You are on page 1of 33

Alat : Grader

Operator : Arifin

Waktu Waktu Kerja


No Tanggal Mulai
Pagi Istirahat
1 Rabu 5-Sep-18 8:30 8:30 - 12:00 3.50 Jam
2 Kamis 6-Sep-18 8:30 8:30 - 12:00 3.50 Jam 12:00 - 13:00
3 Jumat 7-Sep-18 8:25 8:25 - 12:00 3.58 Jam 12:00 - 13:00
4 Sabtu 8-Sep-18 9:00 9:00 - 12:00 3.00 Jam 12:00 - 13:00
5 Minggu 9-Sep-18 9:00 9:00 - 12:00 3.00 Jam 12:00 - 13:00
6 Senin 10-Sep-18 9:00 9:00 - 12:00 3.00 Jam 12:00 - 13:00
7 Selasa 11-Sep-18
8 Rabu 12-Sep-18 8:30 8:30 - 12:00 3.50 Jam 12:00 - 13:00
9 Kamis 13-Sep-18 10:00 10:00 - 12:00 2.00 Jam 12:00 - 13:25
10 Jumat 14-Sep-18 8:19 8:19 - 12:00 3.68 Jam 12:00 - 13:00
11 Sabtu 15-Sep-18 9:00 9:00 - 12:00 3.00 Jam 12:00 - 13:00
12 Minggu 16-Sep-18 0:00 - Jam
13 Senin 17-Sep-18 0:00 - Jam
14 Selasa 18-Sep-18 0:00 - Jam

4:00
0.0666666667

3:41
LAPORAN HARIAN ALAT BERAT

aktu Kerja Total Jam


Kerja (Jam)
Siang
- - - 0.00 Jam 3.50
13:00 - 17:00 4.00 Jam 7.50
13:00 - 17:00 4.00 Jam 7.58
13:00 - 16:50 3.83 Jam 6.83
13:00 - 17:00 4.00 Jam 7.00
13:00 - 17:00 4.00 Jam 7.00

13:00 - 17:00 4.00 Jam 7.50


13:25 - 17:00 3.58 Jam 5.58
13:00 - 17:00 4.00 Jam 7.68
13:00 - 17:00 4.00 Jam 7.00
- Jam 0.00
- Jam 0.00
- Jam 0.00
AN ALAT BERAT

Ukuran Minyak Minyak


Uraian Pekerjaan (cm) Masuk
(Jirigen)
Pagi Sore
-
Menghampar Base A (STA 0+200 - 2+600) 13 24 3
Menghampar Base A (STA 2+600 - 2+900), Menghampar Base 24 32 3
A (STA 3+700 - 4+050)
34 - 3
Menghampar Base C
Menghampar Base A 32 41 2
Menghampar Base A (STA 1+000 - 1+600) 41 - -
Menghampar Base A 37 51 -
Merapikan badan jalan akibat lumpur (STA 5+750 - 6+100) 51 24 -
dan menghampar Base A (STA 1+830 - 1+950)
24 33 -
Menghampar base A (STA 33 -
-
-
-

350
350
800
Cuaca Keterangan

Cerah
Cerah
Cerah 4:50 - 17:00 Hujan
Cerah
Cerah
Cerah Libur
Cerah
Cerah
Cerah
Cerah
Hujan
Hujan
Cerah
Alat : Grader
Operator : Riky

Waktu Waktu Kerja


No Tanggal Mulai
Pagi Istirahat
1 Sabtu 8-Sep-18 8:30 8:30 - 12:00 3.50 Jam 12:00 - 13:15
2 Minggu 9-Sep-18 10:00 10:00 - 11:30 1.50 Jam
3 Senin 10-Sep-18 0:00 - Jam
4 Selasa 11-Sep-18 - 12:00 Jam
5 Rabu 12-Sep-18 - Jam
6 Kamis 13-Sep-18 - Jam 12:00 - 13:25
7 Jumat 14-Sep-18 8:33 8:33 - 12:00 3.45 Jam 12:00 - 13:15
8 Sabtu 15-Sep-18 9:08 9:08 - 11:33 2.42 Jam 11:33 - 13:22
9 Minggu 16-Sep-18 0:00 - Jam
10 Senin 17-Sep-18 0:00 - Jam
11 Selasa 18-Sep-18 0:00 - Jam
LAPORAN HARIAN ALAT BERAT

aktu Kerja Total Jam


Kerja (Jam)
Siang
13:15 - 17:00 3.75 Jam 7.25
- Jam 1.50
- Jam 0.00
- Jam 0.00
- Jam 0.00
15:30 - 17:00 1.50 Jam 1.50
- Jam 3.45
13:22 - 16:48 3.43 Jam 5.85
- Jam 0.00
- Jam 0.00
- Jam 0.00
ARIAN ALAT BERAT

