You are on page 1of 8
(02-02-2020) RADIOGRAPHIC EXAMINATION REPORT ner EMYPRO |Contract/Job No. - SOLAR, OUR es besen war os TASSRRETT (Ra [Dat aan ae Sac id ee, |ASME BPVC SEC IX, ED. 2019 jl ars NE1-10-QC-EMY-PRO-YG_(G)-00011 srw oueabbore an mn Rone A oon i ir Fooak teins sve screw: T1000 au is ip Ra ie fate 7s tical Density: 2704 [IO Placemant: Source: ¥1 File: Piet ona Tara nm Wad Raton Tar WeldiD | Welder’s1D | Component No. / Drawing No./Line No. | Location Comweratons (Remarks Resi) | Pls PEM 022 WPS NO. EN-11-A-012 O-END SI@13, P@13 Radiography Performed By: Evaluated By Client Representativ AUTPI tame: SUNIL Nome: RAJESH name: ‘Name: et? tev ovr: evel Desir Desanaton seats Banat: 9 Al Soman: [Sinan oate69:05 2030. Date: 03-02-2029) at Date: [Abreviations: : Porosity 2 [Wo sigiean Discontnutes NSD ]Artioc AE [Grind & Rechook ora [stag imouto S_[foat Undeeeut FUC| Guster Porosity CP [single Wal Exposure SWE| 2c of Penetration Lp [Under Et UF [Incomplete Penetation 1 [Sinclowall Viewing SW Root Conca RC [Tungoston Incision TH [Repair [oouble Wail Exoosue OWE! [Leck of Fusion LE |Ex2095 Ponetaion EP _[Resheot S [Dowie Wal viewing DW foreck © [Evirnal Under Gut E-UG|Gean & Rashoot As |Omer inccatons ol Report GPTINOTRTIOOTREV-S (Rev date: 16-05-2070), Diselaimer:This reports valid ony signed and stamped by Leva il of Level Il and read our terms and Conditons. GPTI bate: 02202-2020, =|ReportNo|__GPTVOCA/0023. RADIOGRAPHIC EXAMINATION REPORT [= ee |Cliont: EMYPRO- |Contract/Job No. aa! cation: SOLAR PARK, DUBAI Liab Deserinon war Project: NE 1-700 MW’ CSP#250 MW PV Hybrid project [Base Material Type: 8275 Je Raat RADIOGRAPHY (9-162) [Date of Exanination: 202-2020) Specitcaton! | sce BPVC SEC IX, ED. 2019 peer NE1-10-QC-EMY-PRO-YG_(6)-00011 Accopt. Cite Revision No. [Source to Object Distance: ‘0mm Scraen THK FPo-0495 wm BIPD- 0425 mm Source sie of Objet to Fl emme.Smme7.Smm [Ne af Eeposuros T_[Nectfim per Cassote: [1 [souce! FS Size 3OX25NM [Exposure Tine 7 MINS Fim wanafacurer: KODAK [RT Teciique SWE cctope Type ay Vohage R192, ar Type ASTM 1B [Optical Density: 2704 Qi Placement: Source: Film: [cians Proces ‘SMAW ase Material THK: mm iameter/ Lena Length: 250mm [Weld Reinforcement Tommet Sram {Sensitivity ‘ASME SEC VT-276 Eseential Wire: 8th Visible Wire: Tih | weidio | Welde’'s 0 | Component No. Drawing No./Lne No, | Lecaton | Observatons / Remarks —_fent econ | Reject PLT | PEMO2 | wesnosemarao | GEND| nso S| (ee eles SST Tae PH EEE aoe ae Spee eee Heed ETE ee es HEE See tee HEI i a ae ojo | at o|o | See ee o};o danse eee eee aed a go} a] oe By ate saa — — oy} a leat Bee SHH suas o} gd Hie —_ aie a ees See ee eee | #EE cere ee __ ait olo ree Ee ere cee —_ eee ee rat (aea]eat ane ct TSE ST aye ans Hae cee —_ o7 ao oe PEE _ ay PEPEHEH PE ee ed trl Radiography Performed By: _Evaluated By Client Representative: AIL TPL 4 Name: SUNIL INeme: RAJESH Name Name | ta Lever ovr: tevelay eimai: Designate | sonore: "3/1 ‘signatice Stonaue: | [Date: 03-02-2020 ~__ |Date: Pepe eee