PMC/DPE/TSC/SC/232/2019, 29-Apr-2019,
53 1270/TSCCL-MD-/041 27-Apr-19 Construction of Permanent Piles AR, AFCONS MD, TSCCL 29-Apr-19 8348/E5/TSCCL/2018/E 30-Apr-2019
PMC/DPE/TSC/SC/255/2019 27-May-19
58 1270/TSCCL/MD/047 30-Apr-19 Use of Fly ash with Cement in Concrete - Regarding AR, AFCONS MD, TSCCL 2-May-19
65 1270/TSCCL-MD-/053 8-May-19 Submission of Method Statement for Plate Load Test AR, AFCONS MD, TSCCL 9-May-19
69 1270/TSCCL-MD-/057 16-May-19 Submission of Plate Load Test reports at P14 of MC03 AR, AFCONS MD, TSCCL 17-May-19
PMC/DPE/TSC/SC/252/2019 18-May-19
71 1270/TSCCL-MD-/059 17-May-19 Usage of Crushed stone sand in Concrete works AR, AFCONS MD, TSCCL 18-May-19
PMC/DPE/TSC/SC/252/2019 18-May-19
75 1270/TSCCL-MD-/063 18-May-19 Usage of Crushed sand AR, AFCONS MD, TSCCL 20-May-19
PMC/DPE/TSC/SC/252/2019 18-May-19
76 1270/TSCCL-MD-/064 18-May-19 Usage of Crushed stone sand AR, AFCONS MD, TSCCL 20-May-19
81 1270-TSCCL-MD-070 24-May-19 Cube Test report of Test Pile No. 2 done using Crushed AR, AFCONS MD, TSCCL 24-May-19
Stone Sand.
85 1270-TSCCL-MD-074 25-May-19 Submission of Method Statement for Initial Pile Load AR, AFCONS MD, TSCCL 27-May-19
Test.
93 1270-TSCCL-MD-082 4-Jun-19 Submission of Method Statement for Lateral Load Test AR, AFCONS MD, TSCCL 4-Jun-19
105 1270-TSCCL-MD-094 10-Jun-19 Submission of Plate Load Test at P-53 of MC00 stretch. AR, AFCONS MD, TSCCL 10-Jun-19
110 1270-TSCCL-MD-099 11-Jun-19 Submission of Method Statement for Construction of AR, AFCONS MD, TSCCL 11-Jun-19
Pile Caps.
112 1270-TSCCL-MD-101 13-Jun-19 Submission of Test Report for Rectangular Paver and AR, AFCONS MD, TSCCL 13-Jun-19
Kerb stone
Submission of Mix Design M35 Pile Cap Concrete PMC-DPE-TSC-SC-275-C-2019 14-Jun-19
113 1270-TSCCL-MD-102 13-Jun-19 AR, AFCONS MD, TSCCL 14-Jun-19
(Only Cement) - Reg
PMC-DPE-TSC-SC-280-B-2019 17-Jun-19
114 1270-TSCCL-MD-103 13-Jun-19 Submission of Mix Design M35 Pile Concrete - Reg AR, AFCONS MD, TSCCL 14-Jun-19
116 1270-TSCCL-MD-105 13-Jun-19 Submission of Method Statement for Pile Integrity test. AR, AFCONS MD, TSCCL 14-Jun-19
124 1270-TSCCL-MD-113 19-Jun-19 Submission of Initial Static Vertical Pile Load Test. AR, AFCONS MD, TSCCL 19-Jun-19
Page 1 of 13
Submitted Reply/Comments From
Sr. No. Ref. No. Dated Subject Issued by Addressed to Date Remarks
on PMC
127 1270-TSCCL-MD-116 24-Jun-19 Submission of Initial Lateral Pile Load Test. AR, AFCONS MD, TSCCL 24-Jun-19
PMC-DPE-TSC-SC-289-2019 29-Jun-19
128 1270-TSCCL-MD-117 28-Jun-19 Submission of Mix Design M50 Grade Concrete - Reg AR, AFCONS MD, TSCCL 29-Jun-19
130 1270-TSCCL-MD-119 1-Jul-19 Submission of Method Statement for Pier and Pier Cap AR, AFCONS MD, TSCCL 1-Jul-19
Construction
Submission of Mix Design M50 Grade Concrete for PMC/DPE/TSC/SC/296-B/2019 3-Jul-19
131 1270-TSCCL-MD-120 1-Jul-19 AR, AFCONS MD, TSCCL 2-Jul-19
Precast Segment - Reg.
134 1270-TSCCL-MD-123 2-Jul-19 Submission of Pile Integrity Test Report MC03 (P3, P4, AR, AFCONS MD, TSCCL 3-Jul-19
P5, P6, Test Pile 2)
152 1270-TSCCL-MD-141 25-Jul-19 Submission of Calibration Certificate AR, AFCONS MD, TSCCL 25-Jul-19
156 1270-TSCCL-MD-145 27-Jul-19 Submission of Calibration Certificate for Compression AR, AFCONS MD, TSCCL 29-Jul-19
Testing Machine.
