TSCCL 9-May-19

69 1270/TSCCL-MD-/057 16-May-19 Submission of Plate Load Test reports at P14 of MC03 AR, AFCONS MD, TSCCL 17-May-19
PMC/DPE/TSC/SC/252/2019 18-May-19
71 1270/TSCCL-MD-/059 17-May-19 Usage of Crushed stone sand in Concrete works AR, AFCONS MD, TSCCL 18-May-19
PMC/DPE/TSC/SC/252/2019 18-May-19
75 1270/TSCCL-MD-/063 18-May-19 Usage of Crushed sand AR, AFCONS MD, TSCCL 20-May-19
PMC/DPE/TSC/SC/252/2019 18-May-19
76 1270/TSCCL-MD-/064 18-May-19 Usage of Crushed stone sand AR, AFCONS MD, TSCCL 20-May-19

81 1270-TSCCL-MD-070 24-May-19 Cube Test report of Test Pile No. 2 done using Crushed AR, AFCONS MD, TSCCL 24-May-19
Stone Sand.

85 1270-TSCCL-MD-074 25-May-19 Submission of Method Statement for Initial Pile Load AR, AFCONS MD, TSCCL 27-May-19
Test.

93 1270-TSCCL-MD-082 4-Jun-19 Submission of Method Statement for Lateral Load Test AR, AFCONS MD, TSCCL 4-Jun-19

Carrying of Concrete Mix Design of M50 Grade – PMC-DPE-TSC-SC-269-2019 6-Jun-19


94 1270-TSCCL-MD-083 6-Jun-19 AR, AFCONS MD, TSCCL 6-Jun-19
Regarding
Source approval for Curing Compound Material –
95 1270-TSCCL-MD-084 6-Jun-19 Regarding. AR, AFCONS MD, TSCCL 6-Jun-19

Source approval for Concrete admixture suppliers – PMC-DPE-TSC-SC-266-2019 6-Jun-19


96 1270-TSCCL-MD-085 6-Jun-19 AR, AFCONS MD, TSCCL 6-Jun-19
Regarding.
PMC-DPE-TSC-SC-268-2019 6-Jun-19
97 1270-TSCCL-MD-086 6-Jun-19 Source approval for Cement suppliers – Regarding. AR, AFCONS MD, TSCCL 6-Jun-19
PMC-DPE-TSC-SC-267-2019 6-Jun-19
98 1270-TSCCL-MD-087 6-Jun-19 Source approval for Steel suppliers – Regarding. AR, AFCONS MD, TSCCL 6-Jun-19

105 1270-TSCCL-MD-094 10-Jun-19 Submission of Plate Load Test at P-53 of MC00 stretch. AR, AFCONS MD, TSCCL 10-Jun-19

110 1270-TSCCL-MD-099 11-Jun-19 Submission of Method Statement for Construction of AR, AFCONS MD, TSCCL 11-Jun-19
Pile Caps.

112 1270-TSCCL-MD-101 13-Jun-19 Submission of Test Report for Rectangular Paver and AR, AFCONS MD, TSCCL 13-Jun-19
Kerb stone
Submission of Mix Design M35 Pile Cap Concrete PMC-DPE-TSC-SC-275-C-2019 14-Jun-19
113 1270-TSCCL-MD-102 13-Jun-19 AR, AFCONS MD, TSCCL 14-Jun-19
(Only Cement) - Reg
PMC-DPE-TSC-SC-280-B-2019 17-Jun-19
114 1270-TSCCL-MD-103 13-Jun-19 Submission of Mix Design M35 Pile Concrete - Reg AR, AFCONS MD, TSCCL 14-Jun-19

Submission of Mix Design M35 Pile Cap Concrete PMC-DPE-TSC-SC-280-A-2019 17-Jun-19


115 1270-TSCCL-MD-104 13-Jun-19 AR, AFCONS MD, TSCCL 14-Jun-19
(Cement & Flyash) - Reg

116 1270-TSCCL-MD-105 13-Jun-19 Submission of Method Statement for Pile Integrity test. AR, AFCONS MD, TSCCL 14-Jun-19

