Bill of Material

I.Configuration
P/2 P/2
200

D10 250
320
D22
D22

150 250 250 200 250 250 150 100


1200

f'c(Mpa) Niwa STM -EC2 STM -ACI Safety)%


35 340.46 419.93 409.80 16.01
Shear Capacity (kN)
30 307.21 359.94 351.25 28.01

f'c(Mpa) Pflex,u
35 588.27
Bending Load(kN)
30 551.75

Dimension of beam
b(m) h(m) l(m) n. of beam
Beam 0.1 0.32 1.2 8

II.Summary table for total quantity

Speciments Beams Total Vc With safety 10%


Concrete volume (m3) 0.206 0.31 0.51 0.56

Concrete Steel With safety 10%


Strain gauges (pc) 74 48 81 53

Rebar Total length (m) unit length number of bar


D22 16 3.5m 5 bars
4m 4 bars
Stirrup Quantity (pc) 2m 8 bars
D10 48

Wood for formwork Total length (m) unit length number of sheet
h=332 mm, thickness=12 mm 20.8
III. Detailed calculation
100
Cylinder Speciments
Loading age (day) φ100×200mm φ150×200mm
1 3 0
200
3 3 5
7 3 5
14 3 5
using strain gauges

28 3 5
150
91 3 5
Loading 1 3 5
Loading 2 3 5 200
Loading 3 3 5
spare 3 5
Total number (pc) 30 45

φ100×200mm φ150×200mm
Vc (m3)/ speciment 0.0016 0.0035
Total Vc (m3) 0.047 0.16 0.21

n_strain gauge (pc)/test 2 0


Total n_strain gauage (pc) 42 0

Beams
I. Volume of concrete (m3)
Vc (m3) / beam n. of beam Total Vc (m3)
0.038 8 0.31

II. Number of strain gauges


concrete steel rebar
n_strain gauge (pc) /beam 4 6
Total n_strain gauge (pc) 32 48

Rebar for beams


bottom top length/ beam
Rebar D22 (m) 1.5 0.5 2
Total length D22 (m) 16

Rebar D10 (pc) - - 6


Total D10 (pc) 48
Wood for formwork
length (m) / beam Total length (m)
h=332 mm, thickness =12m 2.6 20.8

Bill of Material
Items Unit Total number
Strain gauges for rebar - 53
Rebar D22 3.5m 5
Stirrup D10 - 50
CN - 2
SB Tape - 2
VM Tape - 2
Adhesive P-2 - 1
ブチルゴムテープ No.11 - 2