0 1 1 F B

1
POWER FEED 20A
2 380V/3PH/50HZ
L1 JOCKEY
3 PUMP
CONTROLLER JOCKEY
L2 PUMP
4
1.5HP
L3 2.8FLA
5
MAIN
6 LUGS
ONLY
7

10

11

GROUND NEUTRAL BUSS LOCATED IN


12
DISTRIBUTION PANEL

13

14

15

16

17

18

19
20A DIESEL
20 CONTROLLER

N DIESEL PUMP CONTROLLER:


21 SEE MANUFACTURERS DIAGRAMS FOR
INTERCONNECTION WIRING OF DIESEL
22 ENGINE AND REMOTE ALARM PANEL.

23

24 NOTE:
WIRING BETWEEN ENGINE
HI/LOW ENGINE
25 CONTROLLER AND ENGINE PANEL
FUEL PANEL
MUST BE IN ACCORDANCE WITH
LEVEL SIZING SET FORTH IN THE
26 SWITCH CONTROLLER MANUAL.

27

28

20A
29

30 FIRE PUMP ENGINE


N PRE-HEATER 1500W
QTY (1)
31

32 380V/3PH/50HZ
MAIN POWER
33 DISTRIBUTION
PANEL

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

JOB NAME: Order #:


YPFB LOGISTICA ENTRE RIOS C0146894
POWER FEED REV # ECR # DATE BY R
FLO-PAK INTEGRATED PACKAGED PUMPING SYSTEMS
380V/3PH/50HZ
Drawn: Date:
MIN. CKT AMPACITY
SPIPES 3/29/2016
Dwg Number: Rev: 0
20A A85-140931 Sheet 1 of 1