Ukuran Minyak Minyak


Uraian Pekerjaan (cm) Masuk
(Jirigen)
Pagi Sore
Pembuatan drainase (STA 3+650 - 3+700), perataan badan jalan
Menghampar Base C

-
-
menghampar base A 34.5 31 -
31 26 -
Cutting badan jalan (STA 6+200 - 7+050) 26 -
-
-
-
Cuaca Keterangan

Cerah
Cerah 11:30 -

Cerah Pagi ban bocor


Cerah siang kondisi jalan becek
Cerah
Hujan
Hujan
Cerah
Alat : Excavator
Operator : Simanjuntak

Waktu Waktu Kerja


No Tanggal Mulai
Pagi Istirahat
1 Minggu 2-Sep-18 8:00 8:00 - 12:00 4 Jam 12:00 - 13:00
2 Senin 3-Sep-18 8:00 8:00 - 12:00 4 Jam 12:00 - 13:00
3 Selasa 4-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00

4 Rabu 5-Sep-18 13:45 - - - 0 Jam 12:00 - 13:00

5 Kamis 6-Sep-18 8:00 8:00 - 12:00 4 Jam 12:00 - 13:00

6 Jumat 7-Sep-18 8:00 8:00 - 12:00 4 Jam 12:00 - 13:00

7 Sabtu 8-Sep-18 8:00 8:00 - 12:00 4 Jam 12:00 - 13:00


8 Minggu 9-Sep-18 - - - 0 Jam
9 Senin 10-Sep-18 10:30 10:30 - 12:00 1.5 Jam 12:00 - 13:00
10 Selasa 11-Sep-18 - Jam
11 Rabu 12-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
12 Kamis 13-Sep-18 10:00 10:00 - 12:00 2 Jam 12:00 - 13:00

13 Jumat 14-Sep-18 - - - - Jam -


14 Sabtu 15-Sep-18 9:15 9:15 - 12:00 2.75 Jam 12:00 - 13:00
15 Minggu 16-Sep-18 - - - Jam
16 Senin 17-Sep-18 - - - Jam
17 Selasa 18-Sep-18 0:00 - Jam

2:45:00 AM
LAPORAN HARIAN ALAT BERAT

tu Kerja Total Jam Uraian Pekerjaan


Kerja (Jam)
Siang
13:00 - 17:00 4 Jam 8.00 Menggali Sirtu (STA
13:00 - 17:00 4 Jam 8.00 Menggali Sirtu
Menggali Saluran (STA 4+604), Penambahan Badan Jalan (STA
13:00 - 16:00 3 Jam 6.50 4+100 - 4+200)

13:45 - 17:00 2.03 Jam 2.03 Memperlebar dan membuat Saluran (STA 4+200 - 4+300)

Menggali Saluran (STA 4+225 - 4+450), Menghampar Sirtu C


13:00 - 17:00 4 Jam 8.00 (STA 4+250 - 4+300)
Menghampar Base C (STA 4+510), Pelebaran Jalan (STA
13:00 - 17:00 4 Jam 8.00 4+510)
Membuat Saluran (STA 4+350 - 4+400), Membuat Saluran
- - - Jam 4.00 (STA 4+650 - 4+710)
- - - 0 Jam 0.00 -
13:00 - 17:00 4 Jam 5.50 Pelebaran Jalan (STA 4+750 - 4+980)
- Jam 0.00
13:00 - 17:00 4 Jam 7.50 -
13:00 - 16:30 3.5 Jam 5.50 Galian biasa (STA 5+900)

