Professional Documents
Culture Documents
Final Inspection
Final Inspection
H
W1 W2 W3
Number of units 12 15 16 16 20 20
Compressed air connection* BSP 1/4” 1/4” 1/4” 1/4” 1/4” 1/4”
Head office:
Meyn Food Processing Technology B.V. T: +31 (0)20 2045 000
Westeinde 6, 1511 MA Oostzaan (Amsterdam) F: +31 (0)20 2045 001
P.O. Box 16, 1510 AA Oostzaan I: www.meyn.com
The Netherlands
The data published correspond, under reservation of all our rights, to the most recent information at the moment of publication and are subject to future
modifications. Meyn reserves the right to modify the construction and the execution of its products at any time. No rights can be derived from this publication. 11-09-18
Meyn final inspection machine ECP
• Exact positioning of bird in machine results in very high performance.
• No bird no vacuum.