IR-P2 - P03 - ST - RFI - JIS -

PENGAJUAN UNTUK INSPEKSI / REQUEST FOR INSPECTION Ph1 GA T1 RP MN -

JOINT INSPECTION SCHEDULE Ph2 GA T2 RP TH MR


Ph3 GA T3 - - -

PROYEK / PROJECT : THAMRIN NINE PHASE II TANGGAL / DATE 19-Nov-19


PEKERJAAN / WORK : Structure, ARCHITECTURE, MEP SUBKON / SUBCONT
LOKASI / LOCATION : Townhouse, Pool Area, Tower2 and Midrise

Penanggung Jawab / Person In Charge


Time
No Work Description GRIDLINE AREA KETERANGAN / REMARK
Schedule MAIN CONT PGW - RE
PIC SM PIC SM
STRUCTURE

1 15.00 - 16.00 Checklist b3 soffit b2 zona 1& 2 B3 & B2 Tower 2 Anwar

2 15.00 - 17.00 Checklist Beam zona 2 L8A Tower 2 Aden

3 15.30 - 16.00 Vertikality Column Lift MRS 01 B5 Midrise Yulyanto

4 16.00 - 17.00 Checklist B2 soffit GF As.A3--A4/TH-D--TH-J B2 & Gf Ramp Pool Anwar

5 16.00 - 17.00 Cheklist Beam L6 Podium Zona 5T L6 Podium Rendy

6 16.00 - 17.00 Checklist formwork All area Tower 2 Rina FS

ARCHITECTURE

1 09.00 - 09.30 Checklist marking bathroom2 parsial 1,2,3,&4 L6 Townhouse Rizal

2 10.00 - 10.30 Tes watertight waterproofing blockwall facade north side, partial 1 L9 ~ L2 Townhouse Eli

Malik (Catur griya)


3 10.30 - 11.00 Ceklist draywall parsial 3 lantai ground floor Gf Townhouse
/Dio

4 14.00 - 15.00 check nut for opening window frame AMP L3 Townhouse Eli

INTERIOR

MEP

NOTE :
1 Please don't carry anny kind of joint inspection unless TOTAL QC inspector signed off internal check list. Sub Contractor MAIN CONTRACTOR
2 TOTALBP CM team to prepare safe acces for planned inspection and fully cooperate during inspection. Perusahaan / Company PT. TOTAL BANGUN PERSADA, Tbk
Nama / Name
LEGEND : Jabatan / Position SM / CM
W ( Owner ) = Witness Point (Mengetahui)
Main Kont = Hold Point ( Menyetujui ) Tanda Tangan / Signature
Sub Contr. = Authority ( Pihak ke-3 )