q1 + q8 2,41 1,98
qrata-rata = = = 2,195
2 2
qr 2,19
Faktor Koreksi = = = 0,91
q1 2,41
q1 + q8 2,23 2,15
qrata-rata = = = 2,19
2 2
qr 2,19
Faktor Koreksi = = = 0,98
q1 2,23
q1 + q8 1,90 1,85
qrata-rata = = = 1,88
2 2
qr 1,88
Faktor Koreksi = = = 0,99
q1 1,90
1. Hotel
Tabel C.4 Data Timbulan Sampah Hotel Kota Alahan Panjang
Sampel Data Timbulan(l/m2/h)
Senin 1,182
Selasa 1,266
Rabu 1,251
Kamis 1,185
Jum’at 1,184
Sabtu 1,180
Minggu 1,175
Senin 1,185
∑H = 9,61
Sumber: Data dan Perhitungan Tugas Besar Pengelolaan Sampah, 2019
q1 + q8 1,182 1,185
qrata-rata = = = 1,18
2 2
qr 1,18
Faktor Koreksi = = = 1,00
q1 1,183
q1 + q8 1,141 1,139
qrata-rata = = = 1,14
2 2
qr 1,14
Faktor Koreksi = = = 1,00
q1 1,1141
3. Toko
Tabel C.6 Data Timbulan Sampah Toko Kota Alahan Panjang
Sampel Data Timbulan(l/m2/h)
Senin 1,433
Selasa 1,889
Rabu 1,664
Kamis 1,355
Jum’at 1,999
Sabtu 1,244
Minggu 1,768
Senin 1,868
∑H =13,22
Sumber: Data dan Perhitungan Tugas Besar Pengelolaan Sampah, 2019
q1 + q8 1,433 1,868
qrata-rata = = = 1,65
2 2
qr 1,65
Faktor Koreksi = = = 1,16
q1 1,433
q Senin = q1 x Fk = 1,433 x 1,16 = 1,66 l/o/h
q Selasa = q2 x Fk = 1,889 x 1,16 = 2,19 l/o/h
q Rabu = q3 x Fk = 1,664 x 1,16 = 1,93 l/o/h
q Kamis = q4 x Fk = 1,355 x 1,16 = 1,57 l/o/h
q Jum’at = q5 x Fk = 1,999 x 1,16 = 1,23 l/o/h
q Sabtu = q6 x Fk = 1,244 x 1,16 = 1,23 l/o/h
q Minggu = q7 x Fk = 1,768 x 1,16 = 1,91 l/o/h
∑H 11,72
Rata-rata Toko = = = 1,67
7 7
4. Kantor
Tabel C.7 Timbulan Sampah Kantor
Sampel Data Timbulan (l/m2/h)
Senin 1 1,577
Selasa 1,785
Rabu 1,820
Kamis 1,685
Jum’at 1,650
Sabtu 0,000
Minggu 0,000
Senin 2 1,622
Sumber: Data Tugas Besar Pengelolaan Sampah, 2019
q1 + q8 1,567 + 1,612
qrata-rata = = = 1,560 l/o/h
2 2
qr 1,560
Faktor Koreksi = q1 = = 0,989
1,577
q Senin 1 = q1 x Fk = 1,577 x 0,989 = 1,560 l/o/h
q Selasa = q2 x Fk = 1,785 x 0,989 = 1,765 l/o/h
q Rabu = q3 x Fk = 1,820 x 0,989 = 1,800 l/o/h
q Kamis = q4 x Fk = 1,685 x 0,989 = 1,666 l/o/h
q Jum’at = q5 x Fk = 1,650 x 0,989 = 1,632 l/o/h
q Sabtu = q6 x Fk = 0,00 x 0,989 = 0,00 l/o/h
q Minggu = q7 x Fk = 0,00 x 0,989 = 0,00 l/o/h
∑Q = Q1 + Q2 + Q3 + Q4 + Q5 + Q6 + Q7 = 8,423 l/o/h
∑Q 8,423
Q rata-rata = = = 1,203 l/o/h
7 7
5. Sekolah
Tabel C.8 Timbulan Sampah Sekolah
Sampel Data Timbulan (l/m2/h)
Senin 1 1,931
Selasa 2,067
Rabu 2,173
Kamis 1,944
Jum’at 2,020
Sabtu 1,987
Minggu 0,000
Senin 2 1,893
Sumber: Data Tugas Besar Pengelolaan Sampah, 2018
q1 + q8 1,931 + 1,893
qrata-rata = = = 1,912 l/o/h
2 2
qr 1,912
Faktor Koreksi = q1 = = 0,990
1,931
Q1 = q1 x Fk = 1,931 x 0,990 = 1,912 l/o/h
Q2 = q2 x Fk = 2,067 x 0,990 = 2,046 l/o/h
Q3 = q3 x Fk = 2,173 x 0,990 = 2,151 l/o/h
Q4 = q4 x Fk = 1,944 x 0,990 = 1,924 l/o/h
Q5 = q5 x Fk = 2,020 x 0,990 = 2,000 l/o/h