124 1270-TSCCL-MD-113 19-Jun-19 Submission of Initial Static Vertical Pile Load Test. AR, AFCONS MD, TSCCL 19-Jun-19

Page 1 of 13
Submitted Reply/Comments From
Sr. No. Ref. No. Dated Subject Issued by Addressed to Date Remarks
on PMC
127 1270-TSCCL-MD-116 24-Jun-19 Submission of Initial Lateral Pile Load Test. AR, AFCONS MD, TSCCL 24-Jun-19
PMC-DPE-TSC-SC-289-2019 29-Jun-19
128 1270-TSCCL-MD-117 28-Jun-19 Submission of Mix Design M50 Grade Concrete - Reg AR, AFCONS MD, TSCCL 29-Jun-19

130 1270-TSCCL-MD-119 1-Jul-19 Submission of Method Statement for Pier and Pier Cap AR, AFCONS MD, TSCCL 1-Jul-19
Construction
Submission of Mix Design M50 Grade Concrete for PMC/DPE/TSC/SC/296-B/2019 3-Jul-19
131 1270-TSCCL-MD-120 1-Jul-19 AR, AFCONS MD, TSCCL 2-Jul-19
Precast Segment - Reg.

134 1270-TSCCL-MD-123 2-Jul-19 Submission of Pile Integrity Test Report MC03 (P3, P4, AR, AFCONS MD, TSCCL 3-Jul-19
P5, P6, Test Pile 2)

152 1270-TSCCL-MD-141 25-Jul-19 Submission of Calibration Certificate AR, AFCONS MD, TSCCL 25-Jul-19

156 1270-TSCCL-MD-145 27-Jul-19 Submission of Calibration Certificate for Compression AR, AFCONS MD, TSCCL 29-Jul-19
Testing Machine.

166 1270-TSCCL-MD-155 27-Aug-19 Source approval for Cement – Bharathi Cement - AR, AFCONS MD, TSCCL 21-Aug-19
Regarding

170 1270-TSCCL-MD-159 5-Sep-19 Test Report of Hume Pipes - Regarding. AR, AFCONS MD, TSCCL 6-Sep-19

Submission of Mix Design M35 Pile Concrete–


173 1270-TSCCL-MD-162 9-Sep-19 Reg.Submission of Mix Design M35 Pile Concrete– AR, AFCONS MD, TSCCL 9-Sep-19
Reg.
PMC-DPE-TSC-SC-351-2019 13-Sep-19
179 1270-TSCCL-MD-168 13-Sep-19 Submission of Mix Design M35 Pile Cap Concrete– Reg. AR, AFCONS MD, TSCCL 13-Sep-19

183 1270-TSCCL-MD-172 16-Sep-19 Submission of Test Report for Paver Block AR, AFCONS MD, TSCCL 16-Sep-19

Submission of Method Statement for Initial Pile Load


188 1270-TSCCL-MD-177 18-Sep-19 Test AR, AFCONS MD, TSCCL 19-Sep-19

Submission of Initial Vertical Pile Load Test result


191 1270-TSCCL-MD-180 21-Sep-19 conducted at Leela Mahal Junction of MC00 - AR, AFCONS MD, TSCCL 21-Sep-19
Regarding

194 1270-TSCCL-MD-183 23-Sep-19 Submission of Method Statement for Lateral Load Test AR, AFCONS MD, TSCCL 23-Sep-19
(1200mm dia Pile).
Submission of Initial Lateral Pile Load Test conducted
200 1270-TSCCL-MD-189 27-Sep-19 on 1200mm dia pile at Leela Mahal Junction of MC00 AR, AFCONS MD, TSCCL 28-Sep-19
stretch.

