3. No. 1 pipe and No. 2 pipe fit-up together (fit up and spot welding).
4. Manipulator put SAW welding head into the tank, Inner circular seam welding, then Outer
circular seam welding on the top.
6. Rotator Part 1 lifts up the pipe ( No. 1 & No. 2 wleded), remove Hydraulic Rotator Part 2.
7. Electric Travel Rotator (Driven Part) moves to the direction of Hydraulic Rotator Part 1.
8. Hydraulic Rotator Part 1 lows down, then the pipe drops to Electric Travel Rotator (Driven
Part).
9. Rotator Part 1 continues to low down, move to the end of No. 2 welded pipe.
10. Rotator Part 1 lifts up the pipe again, Electric Travel Rotator (Driven Part) moves to
middle position of No. 2 pipe.
12. Place No. 3 pipe to 40T Hydraulic Fit-up Rotator, complete the fit up the same way.