You are on page 1of 21

Upto Upto

Installation Installation Upto Date Upto Date This Bill


Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

1.1 MAIN LT PANEL (OPD+DIANOSTIC BLOCK PHASE-1)(LT PANEL ROOM GROUND


FLOOR)

MAIN LT PANEL (LT PANEL ROOM) described as above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.2 MDB - 1 (LIFT PANEL BLOCK-A& B) (LIFT M/C ROOM) (TYPICAL FOR MDB-2 (LIFT
PANEL BLOCK-C&D) (LIFT M/C ROOM))
MDB - 1 (LIFT PANEL BLOCK-A& B) (LIFT M/C ROOM) (TYPICAL FOR MDB-2 (LIFT
PANEL BLOCK-C&D) (LIFT M/C ROOM)) described as above Set. 2 1800 3600
Installation @ 90% 1620.00 2 3,240 2 3,240 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.3 MDB-3 (UPS INPUT PANEL) (UPS ROOM) (GROUND FLOOR)


MDB-3 (UPS INPUT PANEL) (UPS ROOM) (GROUND FLOOR) described as above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.4 MDB-U1 (UPS OUTPUT PANEL) (UPS ROOM) (GROUND FLOOR)


MDB-U1 (UPS OUTPUT PANEL) (UPS ROOM) (GROUND FLOOR) described as above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.5 MDB - LRM1 (LIGHTING PANEL) (ELECTRICAL ROOM) (For Block A & B)
MDB - LRM1 (LIGHTING PANEL) (ELECTRICAL ROOM) (For Block A & B) described as
above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

Page 1 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

1.6 MDB - LRM2 (LIGHTING PANEL) (ELECTRICAL ROOM )(TYPICAL FOR (MDB- LRM3))
(For Block A & B)
MDB - LRM1 (LIGHTING PANEL) (ELECTRICAL ROOM) (TYPICAL FOR (MDB-LRM2 &
LRM3)) (For Block A & B) described as above Set. 2 1800 3600
Installation @ 90% 1620.00 2 3,240 2 3,240 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.7 MDB - PRM1 (POWER PANEL) (ELECTRICAL ROOM) (For Block A & B)
MDB - PRM1 (POWER PANEL) (ELECTRICAL ROOM) (For Block A & B) described as
above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.8 MDB - PRM2 (POWER PANEL) (ELECTRICAL ROOM) (For Block A & B)
MDB - PRM2 (POWER PANEL) (ELECTRICAL ROOM) (For Block A & B) described as
above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.9 MDB - PRM3 (POWER PANEL) (ELECTRICAL ROOM) (For Block A & B)
MDB - PRM3 (POWER PANEL) (ELECTRICAL ROOM) (For Block A & B) described as
above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.10 MDB - URM1 (LIGHT& POWER PANEL) (ELECTRICAL ROOM) (For Block A & B)
MDB - URM1 (LIGHT& POWER PANEL) (ELECTRICAL ROOM) (For Block A & B)
described as above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.11 MDB - URM2 (LIGHT& POWER PANEL) (ELECTRICAL ROOM) (For Block A & B)
MDB - URM2 (LIGHT& POWER PANEL) (ELECTRICAL ROOM) (For Block A & B)
described as above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

Page 2 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

1.12 MDB - URM3 (LIGHT& POWER PANEL) (ELECTRICAL ROOM) (For Block A & B)
MDB - URM3 (LIGHT& POWER PANEL) (ELECTRICAL ROOM) (For Block A & B)
described as above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.13 MDB - ARM1 (AHU'S & VENTILATION FANS) (ELECTRICAL ROOM) (For Block A & B)
MDB - ARM1 (AHU'S & VENTILATION FANS) (ELECTRICAL ROOM) (For Block A & B)
described as above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.14 MDB - ARM2 (AHU'S & VENTILATION FANS) (ELECTRICAL ROOM) (For Block A & B)

MDB - ARM2 (AHU'S & VENTILATION FANS) (ELECTRICAL ROOM) (For Block A & B)
described as above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.15 MDB - ARM3 (AHU'S & VENTILATION FANS) (ELECTRICAL ROOM) (For Block A & B)

MDB - ARM3 (AHU'S & VENTILATION FANS) (ELECTRICAL ROOM) (For Block A & B)
described as above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.16 MDB - LRM1 (LIGHTING PANEL) (ELECTRICAL ROOM) (TYPICAL FOR LRM2 & LRM3)
(For Block C & D)
MDB - LRM1 (LIGHTING PANEL) (ELECTRICAL ROOM) (TYPICAL FOR LRM2 & LRM3)
(For Block C & D) described as above Set. 3 1800 5400
Installation @ 90% 1620.00 3 4,860 3 4,860 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.17 MDB - PRM1 (POWER PANEL) (ELECTRICAL ROOM) (TYPICAL FOR PRM2 & PRM3)
(For Block C & D)
MDB - PRM1 (POWER PANEL) (ELECTRICAL ROOM) (TYPICAL FOR PRM2 & PRM3)
(For Block C & D) described as above Set. 3 1800 5400
Installation @ 90% 1620.00 3 4,860 3 4,860 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

Page 3 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

1.18 MDB - URM1 (LIGHTING & POWER PANEL) (ELECTRICAL ROOM) (TYPICAL FOR
URM2 & URM3) (For Block C & D)

MDB - URM1 (LIGHTING & POWER PANEL) (ELECTRICAL ROOM) (TYPICAL FOR URM2
& URM3) (For Block C & D) described as above Set. 3 1800 5400
Installation @ 90% 1620.00 3 4,860 3 4,860 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.19 MDB - ARM1 (AHU'S & VENTILATION FANS) (ELECTRICAL) (TYPICAL FOR ARM2 &
ARM3) (For Block C & D)

