SHAFT No 2 DESIGN
0411.0021

HEADFRAME CONSTANT PRESSURE


WATER BOOSTER PUMP SET
SPECIFICATION

Document No
1118-55-SPE-3017 Rev E

Prepared by: Pierrie Thiart – Project Engineer


Alexander Russell – Lead Mechanical Engineer
HEADFRAME CONSTANT PRESSURE WATER BOOSTER PHASE 2 – NO 2 SHAFT DESIGN
PUMP SET SPECIFICATION

Table of Contents
1.0 INTRODUCTION ...........................................................................................................4
2.0 SCOPE OF WORK .......................................................................................................4
3.0 DUTY DESCRIPTION ...................................................................................................4
4.0 SCOPE SUPPLY ..........................................................................................................5
4.1 Inclusions ...........................................................................................................5
4.2 Exclusions ..........................................................................................................6
5.0 TECHNICAL REQUIREMENTS ....................................................................................6
5.1 Pumps and Pump Configuration .......................................................................6
5.2 Piping and Fittings .............................................................................................7
5.3 Pressure Accumulator .......................................................................................7
5.4 Electrical Motor ..................................................................................................7
5.5 Motor Control Centre .........................................................................................7
5.6 Noise Levels .......................................................................................................8
5.7 Bearings and Lubrication ...................................... Error! Bookmark not defined.
5.8 Nameplates .........................................................................................................8
5.9 Lifting and Handling Requirements ..................................................................8
6.0 MARKING, IDENTIFICATION, PACKAGING AND PRESERVATION ..........................8
7.0 INSPECTION AND TESTING .......................................................................................8
8.0 RELATED DOCUMENTS AND DRAWINGS ................................................................9
9.0 APPLICABLE STANDARDS ......................................................................................10
10.0 APPENDICES .............................................................................................................11

List of Tables
Table 1: Related Documents ................................................................................................................... 9
Table 2: Applicable Drawings .................................................................................................................. 9
Table 3: Mongolian Standards .............................................................................................................. 10
Table 4: Peoples Republic of China Standards..................................................................................... 10
Table 5: Mechanical Engineering Design Codes .................................................................................. 10

Document No 1118-55-SPE-3017 Rev E File Path PW: 12.04.01 Page 3 of 11


HEADFRAME CONSTANT PRESSURE WATER PHASE 2 – NO 2 SHAFT DESIGN
BOOSTER PUMP SET SPECIFICATION

1.0 INTRODUCTION
This specification covers the minimum requirements for the supply of a constant
pressure water booster pump set and associated equipment which will be installed
on elevation EL. -4.100m of the Oyu Tolgoi Shaft No 2 headframe.

The Oyu Tolgoi mine complex is situated 550 km South of Ulaanbaatar, Mongolia’s
capital, in the aimag (Province) of Ömnögovi, the South Gobi region of Mongolia
which forms the border with China.

2.0 SCOPE OF WORK


The scope of work includes the labour and materials for design, manufacture,
corrosion protection, quality inspection, testing and supply as well as the
submission of supporting documentation for the constant pressure water booster
pump.

This scope of work is for the complete supply of new equipment and unless
explicitly stated under the exclusions, the Owner will hold the Supplier responsible
for furnishing all the equipment as detailed in this document.

The above work will comply with the requirements of the latest version and
addenda of the following publications:-
 Mongolian occupational safety and health regulations for underground
mining
 Ontario Canada occupational health and safety act, RRO 1990,
Regulation 854 – Mines and mining plants

The most onerous statutory requirements will take precedence. Where materials
and workmanship are not specified herein, or covered by recognized standards, the
highest quality consistent with normal practice in the industry will be adhered to.

Compliance with this specification does not alleviate the Supplier of the
responsibility for furnishing the domestic constant pressure water booster pump
and the relevant associated accessories of adequate design suited to meet
operating requirements at the specified service conditions. Nor does it relieve the
Supplier of the responsibility of furnishing the domestic water booster pump
assembled and prepared for shipment in a professional manner.

