1. 80 Ton Adjustable Electric Travel Rotator HGK80-DX: 1 SET ( 1 EA power rotator + 1 EA


idler rotator)

2. 40 Ton Hydraulic Fit-up Rotator YZG40: 1 SET ( 2 EA hydraulic rotator )

- Adjustable Electric Travel Rotator (Idler Part)


- Adjustable Electric Travel Rotator (Driven Part)
- Hydraulic Rotator Part 1
- Hydraulic Rotator Part 2

Berikut tahapan pipe joint sesuai gambar diatas :

1. Place No. 1 pipe to 80T Adjustable Electric Travel Rotator.

2. Place No. 2 pipe to 40T Hydraulic Fit-up Rotator.

3. No. 1 pipe and No. 2 pipe fit-up together (fit up and spot welding).

4. Manipulator put SAW welding head into the tank, Inner circular seam welding, then Outer
circular seam welding on the top.

5. Move away Manipulator.

6. Rotator Part 1 lifts up the pipe ( No. 1 & No. 2 wleded), remove Hydraulic Rotator Part 2.

7. Electric Travel Rotator (Driven Part) moves to the direction of Hydraulic Rotator Part 1.

8. Hydraulic Rotator Part 1 lows down, then the pipe drops to Electric Travel Rotator (Driven
Part).

9. Rotator Part 1 continues to low down, move to the end of No. 2 welded pipe.

10. Rotator Part 1 lifts up the pipe again, Electric Travel Rotator (Driven Part) moves to
middle position of No. 2 pipe.

11. Rotator Part 1 lows down and move away.

12. Place No. 3 pipe to 40T Hydraulic Fit-up Rotator, complete the fit up the same way.

13. Place No. 4 pipe to 40T Hydraulic Fit-up Rotator, complete the fit up the same way.