201 1270-TSCCL-MD-190 30-Sep-19 Submission of Pile Integrity Test MC03 (P24, P25, P26, AR, AFCONS MD, TSCCL 1-Oct-19
P27, P28)

203 1270-AECOM-DTL-192 1-Oct-19 Submission of RFI copies - MC03 Piles AR, AFCONS DTL, AECOM 1-Oct-19

Submission of RFI copies - Pile Caps and Pier Lifts of


204 1270-AECOM-DTL-193 1-Oct-19 MC03 Structure AR, AFCONS DTL, AECOM 1-Oct-19

211 1270-TSCCL-MD-200 9-Oct-19 Submission of Initial Static Vertical Pile Load Test AR, AFCONS MD, TSCCL 10-Oct-19
Report – 1200mm dia pile

Submission of Mix Design M50 Pier / Pier Cap


217 1270-TSCCL-MD-206 15-Oct-19 Concrete– Reg AR, AFCONS MD, TSCCL 15-Oct-19

225 1270-TSCCL-MD-214 21-Oct-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 22-Oct-19
(P65, P66, P67)

231 1270-TSCCL-MD-220 24-Oct-19 Submission of Mix Design M50 Precast Concrete – Reg. AR, AFCONS MD, TSCCL 25-Oct-19

237 1270-TSCCL-MD-226 28-Oct-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 28-Oct-19
(P58, P59, P60, P61, P62, P63, P64)

241 1270-TSCCL-MD-230 30-Oct-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 31-Oct-19
(P68, P69, P70, P71)

Page 2 of 13
Submitted Reply/Comments From
Sr. No. Ref. No. Dated Subject Issued by Addressed to Date Remarks
on PMC

248 1270-TSCCL-MD-238 5-Nov-19 Submission of Method Statement for back fill around AR, AFCONS MD, TSCCL 5-Nov-19
Pile Cap – Reg

249 1270-TSCCL-MD-239 5-Nov-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 6-Nov-19
(P72)

Submission of Pile Integrity Test conducted at MC00


253 1270-TSCCL-MD-243 11-Nov-19 (P52, P53, P54) AR, AFCONS MD, TSCCL 11-Nov-19

260 1270-TSCCL-MD-250 15-Nov-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 16-Nov-19
(P46, P47, P48, P49, P50)

Submission of Pile Integrity Test conducted at MC00


265 1270-TSCCL-MD-255 21-Nov-19 (P73, P74, P75, P76) AR, AFCONS MD, TSCCL 21-Nov-19

267 1270-TSCCL-MD-257 26-Nov-19 Submission of Routine Vertical Pile Load Test Report AR, AFCONS MD, TSCCL 26-Nov-19
for Pile No. A2/4 of MC00.

Submission of Pile Integrity Test conducted at MC00


269 1270-TSCCL-MD-259 25-Nov-19 (P43, P44, P45) & MCRT (P1, P2) AR, AFCONS MD, TSCCL 26-Nov-19

270 1270-TSCCL-MD-260 26-Nov-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 26-Nov-19
(P3, P4) & MCRT (P39, P40, P41, P42)

272 1270-TSCCL-MD-262 3-Dec-19 Source approval for Cement – MAHA Cement of M/s. AR, AFCONS MD, TSCCL 4-Dec-19
Sree Jayajothi Cements Private Limited - Regarding

275 1270-TSCCL-MD-265 29-Nov-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 30-Nov-19
(P44-1, P44-3, P45-2,P45-3)

276 1270-TSCCL-MD-266 2-Dec-19 Submission of Method Statement for Precast Segment AR, AFCONS MD, TSCCL 2-Dec-19
Casting

284 1270-TSCCL-MD-274 9-Dec-19 Submission of Cube Test Reports AR, AFCONS MD, TSCCL 11-Dec-19

Submission of Pile Integrity Test conducted at MC00 &


288 1270-TSCCL-MD-278 7-Dec-19 MCRT AR, AFCONS MD, TSCCL 9-Dec-19

Submission of Pile Integrity Test conducted at MC00


290 1270-TSCCL-MD-280 12-Dec-19 (Piles P32-1, 2, 3, 4 & P33-1, 2, 3, 4 & P34-1, 2, 3, 4) AR, AFCONS MD, TSCCL 13-Dec-19
and MCRT (Piles P8-1, 2, 3).