- - - Jam 0.00
13:00 - 17:00 4 Jam 6.75 Galian biasa (STA 7+850)
- Jam 0.00
- Jam 0.00
- Jam 0.00
Ukuran Minyak Minyak Cuaca Keterangan
Masuk
Pagi Sore
29 20 2 Cerah
20 32 4 Cerah
32 30 2 Cerah 16:00 - 17:00 Hidrolik Bocor

30 21 - Cerah 8:00 - 12:00 Perbaikan


Hidrolik

21 17 4 Cerah

17 20 4 Cerah

13:00 - 17:00 Bocor Oli Shell


20 25 2 Cerah Hidrolik
- - - -
25 - 2 Cerah

18 28 - Cerah
16:30 - 17:00 Rusak Selang
28 29 - Cerah minyak
Rusak Selang
- minyak
29 - -
- Hujan
- Hujan
- Cerah
Alat : Dozer
Operator : Andre

Waktu Waktu Kerja


No Tanggal Mulai
Pagi Istirahat
1 Minggu 2-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
2 Senin 3-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
3 Selasa 4-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
4 Rabu 5-Sep-18 9:00 9:00 - 12:00 3 Jam 12:00 - 13:00
5 Kamis 6-Sep-18 8:45 8:45 - 12:00 3.25 Jam 12:00 - 13:00

6 Jumat 7-Sep-18 8:40 8:40 - 12:00 3.33 Jam 12:00 - 13:00


7 Sabtu 8-Sep-18 - - - 0 Jam
8 Minggu 9-Sep-18 9:15 9:15 - 12:00 2.75 Jam 12:00 - 13:00
9 Senin 10-Sep-18 13:00 - - - 0 Jam 12:00 - 13:00

10 Selasa 11-Sep-18 9:00 9:00 - 12:00 3 Jam 12:00 - 13:00

11 Rabu 12-Sep-18 - Jam


12 Kamis 13-Sep-18 9:15 9:15 - 12:00 2.75 Jam 12:00 - 13:17
13 Jumat 14-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
14 Sabtu 15-Sep-18 9:18 9:18 - 12:00 2.7 Jam 12:00 - 13:00
15 Minggu 16-Sep-18 - - - Jam
16 Senin 17-Sep-18 - - - Jam
17 Selasa 18-Sep-18 0:00 - Jam

3:50
0.83333333
LAPORAN HARIAN ALAT BERAT

u Kerja Total Jam Uraian Pekerjaan


Kerja (Jam)
Sore
13:00 - 17:00 4 Jam 7.5 Menghampar Base C
Memperlebar jalan (STA 12+500) dan Menghapar Sirtu C (STA
13:00 - 17:00 4 Jam 7.5 4+800)
13:00 - 17:00 4 Jam 7.5 Menghampar Sirtu (STA 5+200)
13:00 - 17:00 4 Jam 7 Pembersihan dan pelebaran jalan (STA 5+115 - 6+000)
13:00 - 17:00 4 Jam 7.25 Pelebaran dan Pmebersihan bahu jalan (STA 6+200 - 6+800)

Penyiapan badan jalan (STA 6+800 - 7+200), Pelebaran Jalan


13:00 - 16:25 Jam 3.33 (STA 4+510)
- - 0 Jam 0 -
13:00 - 15:00 2 Jam 4.75 Menghampar base C
Penghamparan sirtu C (STA 7+100 - 7+150) dan penyiapan
13:00 - 17:00 4 Jam 4 badan jalan (STA 7+250 - 7+550)
Penghamparan Base C (STA4+520 - 4+590), (STA 5+300 -
13:00 - 17:00 4 Jam 7 5+350), (STA 5+400 - 5+410), (STA 5+450 - 5+550), (STA 5+850
- 5+858)
- Jam 0
13:17 - 17:00 3.72 Jam 6.47 -
13:00 - 17:00 4 Jam 7.5 Penyiapan badan jalan (STA 7+900 - 8+550)
13:00 - 16:50 3.83 Jam 6.53 Penyiapan badan jalan
- Jam 0.00
- Jam 0.00
- Jam 0.00

70
50
10
100
8
50
100
388

407.4
Ukuran Minyak Minyak Cuaca Keterangan
Masuk
Pagi Sore
50 35 2 Cerah
35 34 2 Cerah
34 32 2 Cerah 16:00 - 17:00 Bocor Hidrolik
32 30 2 Cerah 8:00 - 12:00 Perbaikam hidrolik
30 53 2 Cerah