MDB - ARM1 (AHU'S & VENTILATION FANS) (ELECTRICAL) (TYPICAL FOR ARM2 &
ARM3) (For Block C & D) described as above Set. 3 1800 5400
Installation @ 90% 1620.00 3 4,860 3 4,860 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.20 MDB - LRM1 (LIGHTING PANEL) (ELECTRICAL ROOM) (TYPICAL FOR LRM2) (For
Radio Diagnosis / Chemotheraphy)
MDB - LRM1 (LIGHTING PANEL) (ELECTRICAL ROOM) (TYPICAL FOR LRM2) (For Radio
Diagnosis / Chemotheraphy) described as above Set. 2 1800 3600
Installation @ 90% 1620.00 2 3,240 2 3,240 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.21 MDB - PRM1 (LIGHTING PANEL) (ELECTRICAL ROOM) (TYPICAL FOR PRM2) (For
Radio Diagnosis / Chemotheraphy)
MDB - PRM1 (LIGHTING PANEL) (ELECTRICAL ROOM) (TYPICAL FOR PRM2) (For
Radio Diagnosis / Chemotheraphy) described as above Set. 2 1800 3600
Installation @ 90% 1620.00 2 3,240 2 3,240 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.22 MDB - URM1 (LIGHTING & POWER PANEL) (ELECTRICAL ROOM) (For Radio
Diagnosis / Chemotheraphy)
MDB - URM1 (LIGHTING & POWER PANEL) (ELECTRICAL ROOM) (For Radio Diagnosis /
Chemotheraphy) described as above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.23 MDB - URM2 (LIGHTING & POWER PANEL) (ELECTRICAL ROOM) (For Radio
Diagnosis / Chemotheraphy)

Page 4 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

MDB - URM2 (LIGHTING & POWER PANEL) (ELECTRICAL ROOM) (For Radio Diagnosis /
Chemotheraphy) described as above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.24 MDB - ARM1 (AHU'S & VENTILATION FANS) (ELECTRICAL ROOM) (For Radio
Diagnosis / Chemotheraphy)
MDB - ARM1 (AHU'S & VENTILATION FANS) (ELECTRICAL ROOM) (For Radio Diagnosis
/ Chemotheraphy) described as above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.25 MDB - ARM2 (AHU'S & VENTILATION FANS) (ELECTRICAL ROOM) (For Radio
Diagnosis / Chemotheraphy)
MDB - ARM2 (AHU'S & VENTILATION FANS) (ELECTRICAL ROOM) (For Radio Diagnosis
/ Chemotheraphy) described as above Set. 1 1800 1800
Installation @ 90% 1620.00 1 1,620 1 1,620 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

1.26 MDB - AYUSH Set. 1 1800 1800


Installation @ 90% 1620.00 3 4,860 3 4,860 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

2 DISTRIBUTION BOARD

2.1 Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution
board, 240 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar,
earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But
without MCB/RCCB/Isolator)

a 6 way, Double door No. 570 0


Installation @ 90% 513.00 5 2,565 2 1,026 3 1,539
Testing and Commissioning @ 5% 28.50 - - - - - -
Handing Over @ 5% 28.50 - - - - - -

b 8 way, Double door No. 9 600 5400


Installation @ 90% 540.00 10 5,400 9 4,860 1 540
Testing and Commissioning @ 5% 30.00 - - - - - -
Handing Over @ 5% 30.00 - - - - - -

c 12 way, Double door No. 10 650 6500


Installation @ 90% 585.00 12 7,020 9 5,265 3 1,755
Testing and Commissioning @ 5% 32.50 - - - - - -

Page 5 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

Handing Over @ 5% 32.50 - - - - - -

2.2 Supplying and fixing following way, horizontal/Vertical type three pole and neutral, sheet
steel, MCB distribution board, 415 V, on surface/ recess, complete with tinned copper bus
bar, neutral bus bar, earth bar, din bar, interconnections, powder painted
including earthing etc. as required. (But without MCB/RCCB/Isolator)

a 6 way (4 + 18, Double door No. 665 0


Installation @ 90% 598.50 6 3,591 1 599 5 2,993
Testing and Commissioning @ 5% 33.25 - - - - - -
Handing Over @ 5% 33.25 - - - - - -

b 8 way (4 + 24), Double door No. 55 800 44000


Installation @ 90% 720.00 48 34,560 46 33,120 2 1,440
Testing and Commissioning @ 5% 40.00 - - - - - -
Handing Over @ 5% 40.00 - - - - - -

c 12 way (4 + 36), Double door No. 17 850 14450


Installation @ 90% 765.00 11 8,415 9 6,885 2 1,530
Testing and Commissioning @ 5% 42.50 - - - - - -
Handing Over @ 5% 42.50 - - - - - -

2.3 Supplying and fixing following rating, double pole, (single phase and neutral), 240 V,
residual current circuit breaker with overcurrent protection (RCBO), having a sensitivity
current 30 mA in the existing MCB DB complete with connections, testing and
commissioning etc. as required.

a 40A No. 19 40 760


Installation @ 90% 36.00 31 1,116 20 720 11 396
Testing and Commissioning @ 5% 2.00 - - - - - -
Handing Over @ 5% 2.00 - - - - - -

2.4 Supplying and fixing following rating, four pole, (three phase and neutral), 440 V, residual
current circuit breaker with overcurrent protection(RCBO), having a sensitivity current 30 mA
in the existing MCB DB complete with connections, testing and commissioning etc. as
required.

a 40A No. 17 50 850


Installation @ 90% 45.00 19 855 16 720 3 135
Testing and Commissioning @ 5% 2.50 - - - - - -
Handing Over @ 5% 2.50 - - - - - -

b 63A No. 55 50 2750


Installation @ 90% 45.00 44 1,980 40 1,800 4 180
Testing and Commissioning @ 5% 2.50 - - - - - -
Handing Over @ 5% 2.50 - - - - - -

Page 6 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

2.5 Supplying and fixing 5 A to 32 A rating, 240/415 V, 10 kA, “C” curve, miniature circuit breaker
suitable for inductive load of following poles in the existing MCB DB complete with
connections, testing and commissioning etc. as required.

a Single pole No. 2086 13 27118


Installation @ 90% 11.70 1,836 21,481 1,612 18,860 224 2,621
Testing and Commissioning @ 5% 0.65 - - - - - -
Handing Over @ 5% 0.65 - - - - - -

2.6 Supplying and fixing Cable End Box (Loose Wire Box) suitable for following single pole and
neutral, sheet steel, MCB distribution board, 240 Volts, on surface/ recess, complete with
testing and commissioning etc. as required.

a For 8 way, Double door SPN MCBDB No. 9 100 900


Installation @ 90% 90.00 24 2,160 12 1,080 12 1,080
Testing and Commissioning @ 5% 5.00 - - - - - -
Handing Over @ 5% 5.00 - - - - - -

b For 10 way, Double door SPN MCBDB No. 10 125 1250


Installation @ 90% 112.50 - - - - - -
Testing and Commissioning @ 5% 6.25 - - - - - -
Handing Over @ 5% 6.25 - - - - - -

c For 14 way, Double door SPN MCBDB No. RO 125


Installation @ 90% 112.50 50 5,625 44 4,950 6 675
Testing and Commissioning @ 5% 6.25 - - - - - -
Handing Over @ 5% 6.25 - - - - - -

