Project Sheet No.

Engineer
Date

ขข้อมมูล
พพน
พื้ ททท
ที่ งท พื้ หมด = 275.34 sq.m. 100 %
Building Area = 0.000 sq.m. 0.00 % C = 0.70
Other Area = 275.34 sq.m. 100.00 % C = 0.70

Cofficent of Runoff, C = 0.70

Return Reriod = 5 Years


Rainfall Intensity Rate, I = 150 mm./Hr.
Wastewater, W= 0 Liter / person / day
User of Building, U= 0 people
rate of leakage, Ra= 100 cu.m./day /km.
L= 70.35 m.
Slope 1 : 200 = 0.005
n= 0.018

Actual Flow Rate

Q1 (from Total Area) = 0.278 x10-6 CIA


= 0.00804 cu.m./s

Q2 (from Building Usage) = 0.95WU/(24*60*60*1000)


= 0.00000 cu.m./s

Q3 (from Leakage) = Ra*L/(24*60*60*1000)


= 0.000081 cu.m./s

Q Overall
= 0.00812 cu.m./s

Design Flow Rate (Manning Formula)

Q= (1/n) A.R2/3.S1/2

Drainage Type = Ditch

Width, B = 0.150 m.
Depth, D = 0.150 m.
Thickness of cover = 0.000 m.
0.321 Q .S-3/16
3/8

Area, A = BxD = 0.023 sq.m.


P= 0.450 m.

R = A/P = 0.050 m.

Q Design
= 0.012 cu.m./s > Q overall (Ok)

Design Calculation
V Design
= (1/n) R2/3.S1/2
= 0.533 m./s

Design Calculation
Sheet No. 1
Engineer AB
Date 2/26/2020

Design Calculation
157.6
93.1
63.9
87.2
202.6
202.5
125.2
285.9
414.7
119.8
90.1
76.4
59.7
1978.7
152.20769