53 2 Cerah 16:25 - 17:00 Hujan


- - - Hujan
- - - Cerah
40 39 1 Cerah 8:00 - 12:00 Hujan

Cerah

57 25 Cerah
25 37 Cerah
37 Cerah
- Hujan
- Hujan
- Cerah
Alat : Dozer
Operator : Sinurat

Waktu Waktu Kerja


No Tanggal Mulai
Pagi Istirahat
1 Minggu 2-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
2 Senin 3-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
3 Selasa 4-Sep-18 - - - Jam
4 Rabu 5-Sep-18 9:00 9:00 - 12:00 3 Jam 12:00 - 13:00
5 Kamis 6-Sep-18 9:00 9:00 - 12:00 3 Jam 12:00 - 13:00
6 Jumat 7-Sep-18 9:00 9:00 - 12:00 3 Jam 12:00 - 13:00
7 Sabtu 8-Sep-18 - - - 0 Jam
8 Minggu 9-Sep-18 - - - Jam
9 Senin 10-Sep-18 9:30 9:30 - 12:00 2.5 Jam 12:00 - 13:00
10 Selasa 11-Sep-18 9:00 9:00 - 12:00 3 Jam 12:00 - 13:00
11 Rabu 12-Sep-18 - - - Jam
12 Kamis 13-Sep-18 - - - Jam
13 Jumat 14-Sep-18 - - - Jam
14 Sabtu 15-Sep-18 - - - Jam
15 Minggu 16-Sep-18 - - - Jam
16 Senin 17-Sep-18 - - - Jam
17 Selasa 18-Sep-18 0:00 - Jam

3:49
0.66666667
LAPORAN HARIAN ALAT BERAT

u Kerja Total Jam Uraian Pekerjaan


Kerja (Jam)
Sore
13:00 - 17:00 4 Jam 7.5 Pembersihan bahu jalan (STA 5+800 - 6+600)
13:00 - 17:00 4 Jam 7.5 Pembersihan bahu jalan (STA 6+600 - 7+500)
- Jam 0
13:00 - 17:00 4 Jam 7 Pembersihan bahu jalan
13:00 - 16:00 3 Jam 6 Pembersihan bahu jalan (STA 8+100 - 8+800)
13:00 - 16:49 3.82 Jam 6.82 Pembersihan bahu jalan
- - 0 Jam 0 -
- Jam 0
13:00 - 17:00 4 Jam 6.5 Pembersihan bahu jalan (STA 9+900 - 10+700)
13:00 - 16:40 3.67 Jam 6.67 Persiapan bahu jalan (STA 10+700 - 11+600)
- Jam 0
- Jam 0 -
- Jam 0
- Jam 0
- Jam 0.00
- Jam 0.00
- Jam 0.00
Ukuran Minyak Minyak Cuaca Keterangan
Masuk
Pagi Sore
43 25 1 Cerah
25 28 1 Cerah
28 49 2 Cerah
49 39 Cerah
39 38 1 Cerah
28 Cerah
- - - Pulang
- - - Pulang
16 2 Cerah
16 32 Cerah
Sakit
Sakit
Sakit
Sakit
- Sakit
- Sakit
- Cerah
Alat : Vibro Roller
Operator : Irwansyah

Waktu Waktu Kerja


No Tanggal Mulai
Pagi Istirahat
1 Minggu 2-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
2 Senin 3-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
3 Selasa 4-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
4 Rabu 5-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
5 Kamis 6-Sep-18 8:45 8:45 - 12:00 3.25 Jam 12:00 - 13:00
6 Jumat 7-Sep-18 - - - Jam
7 Sabtu 8-Sep-18 - - - 0 Jam
8 Minggu 9-Sep-18 11:00 11:00 - 12:00 1 Jam 12:00 - 13:00
9 Senin 10-Sep-18 13:00 - - 0 Jam 12:00 - 13:00
10 Selasa 11-Sep-18 9:00 9:00 - 12:00 3 Jam 12:00 - 13:00
11 Rabu 12-Sep-18 8:32 8:32 - 12:00 3.47 Jam 12:00 - 13:00
12 Kamis 13-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
13 Jumat 14-Sep-18 8:15 8:15 - 12:05 3.83 Jam 12:00 - 13:00
14 Sabtu 15-Sep-18 9:05 9:05 - 12:05 3 Jam 12:05 - 13:00
15 Minggu 16-Sep-18 0:00 - Jam
16 Senin 17-Sep-18 0:00 - Jam
17 Selasa 18-Sep-18 0:00 - Jam