2.8 Supplying and fixing Cable End Box (Loose wire box) suitable for triple pole and neutral,
sheet steel, Vertical MCB distribution board, 415 V, on surface/ recess, complete with testing
and commissioning etc. as required. No. 72 150 10800
Installation @ 90% 135.00 11 1,485 12 1,620 -1 -135
Testing and Commissioning @ 5% 7.50 - - - - - -
Handing Over @ 5% 7.50 - - - - - -

2.9 Supplying and fixing single pole blanking plate in the existing MCB DB complete etc. as
required.
No. 5 3 15
Installation @ 90% 2.70 38 103 38 103 - -
Testing and Commissioning @ 5% 0.15 - - - - - -
Handing Over @ 5% 0.15 - - - - - -

B. SUBMAIN / LT CABLES & CABLE TRAY

1 Wiring for circuit/ submain wiring alongwith earth wire with the following sizes of FRLS PVC
insulated copper conductor, single core cable in surface/ recessed medium class PVC
conduit as required.

Page 7 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

1.1 4 X 16 sq. mm + 2 X 6 sq. mm earth wire RM 2970 80 237600


Installation @ 90% 72.00 2,010 144,720 1,989 143,215 21 1,505
Testing and Commissioning @ 5% 4.00 - - - - - -
Handing Over @ 5% 4.00 - - - - - -

1.2 4 X 10 sq. mm + 2 X 6 sq. mm earth wire RM 860 58 49880


Installation @ 90% 52.20 853 44,525 849 44,316 4 209
Testing and Commissioning @ 5% 2.90 - - - - - -
Handing Over @ 5% 2.90 - - - - - -

1.3 4 X 6 sq. mm + 2 X 6 sq. mm earth wire RM RO 46


Installation @ 90% 41.40 29 1,201 - - 29 1,201
Testing and Commissioning @ 5% 2.30 - - - - - -
Handing Over @ 5% 2.30 - - - - - -

1.4 2 X 6 sq. mm + 1 X 6 sq. mm earth wire RM 1195 40 47800


Installation @ 90% 36.00 2,488 89,581 2,356 84,804 133 4,777
Testing and Commissioning @ 5% 2.00 - - - - - -
Handing Over @ 5% 2.00 - - - - - -

3 Laying and fixing of one number PVC insulated and PVC sheathed / XLPE power cable of
1.1 kV grade of following size on cable tray as required.

3.1 Upto 35 sq. mm (clamped with 1mm thick saddle) RM 6255 23 143865
Installation @ 90% 20.70 14,175 293,423 11,616 240,451 2,559 52,971
Testing and Commissioning @ 5% 1.15 - - - - - -
Handing Over @ 5% 1.15 - - - - - -

8 Supplying and making end termination with brass Single compression gland and aluminium
lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor
cable of 1.1 kV grade as required.

8.1 3½ X 400 sq. mm (82mm) Each 44 400 17600


Installation @ 90% 360.00 94 33,840 48 17,280 46 16,560
Testing and Commissioning @ 5% 20.00 - - - - - -
Handing Over @ 5% 20.00 - - - - - -

8.2 3½ X 300 sq. mm (70mm) Each 350


Installation @ 90% 315.00 16 5,040 3 945 13 4,095
Testing and Commissioning @ 5% 17.50 - - - - - -
Handing Over @ 5% 17.50 - - - - - -

8.3 3½ X 240 sq. mm (62mm) Each 6 325 1950


Installation @ 90% 292.50 12 3,510 8 2,340 4 1,170
Testing and Commissioning @ 5% 16.25 - - - - - -

Page 8 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

Handing Over @ 5% 16.25 - - - - - -

8.4 3½ X 185 sq. mm (57mm) Each 20 300 6000


Installation @ 90% 270.00 27 7,290 12 3,240 15 4,050
Testing and Commissioning @ 5% 15.00 - - - - - -
Handing Over @ 5% 15.00 - - - - - -

8.5 3½ X 150 sq. mm (50 mm) Each 6 250 1500


Installation @ 90% 225.00 35 7,875 4 900 31 6,975
Testing and Commissioning @ 5% 12.50 - - - - - -
Handing Over @ 5% 12.50 - - - - - -

8.7 3½ X 95 sq. mm (45mm) Each 16 150 2400


Installation @ 90% 135.00 15 2,025 6 810 9 1,215
Testing and Commissioning @ 5% 7.50 - - - - - -
Handing Over @ 5% 7.50 - - - - - -

8.8 3½ X 70 sq. mm (38mm) Each 2 150 300


Installation @ 90% 135.00 4 540 4 540 - -
Testing and Commissioning @ 5% 7.50 - - - - - -
Handing Over @ 5% 7.50 - - - - - -

8.9 3½ X 50 sq. mm (35 mm) Each 4 130 520


Installation @ 90% 117.00 36 4,212 18 2,106 18 2,106
Testing and Commissioning @ 5% 6.50 - - - - - -
Handing Over @ 5% 6.50 - - - - - -

8.10 3½ X 35 sq. mm (32mm) Each 9 105 945


Installation @ 90% 94.50 27 2,552 - - 27 2,552
Testing and Commissioning @ 5% 5.25 - - - - - -
Handing Over @ 5% 5.25 - - - - - -

8.11 4 X 25 sq. mm (28mm) Each 158 105 16590


Installation @ 90% 94.50 100 9,450 28 2,646 72 6,804
Testing and Commissioning @ 5% 5.25 - - - - - -
Handing Over @ 5% 5.25 - - - - - -

9.3 4 core 6 sq.mm Cu arm. No. 48 63 3024


Installation @ 90% 56.70 387 21,943 387 21,943 - -
Testing and Commissioning @ 5% 3.15 - - - - - -
Handing Over @ 5% 3.15 - - - - - -

10.2 150 mm width X 50 mm depth X 1.6 mm thickness RM 780 90 70200


Installation @ 90% 81.00 1,844 149,329 1,652 133,812 192 15,517
Testing and Commissioning @ 5% 4.50 - - - - - -
Handing Over @ 5% 4.50 - - - - - -