Irrespective of any statements to the contrary in this specification, the Supplier will
satisfy himself that the equipment selected will be capable of fulfilling the duty as
specified.

3.0 DUTY DESCRIPTION


The Oyu Tolgoi Shaft No 2 will be supplied with Raw water from the utilidor

Document No 1118-55-SPE-3017 Rev E Page 4 of 11


HEADFRAME CONSTANT PRESSURE WATER PHASE 2 – NO 2 SHAFT DESIGN
BOOSTER PUMP SET SPECIFICATION

From the utilidor tie-in point water is then supplied to the washrooms in the
following areas:-
 Service Hoist deck washroom (EL +63.500m)
 Men’s South collar house washroom (EL. 0.000m)
 Women’s South collar house washroom (EL. 0.000m)
The pressure from the utilidor tie-in point is sufficient to provide domestic water to
the washrooms located on Collar level (EL. 0.000m).

In order to provide water to the washroom located on the Service Hoist deck, a
constant pressure booster pump set will be installed on elevation EL. -4.100m in
the South/West perimeter of the headframe.

The constant pressure booster pump will be required to pump water to the Service
Hoist deck washroom and regulate the line pressure to ensure that the fittings are
not exposed to excessive pressure.

4.0 SCOPE SUPPLY


The scope of supply will be for a complete skid mounted pump set consisting of the
following major components:-
 Two (2) domestic water booster pumps (one duty and fully installed
standby)
 One (1) diaphragm pressure tank
 One (1) mounting base frame/skid (both pumps mounted on the single
skid)
 One (1) motor control center (MCC) complete with indicator, push
buttons, lockouts, and control unit.

4.1 Inclusions
In addition to the items listed in Section 4.0, the supply will include but not be
limited to the following items:-
 Selection of the appropriate pump and motor set to satisfy the require
duty as specified
 Fabrication and supply mounting base frame
 Pump and motor couplings and coupling guards
 Isolation valves and non-return valves local to the pump set
 Pressure indicators and pressure transmitters

Document No 1118-55-SPE-3017 Rev E Page 5 of 11


HEADFRAME CONSTANT PRESSURE WATER PHASE 2 – NO 2 SHAFT DESIGN
BOOSTER PUMP SET SPECIFICATION

 Interlinked piping, piping manifold (suction and delivery), mating flanges


(where applicable), gaskets and flange bolts
 Foundation holding down bolts complete with washers, nuts, packers and
shims for all pumps and motors
 Fixing bolts for all equipment mounted to the base frame complete with
washers, nuts, packers and shims for all pumps and motors
 Electrical and instrumentation wiring local to the pump set
 Performance testing
 Special equipment required for the commissioning of the pump set after
installation (if applicable)

4.2 Exclusions
The following items are not included in this scope and will be supplied by the buyer
or others:-
 Field erection labour and supervision
 Civil works
 Lubricants with the exception of those required for shop assembly and
testing

5.0 TECHNICAL REQUIREMENTS


The equipment and materials will be of heavy duty construction as applicable to
mining industry applications with a nominal project design life of 20 years, based on
24 hour per day, 365 days per year operation.

The duty requirement for the domestic water booster pump set has been included
in Error! Reference source not found. of this document.

5.1 Pumps and Pump Configuration


The constant pressure water booster pump set will consist of two (2) pumps
mounted on a common base frame. The motors driving the pumps will be the
directly coupled type and will also be mounted on the common base frame.

The pump casing will be stainless steel and no other material will be considered
due to the life expectancy of the pumps.

The pump set will be configured duty/standy operation. The pumps set will have a
common suction and discharge manifold equipped with the required valves and
fittings to ensure the operation of the system as specified.

Document No 1118-55-SPE-3017 Rev E Page 6 of 11


HEADFRAME CONSTANT PRESSURE WATER PHASE 2 – NO 2 SHAFT DESIGN
BOOSTER PUMP SET SPECIFICATION

5.2 Piping and Fittings


The pump set will be supplied complete with interlinked piping on the suction and
discharge end of the pump.