4:05
0.08333333
LAPORAN ALAT BERAT

u Kerja Total Jam Uraian Pekerjaan


Kerja (Jam)
Sore
13:00 - 17:00 4 Jam 7.5 Pemadatan Sirtu C
13:00 - 17:00 4 Jam 7.5 Pemadatan Sirtu C (STA 2+500)
13:00 - 17:00 4 Jam 7.5 Pemadatan jalan (STA 3+250)
13:00 - 17:00 4 Jam 7.5 Pemadatan sirtu C (STA 6+000 - 6+100)
- Jam 3.25 Pemadatan bahu jalan (STA 5+150 - 5+800)
- Jam 0
- - 0 Jam 0
13:00 - 17:00 4 Jam 5 Pemadatan base C
Pemadatan sirtu C (STA 7+100 - 7+150) dan pemadatan
13:00 - 17:00 4 Jam 4 badan jalan (STA 7+250 - 7+550)
13:00 - 17:00 4 Jam 7 Pemadatan Base A
13:00 - 17:00 4 Jam 7.47 Pemadatan Base A
13:00 - 17:00 4 Jam 7.5 Pemadatan badan jalan
13:00 - 17:05 4.08 Jam 7.91 Pemadatan base A
13:00 - 17:00 4 Jam 7 Pemadatan base A
- Jam 0.00
- Jam 0.00
- Jam 0.00
Ukuran Minyak Minyak Cuaca Keterangan
Masuk
Pagi Sore
8 22 3 Cerah
22 16 2 Cerah
16 20 2 Cerah
20 23 2 Cerah
23 19 Cerah 13:00 - 17:00 Bocor shell hidrolik
Perbaikan hidrolik
- - - Hujan Perbaikan hidrolik
19 19 1 Cerah
19 26 2 Cerah 8:00 - 12:00 Hujan
26 19 Cerah
19 20 Cerah
20 10 Cerah
10 19 Mendung
19 Cerah
- Hujan
- Hujan
- Cerah
Alat : Vibro Roller
Operator : Adi

Waktu Waktu Kerja


No Tanggal Mulai
Pagi Istirahat
1 Rabu 5-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
2 Kamis 6-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
3 Jumat 7-Sep-18 8:25 8:25 - 12:00 3.58 Jam 12:00 - 13:00
4 Sabtu 8-Sep-18 - Jam
5 Minggu 9-Sep-18 10:30 10:30 - 12:00 1.5 Jam 12:00 - 13:00
6 Senin 10-Sep-18 - Jam 12:00 - 13:00
7 Selasa 11-Sep-18 8:30 8:30 - 12:00 3.5 Jam 12:00 - 13:00
8 Rabu 12-Sep-18 - Jam
9 Kamis 13-Sep-18 - 0 Jam
10 Jumat 14-Sep-18 8:30 8:30 - 12:00 3 Jam 12:00 - 13:08
11 Sabtu 15-Sep-18 9:09 9:09 - 11:33 2.4 Jam 11:33 - 13:22
12 Minggu 16-Sep-18 - Jam
13 Senin 17-Sep-18 - Jam
14 Selasa 18-Sep-18 - Jam

3:48
0.8
LAPORAN ALAT BERAT

u Kerja Total Jam Uraian Pekerjaan


Kerja (Jam)
Sore
- Jam 3.5
13:00 - 17:00 4 Jam 7.5 Pemadatan Base A (STA 0+200 - 2+600)
Pemadatan base A (STA 2+600 - 2+900), pemadatan Base A
13:00 - 17:00 4 Jam 7.58 (STA 3+700 - 4+050)
- Jam 0
13:00 - 17:00 4 Jam 5.5 Pemadatan base C
13:00 - 17:00 4 Jam 4 Pemadatan base A
13:00 - 17:00 4 Jam 7.5 Pemadatan base C
- Jam 0
15:30 - 17:00 1.5 Jam 1.5 Pemadatan badan jalan
13:08 - 17:00 3.87 Jam 6.87 Pemadatan badan jalan yang di grader
13:22 - 17:10 3.8 Jam 6.2
- Jam 0.00
- Jam 0.00
- Jam 0.00
Ukuran Minyak Minyak Cuaca Keterangan
Masuk
Pagi Sore
Cerah
9 4.5 3 Cerah
4.5 15 3 Cerah
Hujan
Cerah
13 12 2 Cerah 8:00-12:00 Hujan
12 - - Hujan