166 1270-TSCCL-MD-155 27-Aug-19 Source approval for Cement – Bharathi Cement - AR, AFCONS MD, TSCCL 21-Aug-19
Regarding
170 1270-TSCCL-MD-159 5-Sep-19 Test Report of Hume Pipes - Regarding. AR, AFCONS MD, TSCCL 6-Sep-19
183 1270-TSCCL-MD-172 16-Sep-19 Submission of Test Report for Paver Block AR, AFCONS MD, TSCCL 16-Sep-19
194 1270-TSCCL-MD-183 23-Sep-19 Submission of Method Statement for Lateral Load Test AR, AFCONS MD, TSCCL 23-Sep-19
(1200mm dia Pile).
Submission of Initial Lateral Pile Load Test conducted
200 1270-TSCCL-MD-189 27-Sep-19 on 1200mm dia pile at Leela Mahal Junction of MC00 AR, AFCONS MD, TSCCL 28-Sep-19
stretch.
201 1270-TSCCL-MD-190 30-Sep-19 Submission of Pile Integrity Test MC03 (P24, P25, P26, AR, AFCONS MD, TSCCL 1-Oct-19
P27, P28)
203 1270-AECOM-DTL-192 1-Oct-19 Submission of RFI copies - MC03 Piles AR, AFCONS DTL, AECOM 1-Oct-19
211 1270-TSCCL-MD-200 9-Oct-19 Submission of Initial Static Vertical Pile Load Test AR, AFCONS MD, TSCCL 10-Oct-19
Report – 1200mm dia pile
225 1270-TSCCL-MD-214 21-Oct-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 22-Oct-19
(P65, P66, P67)
231 1270-TSCCL-MD-220 24-Oct-19 Submission of Mix Design M50 Precast Concrete – Reg. AR, AFCONS MD, TSCCL 25-Oct-19
237 1270-TSCCL-MD-226 28-Oct-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 28-Oct-19
(P58, P59, P60, P61, P62, P63, P64)
241 1270-TSCCL-MD-230 30-Oct-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 31-Oct-19
(P68, P69, P70, P71)
Page 2 of 13
Submitted Reply/Comments From
Sr. No. Ref. No. Dated Subject Issued by Addressed to Date Remarks
on PMC
248 1270-TSCCL-MD-238 5-Nov-19 Submission of Method Statement for back fill around AR, AFCONS MD, TSCCL 5-Nov-19
Pile Cap – Reg
249 1270-TSCCL-MD-239 5-Nov-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 6-Nov-19
(P72)
260 1270-TSCCL-MD-250 15-Nov-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 16-Nov-19
(P46, P47, P48, P49, P50)
267 1270-TSCCL-MD-257 26-Nov-19 Submission of Routine Vertical Pile Load Test Report AR, AFCONS MD, TSCCL 26-Nov-19
for Pile No. A2/4 of MC00.
270 1270-TSCCL-MD-260 26-Nov-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 26-Nov-19
(P3, P4) & MCRT (P39, P40, P41, P42)
272 1270-TSCCL-MD-262 3-Dec-19 Source approval for Cement – MAHA Cement of M/s. AR, AFCONS MD, TSCCL 4-Dec-19
Sree Jayajothi Cements Private Limited - Regarding
275 1270-TSCCL-MD-265 29-Nov-19 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 30-Nov-19
(P44-1, P44-3, P45-2,P45-3)
276 1270-TSCCL-MD-266 2-Dec-19 Submission of Method Statement for Precast Segment AR, AFCONS MD, TSCCL 2-Dec-19
Casting
284 1270-TSCCL-MD-274 9-Dec-19 Submission of Cube Test Reports AR, AFCONS MD, TSCCL 11-Dec-19
293 1270-TSCCL-MD-283 14-Dec-19 Submission of Vendor credential of M/s. Utracon AR, AFCONS MD, TSCCL 16-Dec-19
Structural Systems Pvt Ltd for Prestressing works
294 1270-TSCCL-MD-284 14-Dec-19 Submission of Vendor credential of Astral Pipes of AR, AFCONS MD, TSCCL 16-Dec-19
M/s. Rex Polyextrusion Pvt. Ltd
295 1270-TSCCL-MD-285 14-Dec-19 Source approval for Grout Admixture Cebex 100 AR, AFCONS MD, TSCCL 16-Dec-19
297 1270-TSCCL-MD-287 16-Dec-19 Source approval for repair works materials AR, AFCONS MD, TSCCL 17-Dec-19
Page 3 of 13
Submitted Reply/Comments From
Sr. No. Ref. No. Dated Subject Issued by Addressed to Date Remarks
on PMC
299 1270-TSCCL-MD-289 17-Dec-19 Submission of Method Statement for Segment Repair AR, AFCONS MD, TSCCL 18-Dec-19
Works
301 1270-AECOM-DTL-291 17-Dec-19 Submission of closed RFI copies for the Month of AR, AFCONS DTL, AECOM 18-Dec-19
November 2019
302 1270-TSCCL-MD-292 19-Dec-19 Submission of Test Certificate for HT Strands AR, AFCONS MD, TSCCL 19-Dec-19
307 1270-AECOM-DTL-298 31-Dec-19 Submission of closed RFI copies for the Month of AR, AFCONS DTL, AECOM 2-Jan-20
September & October 2019.
