2 Fence
1 Excavation and building 12" wide Rubble L ft 117 800.00 93,600.00
plinth wall to fix 2" GI pipes uprights including
cement smooth plastering
2 Construction of flower trough according L ft 86 865.00 74,390.00
drawing
3 Fabrication and fixing GI pipe fence according L ft 117 2,400.00 280,800.00
to drawing
4 Fabrication and Fixing main gate No 1 80,000.00 80,000.00
5 Fabrication and fixing walking gate No 1 20,000.00 20,000.00
3 Guard Room
1 Construction of guard room according to the Item 1 350,000.00 350,000.00
drawing
4 Service Pit
1 Construction of service pit including earth Item 1 900,000.00 900,000.00
work, Concrete, waterproofing, plastering,
Tiling, mass concrete steps, manholes,
electrical work etc.