Reference No: INSP/2019/ Date: Client: Soil-Build (Pte) Ltd Time: A en on: Loca on: Bedok North Ave 4 Project: Bedok Food Factory Item:
No. Descrip on Quan ty Remarks
Checked by:
JMI -Engineer /Supervisor
To be completed by client's representa ves
( ) Inspected without comments. To release for further opera ons. ( ) Inspected with comments (see below) ( ) Inspected and to confirm dimension & alignment is according to design requirement Comments (if any):
( ) We have reviewed the above reference work and found it sa sfactory.
You may Proceed Witnessed / Reviewed by Witnessed / Reviewed by