Page 9 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

10.3 300 mm width X 50 mm depth X 1.6 mm thickness RM 1115 100 111500


Installation @ 90% 90.00 1,235 111,188 1,128 101,477 108 9,711
Testing and Commissioning @ 5% 5.00 - - - - - -
Handing Over @ 5% 5.00 - - - - - -

10.4 450 mm width X 50 mm depth X 2.0 mm thickness RM 310 110 34100


Installation @ 90% 99.00 623 61,628 573 56,697 50 4,930
Testing and Commissioning @ 5% 5.50 - - - - - -
Handing Over @ 5% 5.50 - - - - - -

10.5 600 mm width X 50 mm depth X 2.0 mm thickness RM 90 120 10800


Installation @ 90% 108.00 98 10,606 93 10,001 6 605
Testing and Commissioning @ 5% 6.00 - - - - - -
Handing Over @ 5% 6.00 - - - - - -

10.6 750 mm width X 75 mm depth X 2.0 mm thickness RM 130 130 16900


Installation @ 90% 117.00 19 2,165 19 2,165 - -
Testing and Commissioning @ 5% 6.50 - - - - - -
Handing Over @ 5% 6.50 - - - - - -

10.7 1000 mm wide


Runners 25 x 100 x 25 x 3 mm
Rungs 20 x 40 x 20 x 3 mm 250 mm C/C
3 Nos. suspenders 40 x 40 x 5 mm GI angle 1000 mm C/C RM 50 140 7000
Installation @ 90% 126.00 375 47,275 325 40,975 50 6,300
Testing and Commissioning @ 5% 7.00 - - - - - -
Handing Over @ 5% 7.00 - - - - - -

10.8 750 mm wide


Runners 25 x 100 x 25 x 3 mm
Rungs 20 x 40 x 20 x 3 mm 250 mm C/C
3 Nos. suspenders 40 x 40 x 5 mm GI angle 1000 mm C/C RM 50 123 6150
Installation @ 90% 110.70 322 35,623 241 26,657 81 8,967
Testing and Commissioning @ 5% 6.15 - - - - - -
Handing Over @ 5% 6.15 - - - - - -

10.9 600 mm wide


Runners 25 x 100 x 25 x 3 mm
Rungs 20 x 40 x 20 x 3 mm 250 mm C/C
3 Nos. suspenders 40 x 40 x 5 mm GI angle 1000 mm C/C RM 50 114 5700
Installation @ 90% 102.60 5 513 5 513 - -
Testing and Commissioning @ 5% 5.70 - - - - - -
Handing Over @ 5% 5.70 - - - - - -

Page 10 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

10.8 Supply, Installation, Testing & Commissioning of Vertical supports using suitable size
screwed expansion insert of good quality of require length, suitable size threaded
suspension rod supports of good quality of required length and bottom horizontal glavanized
steel channels and angles of required length etc. Fixing to concrete surfaces shall be done
with the help of expandable type anchor fastners capable of bearing a minimum weight of Kg RO 12
500kgs.ie .Threaded Rod Supports for Ceiling mounted BBT / Cable Trays. The materials
and labour for grouting and other allied fabrication work shall be supplied and provided by
the contractor.

Installation @ 90% 10.80 15,356 165,843 13,200 142,561 2,156 23,282


Testing and Commissioning @ 5% 0.60 - - - - - -
Handing Over @ 5% 0.60 - - - - - -

C. POINT WIRING

1 Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC
insulated copper conductor single core cable in surface / recessed steel conduit, with
modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLS
PVC insulated copper conductor single core cable etc. as required.

a Group C Pt 1587 160 253920


Installation @ 90% 144.00
Slab / Surface Conduiting @ 15% of 90% 21.60 1,826 39,442 1,608 34,733 218 4,709
Wall Conduiting @ 20% of 90% 28.80 1,826 52,589 1,608 46,310 218 6,278
GI wire Pulling @ 7% of 90% 10.08 1,826 18,406 1,608 16,209 218 2,197
Box Fixing @ 12% of 90% 17.28 1,826 31,553 1,608 27,786 218 3,767
Wiring @ 25% of 90% 36.00 1,826 65,736 1,608 57,888 218 7,848
Switch Plate,Connector or Holder/Ceiling Rose@ 21% of 90% 30.24 1,826 55,218 1,608 48,626 218 6,592
Testing and Commissioning @ 5% 8.00 -
Handing Over @ 5% 8.00 -
a Group C Pt 2226 120 267120
Installation @ 90% 108.00
Slab / Surface Conduiting @ 20% of 90% 21.60 1,975 42,660 1,743 37,649 232 5,011
Wall Conduiting @ 27% of 90% 29.16 1,975 57,591 1,743 50,826 232 6,765
GI wire Pulling @ 9% of 90% 9.72 1,975 19,197 1,743 16,942 232 2,255
Wiring @ 33% of 90% 35.64 1,975 70,389 1,743 62,121 232 8,268
Connector or Holder/Ceiling Rose@ 11% of 90% 11.88 1,975 23,463 1,743 20,707 232 2,756
Testing and Commissioning @ 5% 6.00 - - - - - -
Handing Over @ 5% 6.00 - - - - - -

3 Wiring for twin control light point with 1.5 sq.mm FRLS PVC insulated copper conductor
single core cable in surface / recessed steel conduit, 2 way modular switch, modular plate,
suitable GI box and earthing the point with 1.5 sq.mm FRLS PVC insulated copper Pt RO 160
conductor single core cable etc. as required
Installation @ 90% 144.00