Q6 = q6 x Fk = 1,987 x 0,990 = 1,967 l/o/h
Q7 = q7 x Fk = 0,000 x 0,990 = 0,000 l/o/h
∑Q = Q1 + Q2 + Q3 + Q4 + Q5 + Q6 + Q7 = 12 l/o/h
∑Q 12
Q rata-rata = = = 1,714 l/m2/h
7 7
6. Rumah Sakit
7. Tabel C.9 Timbulan Sampah Rumah Sakit
Sampel Data Timbulan (l/m2/h)
Senin 1 1,493
Selasa 1,620
Rabu 1,660
Kamis 1,620
Jum’at 1,635
Sabtu 1,650
Minggu 1,560
Senin 2 1,543
Sumber: Data Tugas Besar Pengelolaan Sampah, 2017
q1 + q8 1,493 1,543
qrata-rata = = = 1,518 l/o/h
2 2
qr 1,518
Faktor Koreksi = = = 1,017
q1 1,493
Q1 = q1 x Fk = 1,493 x 1,017 = 1,518 l/o/h
Q2 = q2 x Fk = 1,620 x 1,017 = 1,648 l/o/h
Q3 = q3 x Fk = 1,660 x 1,017 = 1,688 l/o/h
Q4 = q4 x Fk = 1,620 x 1,017 = 1,648 l/o/h
Q5 = q5 x Fk = 1,635 x 1,017 = 1,663 l/o/h
Q6 = q6 x Fk = 1,650 x 1,017 = 1,678 l/o/h
Q7 = q7 x Fk = 1,560 x 1,017 = 1,684 l/o/h
∑Q = Q1 + Q2 + Q3 + Q4 + Q5 + Q6 + Q7 = 11,527 l/o/h
∑Q 11,527
Q rata-rata = = = 1,647 l/o/h
7 7
Selasa 1,142
Rabu 1,151
Kamis 1,135
Jum’at 1,138
Sabtu 1,130
Minggu 1,133
Senin 2 1,155
Sumber: Data Tugas Besar Pengelolaan Sampah, 2018
q1 + q8 1,140 1,155
qrata-rata = = = 1,147 l/m2/h
2 2
qr 1,147
Faktor Koreksi = = = 1,006
q1 1,140
Q1 = q1 x Fk = 1,140 x 1,006 = 1,147 l/m2/h
Q2 = q2 x Fk = 1,142 x 1,006 = 1,148 l/m2/h
Q3 = q3 x Fk = 1,151 x 1,006 = 1,158 l/m2/h
Q4 = q4 x Fk = 1,135 x 1,006 = 1,142 l/m2/h
Q5 = q5 x Fk = 1,138 x 1,006 = 1,145 l/m2/h
Q6 = q6 x Fk = 1,130 x 1,006 = 1,137 l/m2/h
Q7 = q7 x Fk = 1,133 x 1,006 = 1,140 l/m2/h
∑Q = Q1 + Q2 + Q3 + Q4 + Q5 + Q6 + Q7 = 8,017 l/m2/h
∑Q 8,070
Q rata-rata = = = 1,145 l/m2/h
7 7
Selasa 1,509
Rabu 1,025
Kamis 1,702
Jum’at 1,194
Sabtu 1,678
Minggu 1,692
Senin 2 1,553
Sumber: Data Tugas Besar Pengelolaan Sampah, 2017
q1 + q8 1,339 1,553
qrata-rata = = = 1,446 l/o/h
2 2
qr 1,446
Faktor Koreksi = = = 1,080
q1 1,339
Q1 = q1 x Fk = 1,339 x 1,080 = 1,446 l/o/h
Q2 = q2 x Fk = 1,509 x 1,080 = 1,630 l/o/h
Q3 = q3 x Fk = 1,025 x 1,080 = 1,107 l/o/h
Q4 = q4 x Fk = 1,702 x 1,080 = 1,838 l/o/h
Q5 = q5 x Fk = 1,194 x 1,080 = 1,290 l/o/h
Q6 = q6 x Fk = 1,678 x 1,080 = 1,812 l/o/h
Q7 = q7 x Fk = 1,692 x 1,080 = 1,827 l/o/h
∑Q = Q1 + Q2 + Q3 + Q4 + Q5 + Q6 + Q7 = 10,950 l/o/h
∑Q 10,950
Q rata-rata = = = 1,564 l/o/h
7 7
Tabel Konversi
Timbulan
Timbulan
Sumber Satuan Jumlah Satuan Kapasitas Satuan Rata-Rata
Rata-Rata
(l/h)
High Income
2,06 L/o/h 120.950 55 623.261,92
(HI)
Medium Income Jiwa %
1,91 L/o/h 120.950 30 310.963,92
(MI)
Low Income (LI) 1,76 L/o/h 120.950 15 140.620,25
Hotel 1,20 L/m2/h 12 50 716,69
Pasar 1,14 L/m2/h 5 Unit 800 m2/ unit 4.524,04
2
Toko 1,67 L/m /h 100 30 5.255,43
Kantor 1,20 L/o/h 25 50 1.533,13
Sekolah 1,71 L/o/h 32 Jiwa 650 jiwa/ unit 35.649,49
100%
Timbulan sampah kota = x Qrata-rata
% sampah domestik
= 2,023 L/o/h