Petrofac ®
PROJECT: INTEGRATED GAS SURFACE FACILITIES OF RAAGESHWARI DEEP GAS FIELD
DEVELOPMENT PROJECT OF VEDANTA LTD. AT BARMER
‘MINUTES OFMEETING
DATE 2 11" October 2018
LOCATION _: PIUL Office, Building No. 8, Tower A, DLF Cyber City Gurugram
SUBJECT : Techno Commercial Discussion for TANK WORKS on EPC basis
‘MOM NO + J-2041-04-002- PIUL- KKSEPL-MOM-0001
DISTRIBUTION; All Attendes
KAMLESH KUMAR SINGH ENGINEERS
Petrofac International UAE LLC (PIUL) PVT, LTD, (KKSEPL)
Name Designation Name Designation
Sr. Manager - |
Vinod Kumar Suan ering Birendra Singh
Bakkiyaraj N. ‘Manager - Mechanical AP Singh
Manager - Planning
Monit Jain (Part Period) Ht |
Site Manager
Nityagopal Deb (Through Telecon)MINUTES OF MEETING ‘MOM NO :J1-2081-07-001- PIUL-KKSEPL-MOM-0001
Subcontract No :JI-2041/04-002 Page 2 of 9
Sl. No.
Description
‘Action By | Due date
GENERAL,
PIUL welcomed Kamiesh Kumar Singh Engineers Pvt. Ltd. (herein
after called KKSEPL) for visting PIUL office for Techno Commercial
ciiscussion for Tank Works on EPC basis for Vedanta RDG Project.
Info
KKSEPL confirmed that they have gone through the entire ITB
documents which includes, Scope of Work, Technical Specifications,
drawings, standards, Price Schedule, Preamble, Scope Split Matrix,
General and Special Terms & Conditions, Quality and HSE documents
‘tc. and completely understood the jobs under his scope to be carried
‘out on EPC basis.
Info
Scope Responsibility Matrix and POSC-1 Points wore discussed. Duly
filed in POBC-1 and Scope Split Responsibility matrix as discussed
and accepted by KKSEPL is altached here with MOM as Attachment
1. KKSEPL will submit supporting documents required as per POBC-1
latest by 17.10.2018
kxsepL | 17.10.18
TECHNICAL
Bt
DESIGN & ENGINEERING, SUPPLY, FABRICATION, ERECTION &
‘TESTING, INSULATION & PAINTING.
KKSEPL stated that they have gone through the document “Scope of
Work & Supply for Storage Tanks supplied in Knocked Down
Condition” (Document No. PEC-EN-FRM-M-09605 Rev 0) and Enquiry
Requisition for Tanks (Document No. R272PFC-RDG-M-RFQ-002 Rev
B1) along with all drawings and specifications, standards etc. and
‘completely understood the Works associated with Tanks. KKSEPL will
‘submit signed and stamped copy of above document as a token of
acceptance of the same.
Info
KKSEPL confirmed that broadly their scopa for Tanks is “Design,