Professional Documents
Culture Documents
CLUBHOUSE
Electricity - Clubhouse $ - $ - $ 16,459
Telephone 8,700 9,835 9,000
Clubhouse Utilities 30,000 31,810 0
Clubhouse Repair and Maintenance 10,000 1,057 1,000
Clubhouse Cleaning 4,500 3,500 3,600
Water & Sewer - Clubhouse 4,768.21
Total Clubhouse $ 53,200 $ 46,203 $ 34,827
UTILITIES
Electricity - Signage $ - $ - $ 2,000.00
Water - Irrigation Systems 4,000.00 2,504.73 2,600.00
Total Utilities $ 4,000.00 $ 2,504.73 $ 4,600.00
GENERAL MAINTENANCE
Grounds Improvements $ 53,000 $ 38,574 $ 35,000
Tree Work (Tree and Stump Removal, Plan 30,000 23,022 25,000
Irrigation Repairs 0 0 2,400
Pond Repairs 0 0 5,000
Elevator Repairs 0 0 500
Fence/Wall Repairs 0 0 1,500
Fire Prevention/Safety 0 0 0
Tot Lot Maintenance/Repair 20,000 5,000 10,000
General Building Materials 0 0 2,500
Special Trash Pickup 0 0 600
HVAC Repairs 0 0 1,500
Drainage/Erosion Repairs 0 0 3,000
Plumbing Repairs 0 0 550
Social Events/Activities 25,000 23,070 25,000
General Repair and Maintenance 26,000 18,230 6,000
Total General Maintenance $ 154,000 $ 107,896 $ 118,550
CONTRACT SERVICES
Grounds Maintenance Contract $ 145,000 $ 138,580 $ 167,979
Pond Maintenance Contract 7,000 4,718 4,859
Alarm Monitoring/Security Contract 0 0 600
Inspection Fees 0 0 24,000
Exterminating/Pest Control 0 0 990
Trash Removal Contract 2,200 2,402 1,770
Snow Removal 10,000 46,931 34,350
Total Contract Services $ 164,200 $ 192,631 $ 234,548
TOWNHOUSE MAINT. AND SERVICES
Townhome Street Lights $ 6,000 $ 6,259 $ 5,968
Townhouse Landscaping $ 70,000 $ 67,001 $ 79,049
Townhouse Snow and Sand Removal $ 60,000 $ 41,931 $ 50,232
Total Townhome Services 136,000 115,192 135,249
RESERVE EXPENDITURES
2020 Reserve Projects- CA $ - $ 13,000 $ 43,929
Butternut Asphalt - TH $ - $ - $ 129,014
Capital Improvement Projects $ - $ - $ 10,000
Total Reserve Expenditures $ - $ - 182,943
RESERVES CONTRIBUTIONS
Yearly Reserve Contribution $ 248,000 $ 200,780 $ 200,000
Townhouse Reserves $ 145,000 $ 144,996 $ 141,636
Operating Reserves $ 9,957 $ 11,941 $ 12,000
Capital Improvement Projects Reserve 0 0 $ 10,000
Transfer from Reserves $ 2,200 $ (13,000) $ (182,943)
Sub-total $ 402,957 $ 344,717 $ 180,693
January 2020 – Expected “accumulated cash reserves set aside to repair, replace, or
restore capital components” – $1,280,576.37
Amount of “expected contribution to the reserve fund” total for 2020 – $353,636.00
Procedures used for estimation and accumulation of cash reserves, reported pursuant to
section 55.1-1826(3) of the Virginia POA Act:
The reserve accumulation is calculated and managed according to recommended funding based on the
Association’s reserve study, which uses two generally accepted methods, the Cash Flow Method, and the
Component Method. Both calculations are based upon the same financial data, including the costs of the
replacements of Wellington Community Association’s Common Elements, and the Wellington Common
Reserves reported to be on deposit at the start of the Study. The Cash Flow Method and Component Method
calculations and Replacement Reserve funding recommendations in 2016, the Study Year, are discussed below:
Cash Flow Method - Minimum Recommended Funding of the Wellington Common Reserve in the Study Year
($8.45 per unit per month). The Cash Flow Method calculates the minimum annual funding of Replacement
Reserves that will fund Projected Annual Replacements from a common pool of Replacement Reserves and
prevents Replacement Reserves from dropping below the Minimum Recommended Balance. Annual deposits to
Replacements Reserves remain the same between peaks in cumulative expenditures called Peak Years.
These procedures and definitions are taken from the Association’s R+STUDY September 2015 study, Wm.
Bruce Bennett, Sr. Reserve Analyst, pages 5-6 (2016).