Page 11 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

Slab / Surface Conduiting @ 15% of 90% 21.60 66 1,426 66 1,426 - -


Wall Conduiting @ 20% of 90% 28.80 66 1,901 66 1,901 - -
GI wire Pulling @ 7% of 90% 10.08 66 665 66 665 - -
Box Fixing @ 12% of 90% 17.28 66 1,140 66 1,140 - -
Wiring @ 25% of 90% 36.00 66 2,376 66 2,376 - -
Switch Plate,Connector or Holder/Ceiling Rose@ 21% of 90% 30.24 66 1,996 66 1,996 - -
Testing and Commissioning @ 5% 8.00 - - - - - -
Handing Over @ 5% 8.00 - - - - -

b 2 X 2.5 sq. mm + 1 X 2.5 sq. mm earth wire RM 17000 31 527000


Installation @ 90% 27.90
Slab / Surface Conduiting @ 25% of 90% 6.98 45,551 317,947 41,407 289,019 4,144 28,928
Wall Conduiting @ 35% of 90% 9.77 45,551 445,034 41,407 404,543 4,144 40,491
GI wire Pulling @ 10% of 90% 2.79 45,551 127,088 41,407 115,525 4,144 11,563
Wiring @ 30% of 90% 8.37 45,551 381,263 41,407 346,574 4,144 34,689
Testing and Commissioning @ 5% 1.55 - - - - - -
Handing Over @ 5% 1.55 - - - - - -

c 4 X 2.5 sq. mm + 2 X 2.5 sq. mm earth wire RM 15000 36 540000


Installation @ 90% 32.40
Slab / Surface Conduiting @ 25% of 90% 8.10 4,327 35,049 4,521 36,620 -194 -1,571
Wall Conduiting @ 35% of 90% 11.34 4,327 49,068 4,521 51,268 -194 -2,200
GI wire Pulling @ 10% of 90% 3.24 4,327 14,020 4,521 14,648 -194 -629
Wiring @ 30% of 90% 9.72 4,327 42,059 4,521 43,944 -194 -1,886
Testing and Commissioning @ 5% 1.80 - - - - - -
Handing Over @ 5% 1.80 - - - - - -

7 Wiring for light/ power plug with 2X4 sq. mm FRLS PVC insulated copper conductor single
core cable in surface/ recessed steel conduit alongwith 1 No. 4 sq. mm FRLS PVC insulated 21000 30 630000
copper conductor single core cable for loop earthing as required RM
Installation @ 90% 27.00
Slab / Surface Conduiting @ 25% of 90% 6.75 11,557 78,011 12,312 83,109 -755 -5,098
Wall Conduiting @ 35% of 90% 9.45 11,557 109,215 12,312 116,353 -755 -7,138
GI wire Pulling @ 10% of 90% 2.70 11,557 31,204 12,312 33,244 -755 -2,039
Wiring @ 30% of 90% 8.10 11,557 93,613 12,312 99,731 -755 -6,118
Testing and Commissioning @ 5% 1.50 - - - - - -
Handing Over @ 5% 1.50 - - - - - -

8 Wiring for light/ power plug with 4X4 sq. mm FRLS PVC insulated copper conductor single
core cable in surface/ recessed steel conduit alongwith 2 Nos. 4 sq. mm FRLS PVC 18500 40 740000
insulated copper conductor single core cable for loop earthing as required RM
Installation @ 90% 36.00
Slab / Surface Conduiting @ 25% of 90% 9.00 3,250 29,248 1,750 15,748 1,500 13,500
Wall Conduiting @ 35% of 90% 12.60 3,250 40,947 1,750 22,047 1,500 18,900
GI wire Pulling @ 10% of 90% 3.60 3,250 11,699 1,750 6,299 1,500 5,400
Wiring @ 30% of 90% 10.80 3,250 35,098 1,750 18,898 1,500 16,200

Page 12 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

Testing and Commissioning @ 5% 2.00 - - - - - -


Handing Over @ 5% 2.00 - - - - - -

9 Supplying and fixing suitable size GI box with modular plate and cover in front on surface or
in recess, including providing and fixing 3 pin 5/6 A modular socket outlet and 5/6 A modular 2027 50 101350
switch, connections etc. as required. Pt
Installation @ 90% 45.00
Box Fixing @ 38% of 90% 17.10 1,876 32,080 1,222 20,896 654 11,183
Box Cleaning @ 7% of 90% 3.15 1,876 5,909 1,222 3,849 654 2,060
Switch,Socket and Switch Plate Fixing @ 55% of 90% 24.75 1,876 46,431 1,222 30,245 654 16,187
Testing and Commissioning @ 5% 2.50 - - - - - -
Handing Over @ 5% 2.50 - - - - - -

10 Supplying and fixing suitable size GI box with modular plate and cover in front on surface or
in recess, including providing and fixing 6 pin 5/6 A & 15/16 A modular socket outlet and
15/16 A modular switch, connections etc. as required. 2019 65 131235
Pt
Installation @ 90% 58.50
Box Fixing @ 38% of 90% 22.23 1,161 25,809 1,658 36,857 -497 -11,048
Box Cleaning @ 7% of 90% 4.10 1,161 4,760 1,658 6,798 -497 -2,038
Switch,Socket and Switch Plate Fixing @ 55% of 90% 32.18 1,161 37,361 1,658 53,354 -497 -15,993
Testing and Commissioning @ 5% 3.25 - - - - - -
Handing Over @ 5% 3.25 - - - - - -

12 Supplying and fixing 20 A, 240 V, SPN Industrial type socket outlet, with 2 pole and earth,
metal enclosed plug top alongwith 20 A, “C” curve, SP, MCB, in sheet steel enclosure, on
surface or in recess, with chained metal cover for the socket out let and complete with 90 1080
connections, testing and commissioning etc. as required.
No. 12
Installation @ 80% 72.00 15 1,080 3 216 12 864
Testing and Commissioning @ 10% 9.00 - - - - - -
Handing Over @ 10% 9.00 - - - - - -

13 Supplying and fixing 32 A, 240 V, SPN Industrial type socket outlet, with 2 pole and earth,
metal enclosed plug top alongwith 20 A, “C” curve, SP, MCB, in sheet steel enclosure, on
surface or in recess, with chained metal cover for the socket out let and complete with 119 0 Rate to
connections, testing and commissioning etc. as required. be
No. finalized
Installation @ 90% 107.10 19 2,035 13 1,392 6 643
Testing and Commissioning @ 5% 5.95 - - - - - -
Handing Over @ 5% 5.95 - - - - - -

14 Supplying and fixing suitable size GI box with modular plate and cover in front on surface or
in recess, including providing and fixing 3 pin 25 A modular socket outlet and 25 A modular
switch, connections etc. as required. 67 0 Rate to
be
No. finalized
Installation @ 90% 60.30
Box Fixing @ 38% of 90% 22.91 30 687 23 527 7 160

Page 13 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

Box Cleaning @ 7% of 90% 4.22 30 127 23 97 7 30


Switch,Socket and Switch Plate Fixing @ 55% of 90% 33.17 30 995 23 763 7 232
Testing and Commissioning @ 5% 3.35 - - - - - -
Handing Over @ 5% 3.35 - - - - - -