Submission of Vendor credential of M/s. Geocon Infra


292 1270-TSCCL-MD-282 14-Dec-19 Private Limited for Construction of Reinforced Soil AR, AFCONS MD, TSCCL 16-Dec-19
Wall

293 1270-TSCCL-MD-283 14-Dec-19 Submission of Vendor credential of M/s. Utracon AR, AFCONS MD, TSCCL 16-Dec-19
Structural Systems Pvt Ltd for Prestressing works

294 1270-TSCCL-MD-284 14-Dec-19 Submission of Vendor credential of Astral Pipes of AR, AFCONS MD, TSCCL 16-Dec-19
M/s. Rex Polyextrusion Pvt. Ltd

295 1270-TSCCL-MD-285 14-Dec-19 Source approval for Grout Admixture Cebex 100 AR, AFCONS MD, TSCCL 16-Dec-19

Submission of Pile Integrity Test conducted at MC00


296 1270-TSCCL-MD-286 16-Dec-19 (Piles P27/1, 2, 3, 4, P28/1, 2, 3, 4, P29/1, 2, 3, 4, AR, AFCONS MD, TSCCL 17-Dec-19
P30/1, 2, 3, 4, P31/1, 2, 3, 4 & A2/1, 2, 3, 4).

297 1270-TSCCL-MD-287 16-Dec-19 Source approval for repair works materials AR, AFCONS MD, TSCCL 17-Dec-19

Submission of Vendor credential of M/s. JB


298 1270-TSCCL-MD-288 16-Dec-19 Engineering Corporation RE-Bar Couplers India (P) AR, AFCONS MD, TSCCL 17-Dec-19
Limited

Page 3 of 13
Submitted Reply/Comments From
Sr. No. Ref. No. Dated Subject Issued by Addressed to Date Remarks
on PMC

299 1270-TSCCL-MD-289 17-Dec-19 Submission of Method Statement for Segment Repair AR, AFCONS MD, TSCCL 18-Dec-19
Works

301 1270-AECOM-DTL-291 17-Dec-19 Submission of closed RFI copies for the Month of AR, AFCONS DTL, AECOM 18-Dec-19
November 2019

302 1270-TSCCL-MD-292 19-Dec-19 Submission of Test Certificate for HT Strands AR, AFCONS MD, TSCCL 19-Dec-19

Submission of Pile Integrity Test conducted at MC00


303 1270-TSCCL-MD-293 23-Dec-19 (Piles P37/1, 2, 3, 4). AR, AFCONS MD, TSCCL 23-Dec-19

307 1270-AECOM-DTL-298 31-Dec-19 Submission of closed RFI copies for the Month of AR, AFCONS DTL, AECOM 2-Jan-20
September & October 2019.

311 1270-TSCCL-MD-301 3-Jan-20 Submission of Method Statement for Ultra Pulse AR, AFCONS MD, TSCCL 3-Jan-20
Velocity Test

312 1270-TSCCL-MD-302 7-Jan-20 Submission of Vendor credential of M/s. Kridhan Infra AR, AFCONS MD, TSCCL 7-Jan-20
Limited

315 1270-TSCCL-MD-305 7-Jan-20 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 8-Jan-20
(Piles P26/1, 2, 3, 4 & P36/1, 2, 3, 4).

Submission of Routine Vertical Pile Load Test Report


316 1270-TSCCL-MD-306 11-Jan-20 for Pile No. P35/4 of MC00 AR, AFCONS MD, TSCCL 11-Jan-20

Submission of Pile Integrity Test conducted at MC00


317 1270-TSCCL-MD-307 7-Jan-20 (Piles P2/1, 2, 3, 4 & P4/1, 2, 3, 4 & A1/1, 2, 3). AR, AFCONS MD, TSCCL
Not submitted

Submission of Revised Method Statement for Precast


318 1270-TSCCL-MD-308 7-Jan-20 Segment Casting (Rev. 1). AR, AFCONS MD, TSCCL 8-Jan-20

319 1270-TSCCL-MD-309 7-Jan-20 Submission of Revised Method Statement for Segment AR, AFCONS MD, TSCCL 8-Jan-20
Repair Works (Rev. 1)

320 1270-TSCCL-MD-310 7-Jan-20 Submission of Cube Test Reports – Dec 2019 AR, AFCONS MD, TSCCL 8-Jan-20

322 1270-TSCCL-MD-312 8-Jan-20 Submission of Mix Design M45 Grade Concrete for AR, AFCONS MD, TSCCL 9-Jan-20
Underpass Piles- Reg.