aa STeueseesai | [No Significant Disconnatios NSO|Avtfoc AF [ein & Reshoot crs] [Root Undercut, RLUC| Cluster Porosity OP [Single Wall Exposure _ SWE | oder Et ‘UF [Incompicte Penetration LE [single wat! Viewing SW © [Tungeston neusion T_ Reset 8 [oovbie Wall Exposure DWE Excess Penovaton EP_[Reshoot RS [oouvie Wal Viewing OW Eternal Undor Gt Ec |[Glean & Rashoot loner tnicaons Report GPTINOTRTIOOT REV-O (Rev date: 16052070) Disclaimer:This partis valid only signed and siamped by Laval i of Level Il and read aur terns and Conditions | RADIOGRAPHIC EXAMINATION REPORT gerugcnitee cient EHIVPRO onralob No coca SOLAR PARK, DIBA Sb Destin war reat) RE 1-700 NW GSP+250 NW PY Hyd prcoet[Baso Maar Type e216. Spode Jase BPVE SEC WED, 2019 RT Prooedire Nos | yey-t0-ac-eMy-PRO-YG (@)4n0H4 erent net aes Tem som TK Reena EPO Oreo aren KODAK Toco SWE Fiprot fe Fi Aaa TOAD [ei SW [Optical Density: 2704 12} Placement: Source: M1 Film: area Ta 2 Recon Tame am Grau | Wouwsio | onpecertts/Dendng a /UveNa, | uocion | Otveretom Roma | Accept | Reject mo PEM 006 WPS NOZEM.tTAOI2 P@0,cP@S aw | oO q a Oo a oO t o|oa a o Qa o a o Oo Oo Oo Oo o|0 a Oo ee | eee a oo | a Oo oj; a] a a a Oo Radiography Performed By: _ Evaluated By: Client Representative: ANLTPL Nerve: SUN Name: RAJESH) Name: Name: we Ta) Passat Cairn |Signature:. i? ‘Signature: Signature: [Bate: 08.02.2008 J Date Date | Porosty P_|No Significant Discontnuities Nb [Avttact| AE [Grind & Reshoot eRe] Shion froounawan clot Poa cp [sno Wat gone Sl [Root Concavity_ RC |Tungeston Inclusion. T_|Repair R_|Double Wail Exposure __ DWE! Rapor OPTINDTRTIOO REV-O (Rev date: 16-06-2070) Discaimer‘This caportis valé only signed and stamped by Level er Lovell and read our terms and Conditions ok GPT! ate: 02.02-2020 RADIOGRAPHIC EXAMINATION REPORT = =} : ae i EEN pope: o1 OF 01 [Cliont: EMYPRO |Contract/Job No. = Cocation: ‘SOLAR PARK, DUBAT [Job Description: war Project: [NE 1-700 MW CSP#250 MV PV Hybiid project [Base Matoral Typa: S276. Jt athe RADIOGRAPHY (R102), Dato of Examination: 02-02-2020 ‘Speafcaton 7 IRT Procedure No. at orto [ASME SAVE SEC A ED. 2010 eit NE#-10-QC-EMY.PRO-VG_(G)-00011 Source to Obee Disanon som [Saeen TH FPo=0185 mm 8: PO- 012m Source ste of Object o Fs “Temme.mm+7.Smm [No of Exposures: 1_[Neotfimporcassener [1 [Source FS Siew ‘.0X2.5NM Exeosure Tine T MINS Fim Menace KODAK eT Technique SWE [ype of to Fim: "RAAOO 10X40 Menge wv cotope Type X-Ray Vakage R12 aT ASTM 1B [Optical Density: 2704 |1Q| Ptacement: ‘Source: Film: [Prong Process ‘SMAW Base Material THC "émm [vameter/ nat Length: 250mm [ied Relnforcomert: 1Sman+1.Sram Sensi ASME SEGV T-270 Eezontal We ah Wabi Wire Ti Rest wedio | Welders | Componenttio.! Drawing io./Lino No. | Locaten | Obsorvatons /Remarks ee Accent | Reject pis | PEMO03 WES NOZEWETI-AOTR o-END Nso. mo : : [oOo |) o oo oo - ojo ojo o |o eee o/;o ofo 7 avo ao/[o o]o | g/o jesse ee] _a Te 7 ofa oo ‘Radiography Performed By: Evaluated By: Client Representative: AL/TPI Name: SUNIL: |Nomer RAMESH Name: Name: a ei televteveua mio: Cite Serer fl ‘Sirelurs fh ‘Signture: Signature: co.02.3020 Date 03-02-3920 Date Date |Abreviations: [Ne Signiteant Discontnuios Neb pwtfect, ‘AF [ering & Reshoot Stag inclusion ‘St froot undereut R-UC|Ouster Porosity CP [single Wall Exposure ack of Panevan uP [Under it UF [incomplete Penevaton 1? [Singtewat vewng sw Root Concaviy [Tungesion incusion T_[Repair fooutie Wat Exposure [Lack of Fusion UF |Excess Penetration EP_[Reshoot RS |Double Wall Viewing: Extenal Undor Cut E-vc|ctoan & Recheck crs|oter icscations Ropar GP TINDTIRTIOO REV-3 (Rev dale: 16052070) Disclaimer:This reports valid only If signed and stamped by Lovell or Lovell and read our terms and Conditions “RADIOGRAPHIC EXAMINATION REPORT = 22} EMYPRO- |Contract/Job No. = SOAR PARK, BUA Nob Dsainon wat pcs | NE 1 TOON C8250 NW PY Hybipreet [Base Mato Typ a6 Speciicaion! “tasaae BPVC SEC IX, ED. 2018 Pea NE1-10-QC-EMY-PRO-YG_(G}-00011 cept cite even No: Sass Gj Dan: em soeon TC [Saas am SPR Oe ir trator KODAK Freon Swe Fase otei Fa; oir sw soap i ay ag Teta ia ie STH [Optical Density: 2704 [IQ1 Placement: Source: WI Film: la Fone SA ass vata TC ‘Bam lancer Tange zetnen Wad Rare Taint Weld ID ‘Woilder’s ID ‘Component No. / Drawing No. Line No. | Location Observations / Remarks He eee Fezapt| Rete PL4 Pemoot | WPS NO. EM-11-A-012 0-END NSD. ww oO ea = = FEE | HEH o; a [Eee eee EEE ee eC ee ae oja | He Eee Hoe HEE Pre Ne j eerie ae toe rola eer Tir oo | zee re o7o] ae o; oa au} oOo] _ o o - See | oO | oO To eb — Pe jar 4 HEE Eee jo | oO SEEEEH Eee EEE HEE HEV Ee | Radiography Performed By: Client Representative AICTPL | [Named SUNIL) IName RAJESH), <> |Name: 'Name: lever Lever lovelifLevelas SY [Gecignation: (Designation: sinatoeoe A! Sionatire: 97 |- 4 (Signature: Signature: soz amotio f0” —— low — oat : | Abreviations! Porosity P _|No Significant Discontinuties NSD [Arifact AF [Grind & Reshoot RS} | Sig ncn St |Root underout F.U0|ohuster Poroly CP |singloWal Exposure _swe| | Root Concavity RC [Tungestan inclusion TH [Repair R [Double Wall Exposure __ DWE| [act use UF [Bes Peeton oF Reso 7 [nas Wa vent D1 Repon OPTINOTRTIOOT REV [Rov date: 16-05-2070) Digolalmer:This reports valid oni if signed and stamped | by Level Il or Lave Il and read our terms end Conditions | GPTI Bae Tema RADIOGRAPHIC EXAMINATION REPORT = S|)“ : DIC ON SE Poe o10Fo1 ete ENERO Gonvecob Ne = recat SOLA PAR DUBAI Job Deseo War rows, | NE 1-700 MW CSPA260 MW PY Hybrid project Bate Mate Type sAst6 GR7O Ratio RADIOGRAPHY U2) Bato ofarinaton SeeEaD Speen Ts finer espe Ponaton 1P engi watVevng se] ac [ungese neon TT Reps footie Wal Boros ove LF [esos Pencatin EF [Rosot Bs [bate Wal Vowin ov _[exonaltnas cx Coma chon casfone nesta a Ropor- GP TINDTARTIOOTREV-9 (Rev date: 1605-2070) Disclaimec:This report is valid only If signed and stamped by Level lor Level and read our terms and Conditons: yar GPTI es ann 0008 RADIOGRAPHIC EXAMINATION REPORT = &&@)}—“UCAD* : 2 Ea pee th Tei [Page: 01 OF Ot [Client EMYPRO- |ContractiJob