311 1270-TSCCL-MD-301 3-Jan-20 Submission of Method Statement for Ultra Pulse AR, AFCONS MD, TSCCL 3-Jan-20
Velocity Test
312 1270-TSCCL-MD-302 7-Jan-20 Submission of Vendor credential of M/s. Kridhan Infra AR, AFCONS MD, TSCCL 7-Jan-20
Limited
315 1270-TSCCL-MD-305 7-Jan-20 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 8-Jan-20
(Piles P26/1, 2, 3, 4 & P36/1, 2, 3, 4).
319 1270-TSCCL-MD-309 7-Jan-20 Submission of Revised Method Statement for Segment AR, AFCONS MD, TSCCL 8-Jan-20
Repair Works (Rev. 1)
320 1270-TSCCL-MD-310 7-Jan-20 Submission of Cube Test Reports – Dec 2019 AR, AFCONS MD, TSCCL 8-Jan-20
322 1270-TSCCL-MD-312 8-Jan-20 Submission of Mix Design M45 Grade Concrete for AR, AFCONS MD, TSCCL 9-Jan-20
Underpass Piles- Reg.
323 1270-TSCCL-MD-313 8-Jan-20 Submission of Mix Design M50 Grade Concrete for AR, AFCONS MD, TSCCL 9-Jan-20 PMC-DPE-TSC-SC-504-2020 23-Jan-20
Precast Segment, Pier and Pier Cap - Reg
326 1270-AECOM-DTL-316 8-Jan-20 Submission of closed RFI copies for the Month of AR, AFCONS DTL, AECOM 10-Jan-20
December 2019
330 1270-TSCCL-MD-320 20-Jan-20 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 21-Jan-20
(Piles P35/1, 2, 3, 4)
Page 4 of 13
Submitted Reply/Comments From
Sr. No. Ref. No. Dated Subject Issued by Addressed to Date Remarks
on PMC
333 1270-TSCCL-MD-323 20-Jan-20 Submission of Inspection details and other supporting AR, AFCONS MD, TSCCL 20-Jan-20
documents for closure of NCR raised for Pier P68.
334 1270-TSCCL-MD-324 20-Jan-20 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL 21-Jan-20
(Piles P1/1, 2, 3, 4 & P1A/1, 2, 3, 4).
344 1270-TSCCL-MD-334 28-Jan-20 Submission of Pile Integrity Test conducted at MC03 AR, AFCONS MD, TSCCL
(Piles P1/1, 2, 3, 4).
345 1270-TSCCL-MD-335 28-Jan-20 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL
(Piles P6/1, 2, 3, 4 & P7/1, 2, 3, 4).
346 1270-TSCCL-MD-336 28-Jan-20 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL
(Piles P5/1, 2, 3, 4).
347 1270-TSCCL-MD-337 28-Jan-20 Submission of Pile Integrity Test conducted at MC00 AR, AFCONS MD, TSCCL
(Piles P8/1, 2, 3, 4).
355 1270-TSCCL-MD-345 6-Feb-20 Submission of Test Report of Couplers (M/s. Kridhan AR, AFCONS MD, TSCCL
Infratech Pvt. Ltd.)
Page 5 of 13
Sr.
Ref. No. Date
No.
QAP
13 1 1270/TSCCL-MD/008 18-Mar-19
Method Statement
19 1 1270/TSCCL/MD/014 26-Mar-19
65 2 1270/TSCCL-MD-/053 8-May-19
85 3 1270-TSCCL-MD-074 25-May-19
93 4 1270-TSCCL-MD-082 4-Jun-19
71 2 1270/TSCCL-MD-/059 17-May-19
75 3 1270/TSCCL-MD-/063 18-May-19
76 4 1270/TSCCL-MD-/064 18-May-19
95 5 1270-TSCCL-MD-084 6-Jun-19
96 6 1270-TSCCL-MD-085 6-Jun-19
97 7 1270-TSCCL-MD-086 6-Jun-19
98 8 1270-TSCCL-MD-087 6-Jun-19
Mix Design
48 1 1270/TSCCL-MD-/037 19-Apr-19
49 2 1270/TSCCL-MD-/038 19-Apr-19
60 3 1270/TSCCL-MD-/049 2-May-19
94 4 1270-TSCCL-MD-083 6-Jun-19