E. EARTHING SYSTEM

1 Earthing with copper earth plate 600 mm X 600 mm X 3 mm thick including accessories,
and providing masonry enclosure with cover plate having locking arrangement and watering
pipe of 2.7 meter long etc. with charcoal/ coke and salt as required. No. 4 1800 7200

Installation @ 90% 1620.00 154 249,480 54 87,480 100 162,000


Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

2 Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and
providing masonry enclosure with cover plate having locking arrangement and watering pipe No. 28 1800 50400
of 2.7 metre long etc. with charcoal / coke and salt as required.
Installation @ 90% 1620.00 78 126,360 78 126,360 - -
Testing and Commissioning @ 5% 90.00 - - - - - -
Handing Over @ 5% 90.00 - - - - - -

6 Providing and fixing 25 mm X 5 mm copper strip on surface or in recess for connections etc.
25 10625
as required. RM 425
Installation @ 90% 22.50 702 15,802 150 3,377 552 12,425
Testing and Commissioning @ 5% 1.25 - - - - - -
Handing Over @ 5% 1.25 - - - - - -

7 Providing and fixing 25 mm X 3 mm copper strip on surface or in recess for connections etc. Rate to
as required. 15 6375 be
RM 425 finalized
Installation @ 90% 13.50 291 3,927 291 3,927 - -
Testing and Commissioning @ 5% 0.75 - - - - - -
Handing Over @ 5% 0.75 - - - - - -

7A Providing and fixing 50 mm X 6 mm copper strip on surface or in recess for connections etc. Rate to
as required. 60 0 be
RM finalized
Installation @ 90% 54.00 3,422 184,806 1,026 55,422 2,396 129,385
Testing and Commissioning @ 5% 3.00 - - - - - -
Handing Over @ 5% 3.00 - - - - - -

8 Providing and fixing 25 mm X 5 mm G.I. strip on surface or in recess for connections etc. as
20 76620
required. RM 3831
Installation @ 90% 18.00 7,164 128,956 5,071 91,280 2,093 37,676

Page 14 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

Testing and Commissioning @ 5% 1.00 - - - - - -


Handing Over @ 5% 1.00 - - - - - -

3 Providing and fixing GI tape 20mm x 3mm thick on parapet or surface of wall for lightning
18 12600
conductor complete as required. (For horizontal run) RM 700
Installation @ 90% 16.20 2,946 47,727 6 97 2,940 47,630
Testing and Commissioning @ 5% 0.90 - - - - - -
Handing Over @ 5% 0.90 - - - - - -

6 Providing and laying G.I. tape 32 mm X 6 mm from earth electrode directly in ground as
25 1875
required. RM 75
Installation @ 90% 22.50 1,037 23,340 6 141 1,031 23,200
Testing and Commissioning @ 5% 1.25 - - - - - -
Handing Over @ 5% 1.25 - - - - - -

1.0 3½ X 400 sq. mm Each 1000 80 80000


Installation @ 90% 72.00 #REF! #REF! 52,043 3,747,096 #REF! #REF!
Testing and Commissioning @ 5% 4.00 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 4.00 #REF! #REF! - - #REF! #REF!

2.0 3½ X 300 sq. mm Each 1000 60 60000


Installation @ 90% 54.00 #REF! #REF! 1,062 57,348 #REF! #REF!
Testing and Commissioning @ 5% 3.00 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 3.00 #REF! #REF! - - #REF! #REF!

3.0 3½ X 240 sq. mm Each 1000 60 60000


Installation @ 90% 54.00 #REF! #REF! 1,444 77,976 #REF! #REF!
Testing and Commissioning @ 5% 3.00 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 3.00 #REF! #REF! - - #REF! #REF!

4.0 3½ X 185 sq. mm Each 1000 55 55000


Installation @ 90% 49.50 #REF! #REF! 1,536 76,032 #REF! #REF!
Testing and Commissioning @ 5% 2.75 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 2.75 #REF! #REF! - - #REF! #REF!

5.0 3½ X 150 sq. mm Each 1000 50 50000


Installation @ 90% 45.00 #REF! #REF! 687 30,915 #REF! #REF!
Testing and Commissioning @ 5% 2.50 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 2.50 #REF! #REF! - - #REF! #REF!

6.0 3½ X 120 sq. mm Each 1000 50 50000


Installation @ 90% 45.00 #REF! #REF! 1,045 47,025 #REF! #REF!
Testing and Commissioning @ 5% 2.50 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 2.50 #REF! #REF! - - #REF! #REF!

Page 15 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

7.0 3½ X 95 sq. mm Each 1000 40 40000


Installation @ 90% 36.00 #REF! #REF! 181 6,516 #REF! #REF!
Testing and Commissioning @ 5% 2.00 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 2.00 #REF! #REF! - - #REF! #REF!

8.0 3½ X 70 sq. mm Each 1000 40 40000


Installation @ 90% 36.00 #REF! #REF! 749 26,964 #REF! #REF!
Testing and Commissioning @ 5% 2.00 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 2.00 #REF! #REF! - - #REF! #REF!

9.0 3½ X 50 sq. mm Each 1000 35 35000


Installation @ 90% 31.50 #REF! #REF! 595 18,743 #REF! #REF!
Testing and Commissioning @ 5% 1.75 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 1.75 #REF! #REF! - - #REF! #REF!

10.00 3½ X 35 sq. mm Each 1000 30 30000


Installation @ 90% 27.00 #REF! #REF! 889 24,003 #REF! #REF!
Testing and Commissioning @ 5% 1.50 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 1.50 #REF! #REF! - - #REF! #REF!

11.00 4 X 25 sq. mm Each 1000 25 25000


Installation @ 90% 22.50 #REF! #REF! 4,666 104,985 #REF! #REF!
Testing and Commissioning @ 5% 1.25 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 1.25 #REF! #REF! - - #REF! #REF!

10 HT Cable Laying
1 3C X 300 Sqmm Each 1000 100 100000
Installation @ 90% 90.00 #REF! #REF! 7,910 711,900 #REF! #REF!
Testing and Commissioning @ 5% 5.00 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 5.00 #REF! #REF! - - #REF! #REF!

2 2 Layers Sand & 1 Layer Brick Filling Laying RMT 1000 60 60000
Installation @ 90% 54.00 #REF! #REF! 7,383 398,698 #REF! #REF!
Testing and Commissioning @ 5% 3.00 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 3.00 #REF! #REF! - - #REF! #REF!