323 1270-TSCCL-MD-313 8-Jan-20 Submission of Mix Design M50 Grade Concrete for AR, AFCONS MD, TSCCL 9-Jan-20 PMC-DPE-TSC-SC-504-2020 23-Jan-20
Precast Segment, Pier and Pier Cap - Reg

Submission of Mix Design M50 Grade Concrete with


324 1270-TSCCL-MD-314 8-Jan-20 Dalmia Cement for Precast Segment, Pier and Pier Cap AR, AFCONS MD, TSCCL 9-Jan-20
- Reg

Submission of Method Statement for Post Tensioning


325 1270-TSCCL-MD-315 8-Jan-20 Works to be carried out by M/s. Utracon Structural AR, AFCONS MD, TSCCL 9-Jan-20
Systems Pvt Ltd

326 1270-AECOM-DTL-316 8-Jan-20 Submission of closed RFI copies for the Month of AR, AFCONS DTL, AECOM 10-Jan-20
December 2019

330 1270-TSCCL-MD-320 20-Jan-20 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 21-Jan-20
(Piles P35/1, 2, 3, 4)

Page 4 of 13
Submitted Reply/Comments From
Sr. No. Ref. No. Dated Subject Issued by Addressed to Date Remarks
on PMC

333 1270-TSCCL-MD-323 20-Jan-20 Submission of Inspection details and other supporting AR, AFCONS MD, TSCCL 20-Jan-20
documents for closure of NCR raised for Pier P68.

334 1270-TSCCL-MD-324 20-Jan-20 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 21-Jan-20
(Piles P1/1, 2, 3, 4 & P1A/1, 2, 3, 4).

Submission of Material Test Certificate (MTC) and


338 1270-TSCCL-MD-328 23-Jan-20 Detailed specification for the material used for AR, AFCONS MD, TSCCL 23-Jan-20
Prestressing works.

Submission of Vendor Credentials of M/s. Mageba


339 1270-TSCCL-MD-329 23-Jan-20 Bridge Products Pvt. Ltd. for supply of Elastomeric AR, AFCONS MD, TSCCL 24-Jan-20
Bearing.

344 1270-TSCCL-MD-334 28-Jan-20 Submission of Pile Integrity Test conducted at MC03 AR, AFCONS MD, TSCCL
(Piles P1/1, 2, 3, 4).

345 1270-TSCCL-MD-335 28-Jan-20 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL
(Piles P6/1, 2, 3, 4 & P7/1, 2, 3, 4).

346 1270-TSCCL-MD-336 28-Jan-20 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL
(Piles P5/1, 2, 3, 4).

347 1270-TSCCL-MD-337 28-Jan-20 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL
(Piles P8/1, 2, 3, 4).

Submission of Routine Vertical Pile Load Test Report


348 1270-TSCCL-MD-338 29-Jan-20 for Pile No. P3/1 of MC00 AR, AFCONS MD, TSCCL

Submission of Method Statement for Repairing of


351 1270-TSCCL-MD-341 4-Feb-20 Shrinkage Cracks on Top of Concrete Surface AR, AFCONS MD, TSCCL

Submission of Report on Load Transfer Test of Multi


354 1270-TSCCL-MD-344 6-Feb-20 Anchorage System (M/s. Utracon Structural System AR, AFCONS MD, TSCCL
Pvt. Ltd.)

355 1270-TSCCL-MD-345 6-Feb-20 Submission of Test Report of Couplers (M/s. Kridhan AR, AFCONS MD, TSCCL
Infratech Pvt. Ltd.)