18 7 Cerah 8:00 - 12:00 Rusak mesin


7 10 Cerah
10 20 Cerah
- Hujan
- Hujan
- Cerah
Alat : Vibro Roller (Bomak putih)
Operator ; Najaruddin

Waktu Waktu Kerja


No Tanggal Mulai
Pagi Istirahat
1 Rabu 12-Sep-18 8:10 8:10 - 12:00 Jam 12:00 - 13:00
2 Kamis 13-Sep-18 9:00 9:00 - 12:00 3 Jam 12:00 - 13:00
3 Jumat 14-Sep-18 8:34 8:34 - 12:00 Jam 12:00 - 13:00
4 Sabtu 15-Sep-18 9:15 9:15 - 12:00 Jam 12:00 - 13:00
5 Minggu 16-Sep-18 0:00 - Jam
6 Senin 17-Sep-18 0:00 - Jam
7 Selasa 18-Sep-18 0:00 - Jam

4:00:00
0.86666667
LAPORAN ALAT BERAT

u Kerja Total Jam Uraian Pekerjaan


Kerja (Jam)
Sore
13:00 - 17:02 Jam 0
13:00 - 17:00 4 Jam 7 Pemadatan badan jalan yang di grader (STA 5+800 - 6+200)
13:00 - 17:00 4 Jam 4 Pemadatan badan jalan (STA 6+200 - 6+700)
13:00 - 17:05 Jam 0 Memadatkan badan jalan (STA 7+900 - 8:600)
- Jam 0.00
- Jam 0.00
- Jam 0.00
Ukuran Minyak Minyak Cuaca Keterangan
Masuk
Pagi Sore

12 16 Cerah
16 15 Cerah
15 Cerah
- Hujan
- Hujan
- Cerah
11,900,000.00

Pembayaran gaji karyawan bulan Agus 8,100,000.00

Gaji Bulan Agustus


Pak Gultom 2,600,000.00
Deby 1,500,000.00
Sinaga 1,500,000.00
Op. Pak Mardan 2,500,000.00
8,100,000.00

30
Tgl 8 Agustus start di lapangan

Pipa 1.25'' 3 meter 1 batang

tgl 19 september 2018


Kayu 2/3 135 btg
150,000,000.00
26,000,000.00
124,000,000.00
Pembayaran jembatan sementara 20,000,000.00
Sisa uang 104,000,000.00 19-Sep-18
Pembayaran hutang panglong 15,400,000.00 19-Sep-18
Sisa uang 88,600,000.00

3.60
85.00
88.60

di tarik 17,900,000.00
kirim ke pak mardan 8,100,000.00
sisa penarikan 9,800,000.00
di tarik kembali 8,100,000.00
biaya makan konsultan 8,000,000.00 utk 5 orng /bln

beli material base 50,000,000.00


pembayaran cv ramos 28,000,000.00
Total 78,000,000.00 200 m3
78,000,000.00
pembayaran
material base 70,000,000.00
sisa hutang 8,000,000.00
LAPORAN HARIAN OPERASI UNIT ALAT BERAT

Alat :
Operator :
Pengawas Alat Berat :

Jam Kerja
No Hari/ Tanggal Lokasi
Pagi Sore
s/d s/d
s/d s/d
s/d s/d
s/d s/d
s/d s/d
s/d s/d
s/d s/d
s/d s/d
s/d s/d
s/d s/d
s/d s/d
s/d s/d
s/d s/d
s/d s/d
Disetujui oleh: Diketahui oleh:

Beatus Situmorang, ST Wandison Sitohang, Amd


General Superintendent Pelaksana Lapangan
RAN HARIAN OPERASI UNIT ALAT BERAT

Paraf
Uraian Pekerjaan/ Keterangan
Operator
Dibuat oleh:

Azrihim
Pengawas

You might also like