3 3C X 300 Sqmm HT End Termination Nos 10 2000 20000


Installation @ 90% 1800.00 #REF! #REF! - - #REF! #REF!
Testing and Commissioning @ 5% 100.00 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 100.00 #REF! #REF! - - #REF! #REF!

4 3C X 300 Sqmm HT St. Through Joints Nos 10 2000 20000


Installation @ 90% 1800.00 #REF! #REF! - - #REF! #REF!
Testing and Commissioning @ 5% 100.00 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 100.00 #REF! #REF! - - #REF! #REF!

Page 16 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

11 20-W 600×600 Recess Mounted LED Light Nos 110.00 0


Fixing @ 90% 99.00 #REF! #REF! 1,359 134,541 #REF! #REF!
Testing and Commissioning @ 5% 5.50 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 5.50 #REF! #REF! - - #REF! #REF!

12 40-W LED Sarface Mounted Light Fixture Nos 90.00 0


Fixing @ 90% 81.00 #REF! #REF! 398 32,238 #REF! #REF!
Testing and Commissioning @ 5% 4.50 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 4.50 #REF! #REF! - - #REF! #REF!

13 15-W Recessed LED Circular Down Lights Nos 90.00 0


Fixing @ 90% 81.00 #REF! #REF! 803 65,043 #REF! #REF!
Testing and Commissioning @ 5% 4.50 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 4.50 #REF! #REF! - - #REF! #REF!

14 12-W LED Sarface Mounted Light Fixture Nos 90.00 0


Fixing @ 90% 81.00 #REF! #REF! 309 25,029 #REF! #REF!
Testing and Commissioning @ 5% 4.50 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 4.50 #REF! #REF! - - #REF! #REF!

15 Occupancy Sensor Nos 90.00 0


Fixing @ 90% 81.00 #REF! #REF! 338 27,378 #REF! #REF!
Testing and Commissioning @ 5% 4.50 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 4.50 #REF! #REF! - - #REF! #REF!

20 Street Pole Single Arm Light 4.Mtr Cable Termination and Erection With LED Lights Fixed Nos 0
600.00
Fixing @ 90% 540.00 #REF! #REF! 104 56,160 #REF! #REF!
Testing and Commissioning @ 5% 30.00 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 30.00 #REF! #REF! - - #REF! #REF!

21 Street Pole Single Arm Light 7.Mtr Cable Termination and Erection With LED Lights Fixed Nos 0
700.00
Fixing @ 90% 630.00 #REF! #REF! 61 38,430 #REF! #REF!
Testing and Commissioning @ 5% 35.00 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 35.00 #REF! #REF! - - #REF! #REF!

25 HT Joint Kit Nos 2000.00 0


Fixing @ 90% 1800.00 #REF! #REF! 11 19,800 #REF! #REF!
Testing and Commissioning @ 5% 100.00 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 100.00 #REF! #REF! - - #REF! #REF!

26 HT Termination Kit Nos 2000.00 0


Fixing @ 90% 1800.00 #REF! #REF! 36 64,800 #REF! #REF!
Testing and Commissioning @ 5% 100.00 #REF! #REF! - - #REF! #REF!

Page 17 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

Handing Over @ 5% 100.00 #REF! #REF! - - #REF! #REF!

27 LT Joint Kit Nos 1500.00 0


Fixing @ 90% 1350.00 44 59,400 14 18,900 30 40,500
Testing and Commissioning @ 5% 75.00 #REF! #REF! - - #REF! #REF!
Handing Over @ 5% 75.00 #REF! #REF! - - #REF! #REF!

B. SUBMAIN / LT CABLES & CABLE TRAY

1 Wiring for circuit/ submain wiring alongwith earth wire with the following sizes of FRLS PVC
insulated copper conductor, single core cable in surface/ recessed medium class PVC
conduit as required.
1.2 4 X 10 sq. mm + 2 X 6 sq. mm earth wire RM 860 48.00
Installation @ 90% 43.20 19 816 7 281 12 536
Testing and Commissioning @ 5% 2.40 - - - - - -
Handing Over @ 5% 2.40 - - - - - -

1.3 4 X 6 sq. mm + 2 X 6 sq. mm earth wire RM RO 40.00


Installation @ 90% 36.00 - - - - - -
Testing and Commissioning @ 5% 2.00 - - - - - -
Handing Over @ 5% 2.00 - - - - - -

1.4 2 X 6 sq. mm + 1 X 6 sq. mm earth wire RM 1195 24.00


Installation @ 90% 21.60 124 2,683 96 2,074 28 609
Testing and Commissioning @ 5% 1.20 - - - - - -
Handing Over @ 5% 1.20 - - - - - -

1 Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC
insulated copper conductor single core cable in surface / recessed steel conduit, with
modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLS
PVC insulated copper conductor single core cable etc. as required.

a Group A Pt 95.00
Installation @ 90% 85.50
Slab / Surface Conduiting @ 15% of 90% 12.83 66 847 40 513 26 334
Wall Conduiting @ 20% of 90% 17.10 66 1,129 40 684 26 445
GI wire Pulling @ 7% of 90% 5.99 66 395 40 240 26 156
Box Fixing @ 12% of 90% 10.26 66 677 40 410 26 267
Wiring @ 25% of 90% 21.38 66 1,411 40 855 26 556
Switch Plate,Connector or Holder/Ceiling Rose@ 21% of 90% 17.96 66 1,185 40 718 26 467
Testing and Commissioning @ 5% 4.75 - - - - - -
Handing Over @ 5% 4.75 - - - - - -
a Group A (loop point) Pt 57
Installation @ 90% 5.70
Slab / Surface Conduiting @ 20% of 90% 1.14 15 17 5 6 10 11
Wall Conduiting @ 27% of 90% 1.54 15 23 5 8 10 15

Page 18 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

GI wire Pulling @ 9% of 90% 0.51 15 8 5 3 10 5


Wiring @ 33% of 90% 1.88 15 28 5 9 10 19
Connector or Holder/Ceiling Rose@ 11% of 90% 0.63 15 9 5 3 10 6
Testing and Commissioning @ 5% 2.85 - - - - - -
Handing Over @ 5% 2.85 - - - - - -
4 Wiring for circuit/ submain wiring alongwith earth wire with the following sizes of FRLS PVC
insulated copper conductor, single core cable in surface/ recessed steel conduit as required.