Page 5 of 13
Sr.
Ref. No. Date
No.
QAP
13 1 1270/TSCCL-MD/008 18-Mar-19
Method Statement
19 1 1270/TSCCL/MD/014 26-Mar-19

65 2 1270/TSCCL-MD-/053 8-May-19

85 3 1270-TSCCL-MD-074 25-May-19

93 4 1270-TSCCL-MD-082 4-Jun-19

110 5 1270-TSCCL-MD-099 11-Jun-19

116 6 1270-TSCCL-MD-105 13-Jun-19

130 7 1270-TSCCL-MD-119 1-Jul-19

188 8 1270-TSCCL-MD-177 18-Sep-19

194 9 1270-TSCCL-MD-183 23-Sep-19

248 10 1270-TSCCL-MD-238 5-Nov-19

276 11 1270-TSCCL-MD-266 2-Dec-19

299 12 1270-TSCCL-MD-289 17-Dec-19

312 13 1270-TSCCL-MD-301 3-Jan-20

319 14 1270-TSCCL-MD-308 7-Jan-20


320 15 1270-TSCCL-MD-309 7-Jan-20

326 16 1270-TSCCL-MD-315 8-Jan-20

Materials and Vendor


58 1 1270/TSCCL/MD/047 30-Apr-19

71 2 1270/TSCCL-MD-/059 17-May-19

75 3 1270/TSCCL-MD-/063 18-May-19

76 4 1270/TSCCL-MD-/064 18-May-19

95 5 1270-TSCCL-MD-084 6-Jun-19

96 6 1270-TSCCL-MD-085 6-Jun-19

97 7 1270-TSCCL-MD-086 6-Jun-19

98 8 1270-TSCCL-MD-087 6-Jun-19

112 9 1270-TSCCL-MD-101 13-Jun-19

166 10 1270-TSCCL-MD-155 27-Aug-19

183 11 1270-TSCCL-MD-172 16-Sep-19

272 12 1270-TSCCL-MD-262 3-Dec-19

292 13 1270-TSCCL-MD-282 14-Dec-19

293 14 1270-TSCCL-MD-283 14-Dec-19


294 15 1270-TSCCL-MD-284 14-Dec-19

295 16 1270-TSCCL-MD-285 14-Dec-19

297 17 1270-TSCCL-MD-287 16-Dec-19

298 18 1270-TSCCL-MD-288 16-Dec-19

313 19 1270-TSCCL-MD-302 7-Jan-20

338 20 1270-TSCCL-MD-328 23-Jan-20

339 21 1270-TSCCL-MD-329 23-Jan-20

Mix Design
48 1 1270/TSCCL-MD-/037 19-Apr-19

49 2 1270/TSCCL-MD-/038 19-Apr-19

60 3 1270/TSCCL-MD-/049 2-May-19

94 4 1270-TSCCL-MD-083 6-Jun-19

113 5 1270-TSCCL-MD-102 13-Jun-19

114 6 1270-TSCCL-MD-103 13-Jun-19

115 7 1270-TSCCL-MD-104 13-Jun-19

128 8 1270-TSCCL-MD-117 28-Jun-19

131 9 1270-TSCCL-MD-120 1-Jul-19


173 10 1270-TSCCL-MD-162 9-Sep-19

179 11 1270-TSCCL-MD-168 13-Sep-19

217 12 1270-TSCCL-MD-206 15-Oct-19

231 13 1270-TSCCL-MD-220 24-Oct-19

323 14 1270-TSCCL-MD-312 8-Jan-20

324 15 1270-TSCCL-MD-313 8-Jan-20

325 16 1270-TSCCL-MD-314 8-Jan-20


Subject Response Date

Submission of Quality Assurance Plan (QAP)

Submission of Method statement for construction


of board cast in-situ piles
Submission of Method Statement for Plate Load
Test
Submission of Method Statement for Initial Pile
Load Test.
Submission of Method Statement for Lateral Load
Test
Submission of Method Statement for Construction
of Pile Caps.
Submission of Method Statement for Pile Integrity
test.
Submission of Method Statement for Pier and Pier
Cap Construction
Submission of Method Statement for Initial Pile
Load Test
Submission of Method Statement for Lateral Load
Test (1200mm dia Pile).
Submission of Method Statement for back fill
around Pile Cap – Reg
Submission of Method Statement for Precast
Segment Casting
Submission of Method Statement for Segment
Repair Works
Submission of Method Statement for Ultra Pulse
Velocity Test
Submission of Revised Method Statement for
Precast Segment Casting (Rev. 1).
Submission of Revised Method Statement for
Segment Repair Works (Rev. 1)
Submission of Method Statement for Post
Tensioning Works to be carried out by M/s.
Utracon Structural Systems Pvt Ltd