As far as practically possible the piping and associated fittings will be supplied in
accordance with line class specification G1A as indicated in specification SP-50-
001.

The Supplier will need to make provision in his design to mate the pump set suction
and delivery manifold to the flange of the rubber bellows. These will be 50 NB Class
150 ANSI B16.5 A105 flanges.

5.3 Pressure Accumulator


The pump set will be supplied complete with a pressure accumulator unit. The
pressure accumulator will ensure that the pump does not operate continuously.

The pump set will charge the accumulator to a pre-set pressure. Once the pre-set
pressure is reached, the pump will switch off. The accumulator will retain pressure
in the line.

The line pressure will reduce with the use of water in the washroom and the pump
set will be required to switch on when the pressure accumulator reaches the
minimum pre-set pressure.

The discharge pressure of the accumulator should be controlled by the unit. The
maximum accumulator charge pressure will be limited to 1034 kPa as this is the
limiting design pressure for the pipe line class G1A.

5.4 Electrical Motor


Electrical motor will be in accordance with the requirements as set out in
specification SP-65-008 as referenced in Section 8.0 of this document.

5.5 Motor Control Centre


The motor control centre (MCC) will be designed in accordance with the
requirements as set out in specifications SP-65-001, SP-65-016 and SP-70-001 as
referenced in Section 8.0 of this document.

As a minimum the electrical control panel will be fitted with the following:-
 Isolation and overload protection Reference to incor-
 Start/stop push button rect Phase 1 specs.
RSV to refer to Phase
 Emergency stop complete with keyed lockout 2 specs

Document No 1118-55-SPE-3017 Rev E Page 7 of 11


HEADFRAME CONSTANT PRESSURE WATER PHASE 2 – NO 2 SHAFT DESIGN
BOOSTER PUMP SET SPECIFICATION

 Run ready indication light


Reference to incor-
 Running indicator light rect Phase 1 specs.
 Stop indicator light RSV to refer to Phase
 Trip/fault indication light 2 specs

 Pump selection indicator light


Indication lights, push buttons and other indicators are to be labelled accordingly
and the control panel will be mounted on the same skid as the pump set.

The control panel IP rating will be in accordance with the requirements as set out in
specification SP-65-016 referenced in Section 8.0 of this document.

5.6 Noise Levels


The noise levels emitted by the pump set during operation will be restricted to 85dB
when measured at a distance of 1 m from the pump set measured in any direction.

This is in accordance with the requirements as set out in specification SP-55-001


referenced in Section 8.0 of this document.

5.7 Nameplates
As far as practically possible, each proprietary item is to be fitted with a stainless
steel name plate. As a minimum, the name plate will be engraved in English and
Mongolian and contain the required information as referenced in Section 2.3 of
specification SP-55-001.
5.8 Lifting and Handling Requirements
The pump set and all the relevant components will be designed with a suitable
means of lifting to assist with the installation and maintenance of the pumps and
associated ancillary equipment.

6.0 MARKING, IDENTIFICATION, PACKAGING AND PRESERVATION


Marking, identification and packaging of the equipment for shipping will be in
accordance with the requirements of document SP-55-001 as referenced in Section
8.0 of this document.

Preservation of the equipment for long term storage on site is to be adhered to in


strict accordance with the requirements as set out in specification SP-55-001.

7.0 INSPECTION AND TESTING


Inspection and testing will be done in accordance with the relevant standard and
specifications as referenced in Section 8.0 and Section 9.0 of this specification.

Document No 1118-55-SPE-3017 Rev E Page 8 of 11


HEADFRAME CONSTANT PRESSURE WATER PHASE 2 – NO 2 SHAFT DESIGN
BOOSTER PUMP SET SPECIFICATION

No equipment will be considered complete until accepted by the Buyer and the
Engineer. It will be the responsibility of the Supplier to establish examination
procedures in accordance with the requirements of the quality assurance procedure
and have all examinations performed by qualified competent personnel.

