You are on page 1of 10
Petrofac ® PROJECT: INTEGRATED GAS SURFACE FACILITIES OF RAAGESHWARI DEEP GAS FIELD DEVELOPMENT PROJECT OF VEDANTA LTD. AT BARMER ‘MINUTES OFMEETING DATE 2 11" October 2018 LOCATION _: PIUL Office, Building No. 8, Tower A, DLF Cyber City Gurugram SUBJECT : Techno Commercial Discussion for TANK WORKS on EPC basis ‘MOM NO + J-2041-04-002- PIUL- KKSEPL-MOM-0001 DISTRIBUTION; All Attendes KAMLESH KUMAR SINGH ENGINEERS Petrofac International UAE LLC (PIUL) PVT, LTD, (KKSEPL) Name Designation Name Designation Sr. Manager - | Vinod Kumar Suan ering Birendra Singh Bakkiyaraj N. ‘Manager - Mechanical AP Singh Manager - Planning Monit Jain (Part Period) Ht | Site Manager Nityagopal Deb (Through Telecon) MINUTES OF MEETING ‘MOM NO :J1-2081-07-001- PIUL-KKSEPL-MOM-0001 Subcontract No :JI-2041/04-002 Page 2 of 9 Sl. No. Description ‘Action By | Due date GENERAL, PIUL welcomed Kamiesh Kumar Singh Engineers Pvt. Ltd. (herein after called KKSEPL) for visting PIUL office for Techno Commercial ciiscussion for Tank Works on EPC basis for Vedanta RDG Project. Info KKSEPL confirmed that they have gone through the entire ITB documents which includes, Scope of Work, Technical Specifications, drawings, standards, Price Schedule, Preamble, Scope Split Matrix, General and Special Terms & Conditions, Quality and HSE documents ‘tc. and completely understood the jobs under his scope to be carried ‘out on EPC basis. Info Scope Responsibility Matrix and POSC-1 Points wore discussed. Duly filed in POBC-1 and Scope Split Responsibility matrix as discussed and accepted by KKSEPL is altached here with MOM as Attachment 1. KKSEPL will submit supporting documents required as per POBC-1 latest by 17.10.2018 kxsepL | 17.10.18 TECHNICAL Bt DESIGN & ENGINEERING, SUPPLY, FABRICATION, ERECTION & ‘TESTING, INSULATION & PAINTING. KKSEPL stated that they have gone through the document “Scope of Work & Supply for Storage Tanks supplied in Knocked Down Condition” (Document No. PEC-EN-FRM-M-09605 Rev 0) and Enquiry Requisition for Tanks (Document No. R272PFC-RDG-M-RFQ-002 Rev B1) along with all drawings and specifications, standards etc. and ‘completely understood the Works associated with Tanks. KKSEPL will ‘submit signed and stamped copy of above document as a token of acceptance of the same. Info KKSEPL confirmed that broadly their scopa for Tanks is “Design,

You might also like