Use of Fly ash with Cement in Concrete - PMC/DPE/TSC/SC/25 27-May-19


Regarding 5/2019
PMC/DPE/TSC/SC/25 18-May-19
Usage of Crushed stone sand in Concrete works 2/2019
PMC/DPE/TSC/SC/25 18-May-19
Usage of Crushed sand 2/2019
PMC/DPE/TSC/SC/25 18-May-19
Usage of Crushed stone sand 2/2019
Source approval for Curing Compound Material –
Regarding.
Source approval for Concrete admixture suppliers PMC-DPE-TSC-SC- 6-Jun-19
– Regarding. 266-2019
PMC-DPE-TSC-SC- 6-Jun-19
Source approval for Cement suppliers – Regarding. 268-2019
PMC-DPE-TSC-SC- 6-Jun-19
Source approval for Steel suppliers – Regarding. 267-2019
Submission of Test Report for Rectangular Paver
and Kerb stone
Source approval for Cement – Bharathi Cement -
Regarding
Submission of Test Report for Paver Block
Source approval for Cement – MAHA Cement of
M/s. Sree Jayajothi Cements Private Limited -
Regarding

Submission of Vendor credential of M/s. Geocon


Infra Private Limited for Construction of
Reinforced Soil Wall

Submission of Vendor credential of M/s. Utracon


Structural Systems Pvt Ltd for Prestressing works
Submission of Vendor credential of Astral Pipes of
M/s. Rex Polyextrusion Pvt. Ltd

Source approval for Grout Admixture Cebex 100

Source approval for repair works materials


Submission of Vendor credential of M/s. JB
Engineering Corporation RE-Bar Couplers India (P)
Limited
Submission of Vendor credential of M/s. Kridhan
Infra Limited
Submission of Material Test Certificate (MTC) and
Detailed specification for the material used for
Prestressing works.

Submission of Vendor Credentials of M/s. Mageba


Bridge Products Pvt. Ltd. for supply of Elastomeric
Bearing.

Carrying out Concrete Design Mix Trials at Ultatech


RMC - Regarding
Submission of Mix Design M35 Pile Concrete - PMC/DPE/TSC/SC/25 27-May-19
Regarding. 5/2019
Submission of Mix Design M35 Pile concrete - PMC/DPE/TSC/SC/23 3-May-19
Regarding 7/2019
Carrying of Concrete Mix Design of M50 Grade – PMC-DPE-TSC-SC- 6-Jun-19
Regarding 269-2019
Submission of Mix Design M35 Pile Cap Concrete
(Only Cement) - Reg

Submission of Mix Design M35 Pile Concrete - Reg

Submission of Mix Design M35 Pile Cap Concrete


(Cement & Flyash) - Reg
Submission of Mix Design M50 Grade Concrete -
Reg
Submission of Mix Design M50 Grade Concrete for
Precast Segment - Reg.
Submission of Mix Design M35 Pile Concrete–
Reg.Submission of Mix Design M35 Pile Concrete–
Reg.
Submission of Mix Design M35 Pile Cap Concrete– PMC-DPE-TSC-SC- 13-Sep-19
Reg. 351-2019
Submission of Mix Design M50 Pier / Pier Cap
Concrete– Reg
Submission of Mix Design M50 Precast Concrete –
Reg.
Submission of Mix Design M45 Grade Concrete for
Underpass Piles- Reg.

Submission of Mix Design M50 Grade Concrete for


Precast Segment, Pier and Pier Cap - Reg

Submission of Mix Design M50 Grade Concrete


with Dalmia Cement for Precast Segment, Pier and
Pier Cap - Reg

You might also like