The Supplier must include a quality plan for the execution of the work to be
performed by or on behalf of the Supplier. The quality plan must identify the
anticipated interfaces between the Supplier’s plan and possibly the Buyers Third
Party Inspection Authority. The quality Plan must also indicate the test / inspection
certificates that will be produced.

8.0 RELATED DOCUMENTS AND DRAWINGS


The documents as listed in Table 1 form an integral part of this specification and it
is recommended that the Supplier reads these documents in conjunction with this
specification prior to preparing his tender submission.

Table 1: Related Documents

Document Number Document Title


DC-10-001 General Site Conditions
DC-55-001 Mechanical Design Criteria
DC-65-001 Electrical Design Criteria
DC-70-001 Instrumentation Design Criteria
SP-50-001 Piping Line Class
SP-55-001 Standard Requirements for Mechanical Equipment
SP-55-002 Painting Specification
SP-55-003 General Welding
SP-65-001 Electrical Requirements for Mechanical Equipment
SP-65-002 Electrical Design Standards
SP-65-016 Low Voltage Motor Control CentreReference to incor-
SP-65-008 Low Voltage Induction Motor rect Phase 1 specs.
RSV to refer to Phase
Instrumentation Requirements for Mechanical
SP-70-001 2 specs
Equipment Drawings

The drawings listed in Table 2 are issued for INFORMATION ONLY and are
included in Error! Reference source not found.of this specification.

Table 2: Applicable Drawings

Drawing Number Drawing Title


1118-25-I1-3160_0 Domestic Water Process Flow Diagram
1118-25-J1-3160_0 Domestic Water Process and Instrument Diagram

Document No 1118-55-SPE-3017 Rev E Page 9 of 11


HEADFRAME CONSTANT PRESSURE WATER PHASE 2 – NO 2 SHAFT DESIGN
BOOSTER PUMP SET SPECIFICATION

9.0 APPLICABLE STANDARDS


The standards and codes listed in Table 3, Table 4 and Table 5 will be applicable
for the design and supply of the headframe domestic water booster pump as
indicated in this specification.

Table 3: Mongolian Standards

Standard Number Standard Title


CNR 2.09.12-87 Hygiene Requirements for Industrial Buildings
Mongolian Standards for Industrial discharge to
MNS 4843-2000
Surface Waters
SNIP 11.12.77 Designing Protection from Noise
SNIP II-M.1-71 Master Plans of Industrial Enterprises

Table 4: Peoples Republic of China Standards

Standard Number Standard Title


Code for Design of General Plan of Industrial
GB50187-93
Enterprises
Code for Design of Building Water Supply and
GB50015-2003
Drainage
Code for structure Design of Water Supply and
GBJ69-84
Sewerage Engineering
GBJ102-87 Code for Design of Industrial Circulating Water System
GB5749-1985 Sanitary Standard for Drinking Water

Table 5: Mechanical Engineering Design Codes

Code Description
ANSI American National Standards Institute
ASME American Society of Mechanical Engineers
ASNT American Society for Non-destructive Testing
ASTM American Society for Testing Materials
AWS American Welding Society
HI Hydraulic Institute
IFI Industrial Fasteners Institute
ISO International Organization for Standardization
MSS Manufacturer's Standardization Society
NACE National Association of Corrosion Engineers
PFI Pipe Fabrication Institute
ANSI American National Standards Institute

Document No 1118-55-SPE-3017 Rev E Page 10 of 11


HEADFRAME CONSTANT PRESSURE WATER PHASE 2 – NO 2 SHAFT DESIGN
BOOSTER PUMP SET SPECIFICATION

10.0 APPENDICES
The appendices as listed below form an integral part of this specification:-

APPENDIX (I) Operational Requirements Data Sheet


APPENDIX (III) Drawings
APPENDIX (III) Form - E212 – Supplier Drawing and Data Commitment

Document No 1118-55-SPE-3017 Rev E Page 11 of 11