a 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire RM


Installation @ 90%
Slab / Surface Conduiting @ 25% of 90%
Wall Conduiting @ 35% of 90%
Wiring @ 40% of 90%
Testing and Commissioning @ 5%
Handing Over @ 5%

b 2 X 2.5 sq. mm + 1 X 2.5 sq. mm earth wire RM 18.00


Installation @ 90% 16.20
Slab / Surface Conduiting @ 25% of 90% 4.05 688 2,788 698 2,828 -10 -40
Wall Conduiting @ 35% of 90% 5.67 688 3,903 698 3,959 -10 -56
Wiring @ 40% of 90% 6.48 688 4,461 698 4,525 -10 -64
Testing and Commissioning @ 5% 0.90 688 620 698 628 -10 -9
Handing Over @ 5% 0.90 0 - - - -
0 - - - -
c 4 X 2.5 sq. mm + 2 X 2.5 sq. mm earth wire RM 27.00
Installation @ 90% 24.30
Slab / Surface Conduiting @ 25% of 90% 6.08 152 924 - - 152
Wall Conduiting @ 35% of 90% 8.51 152 1,294 - - 152
Wiring @ 40% of 90% 9.72 152 1,477 - - 152
Testing and Commissioning @ 5% 1.35 152 205 - - 152
Handing Over @ 5% 1.35 0 - - - -
0 - - - -
d 4 X 6 sq. mm + 2 X 6 sq. mm earth wire RM 38.00
Installation @ 90% 34.20
Slab / Surface Conduiting @ 25% of 90% 8.55 0 - - - -
Wall Conduiting @ 35% of 90% 11.97 0 - - - -
Wiring @ 40% of 90% 13.68 0 - - - -
Testing and Commissioning @ 5% 1.90 0 - - - -
Handing Over @ 5% 1.90 0 - - - -
0 - - - -

5 Supplying and drawing following sizes of FRLS PVC insulated copper conductor, single core
cable in the existing surface/ recessed steel/ PVC conduit as required

a 6 x 1.5 sq. mm RM 14.00


Installation @ 90% 12.60

Page 19 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

Slab / Surface Conduiting @ 25% of 90% 3.15 0 - - - -


Wall Conduiting @ 35% of 90% 4.41 0 - - - -
Wiring @ 40% of 90% 5.04 0 - - - -
Testing and Commissioning @ 5% 0.70 0 - - - -
Handing Over @ 5% 0.70 0 - - - -

a 3 x 2.5 sq. mm RM 8.00


Installation @ 90% 7.20
Slab / Surface Conduiting @ 25% of 90% 1.80 0 - - - -
Wall Conduiting @ 35% of 90% 2.52 0 - - - -
Wiring @ 40% of 90% 2.88 0 - - - -
Testing and Commissioning @ 5% 0.40 0 - - - -
Handing Over @ 5% 0.40 0 - - - -

b 6 x 2.5 sq. mm RM 17.00


Installation @ 90% 15.30
Slab / Surface Conduiting @ 25% of 90% 3.83 0 - - - -
Wall Conduiting @ 35% of 90% 5.36 0 - - - -
Wiring @ 40% of 90% 6.12 0 - - - -
Testing and Commissioning @ 5% 0.85 0 - - - -
Handing Over @ 5% 0.85 0 - - - -

6 Supplying and fixing of following sizes of steel conduit along with accessories in
surface/recess including painting in case of surface conduit, or cutting the wall and making
good the same in case of recessed conduit as required.

a 25 mm RM 21.00
Installation @ 90% 18.90
Slab / Surface Conduiting @ 45% of 90% 8.51
Wall Conduiting @ 55% of 90% 10.40
Testing and Commissioning @ 5% 1.05
Handing Over @ 5% 1.05

b 32 mm RM 23.00
Installation @ 90% 20.70
Slab / Surface Conduiting @ 45% of 90% 9.32
Wall Conduiting @ 55% of 90% 11.39
Testing and Commissioning @ 5% 1.15
Handing Over @ 5% 1.15

7 Wiring for light/ power plug with 2X4 sq. mm FRLS PVC insulated copper conductor single
core cable in surface/ recessed steel conduit alongwith 1 No. 4 sq. mm FRLS PVC insulated
copper conductor single core cable for loop earthing as required RM 18.00
Installation @ 90% 16.20
Slab / Surface Conduiting @ 25% of 90% 4.05 489 1,981 384 1,556 105 425
Wall Conduiting @ 35% of 90% 5.67 489 2,774 384 2,178 105 595
GI wire Pulling @ 10% of 90% 1.62 489 793 384 622 105 170

Page 20 of 21
Upto Upto
Installation Installation Upto Date Upto Date This Bill
Description Unit Qty Previous Previous This Bill Qty Remarks
Rate Amount Qty Amount Amount
Bill Qty Bill Amount

Wiring @ 30% of 90% 4.86 489 2,378 384 1,867 105 510
Testing and Commissioning @ 5% 0.90 0 - - - -
Handing Over @ 5% 0.90 0 - - - -
9 Supplying and fixing suitable size GI box with modular plate and cover in front on surface or
in recess, including providing and fixing 3 pin 5/6 A modular socket outlet and 5/6 A modular
switch, connections etc. as required. Pt 42.00
Installation @ 90% 37.80
Box Fixing @ 38% of 90% 14.36 24 345 24 345 - -
Box Cleaning @ 7% of 90% 2.65 24 64 24 64 - -
Switch,Socket and Switch Plate Fixing @ 55% of 90% 20.79 24 499 24 499 - -
Testing and Commissioning @ 5% 2.10 0 - - - - -
Handing Over @ 5% 2.10 0 - - - -
10 Supplying and fixing suitable size GI box with modular plate and cover in front on surface or
in recess, including providing and fixing 6 pin 5/6 A & 15/16 A modular socket outlet and
15/16 A modular switch, connections etc. as required.
Pt 57.00
Installation @ 90% 51.30
Box Fixing @ 38% of 90% 19.49 9 175 9 175 - -
Box Cleaning @ 7% of 90% 3.59 9 32 9 32 - -
Switch,Socket and Switch Plate Fixing @ 55% of 90% 28.22 9 254 9 254 - -
Testing and Commissioning @ 5% 2.85 0 - - - - -
Handing Over @ 5% 2.85 0 - - - -

G.Total 7090765 #REF! 9712607 #REF!

Page 21 of 21