No. = cca SOLAR PARC DUBAL Neb Goseipton war project | NE 1-700 NW CSP#250 NW PV Hybrid pret [Base Matera! Typ: SASI6 GRO aoa FRDIOGRAPAT RT) Date rarinaon warm Specitcation | |ASME BPVC SEC IX, ED. 2019 er preceding He NE1-10-QC-EMY-PRO-YG_(G)-00011 enn tora vision No [roe Grp Ds jam secon [ape oae me SPO ero ie of et Fh sa agp Serene 1 footwipe cones [7 Soro FS Se 3.02 Sh os Tne MINS Fir Nenvtxtror TeODAK a Teche SWE pipe of Fn AO, 1D nig wv osu Tipe ay Volags R02 ioe ame {Optical Density: 2704 QI Placement: Source: M1 Film: tang ross FOAW Soe Natio THK am Bret Lat Tag 250m Wel Retro Tami Sm Winsio | waersi | conponatno. roving N./tneNe. | Lesion] Obsanaton/Renans |= Se PL2 PEM 022 ‘WPS NO.: EM-11-8-094 O-END NSD a a ed o|ja ft ses EEE EEEEE Eee ana oe a Oo oo] | oo) 0] Oo Oo EB a oO L ao/o a o | oO a a a ao Oo a Oo oho 7 ojo ojo Radiography Performed By: Evaluated By: Client Representative: ALLTPL . ave: RES ere ere: ‘Covel: CEVELAT [Designation: [Designation | signature: | Signature: |Signature: [pas oa-oiare0? Baws cate 7 a Spc Dintnutes 60a 7 [ainda Resioot or oot Undo BC Custer Poesy GF [ge Wal Expoous SWE nr Fa UF mpi Penerton Te [ong wal Veg Turpason ron 7c [oo Wa Egos Ovi oss Peretaton EP [Roost BS [Dae Wal Vaning OW taal Unee at ian Basico ae teaaeereettee Rapa GPTINOTRTOOT REVS (Rev date: 16052070) Discialmer:Thie raprtisvalié only signed and stamped by Level Ill or Level Il and read our terns and Conditions oe GPTI fe won “RADIOGRAPHIC EXAMINATION REPORT = S| I . S Sees Ss Page: 01 OF OF [Client: EMYPRO- |Contract/Job No. = ceaiow SOLAR PARK DUBAI Nob Deooipton: war project | NE 1700 mw CSP1250 NW PV Hybid project [Base Matera Type SABI6GRTO aoa RADIOGRAPHY (R122) Dae annaton CORD Speeitication / |ASME BPVC SEC IX, ED. 2019 ee eearaae Ne NE1-10-QC-EMY-PRO-YG_(G)-00011 event. Gta vison No. [saree et Dasa eon Soon ime orae mene PO Oa Sure de of Oe Fi gee ace ane ce eee 1 [rootwiporcrsanme [7 SocoT FS Si 302 St Espa Tne eMINS Fin Naroee KODAK ie SWE Fipearte in 00100 ong: SHV spe Type ay Ves TRIG ial errr [Optical Density. 2704 101 Placement: Source: MI Film: Wein Pros FOAM Bos Nate HR 2m Banat cvah Tags Zeta Rtrconnt Tame 6am viausio | wawersio | CmporenNo./Drming No /tneNo, | tzcaton ] Obsenaions/Rerats |, Rot econ | Reet PLA PEMO2i | __ WPSNO:EM-11.A.014 “OENO | NSD | @|o : o/}o a Oo | ojo a oO a Oo aE a o oat | o|o a Oo | a o a o a o [ a oO ao|/o ie Siar Hee eee eee an Tajo =e cae Ee See Pe Pa Hee (Evaluated By: Glient Representative: AULTPL INainer RAJESH Name: Name: Level: LEVEL i] Designation: (Designation: sist if AR [Soret ion: pantiatiat “lowe me [Porosity P_|No Significant Discontinuitios NSD |Artifact AF |Grind & Reshoot GRS| feckotPonaaton ur nwerra UF [enol Pentaien 1p [singe vat oung sw Fo Coen Be eeRaeear asc 71 fepar 1 [bois Wat spose owe ern Gece cee assent 5 [boule Wal vowing ow Ropart GPTINOTATIOO REVS (Rev date: 16052070) DieclimerThis eportic valid only elgnod and stamped by Level of Levelland read our terms and Conditions

You might also like