1. Earth work execution in ordinary soil for the column pits. Pits size is 4’0”*4’0”*5’0”.size
and depth may change as per structural advice.

2. Supplying river sand filling in foundation for the column pits.- Height??

3. PCC 1:4:8 of cement concrete in foundation use 1.5:G.B. metal for the column pits.
Thickness is 0’6”.-TMT Band Name

4. RCC column footing for foundation RCC 1:2:4 with tensile reinforcement use 20mm
G.B.metal pedestal rod is 10 dia on both side 5” c/c cement make-Ultra
Tech/Coromandal Super Strong

5. RCC column 1:1:5:3 with reinforcement use 20mm G.B. metal.

(a) Groundfloor column size is 0’9”*0’9” reinforcement.

6. RCC plinth beam 1:2:4 mix with tensile reinforcement connection all columns. Size of
beam is minimum 0’9”*1’0” reinforcement.

7. Brick work in foundation up to basement level (3, 0” feet from existing road level) wall
in CM 1:5 with well burn bricks.

8. Filling the basement inside using pit sand and other soil consolidation, Ramming etc.,
complete.-Savudu manal

11. Filling river sand for basement in 0’6”thickness.

12. Flooring concrete in PCC 1:4:8 using 1.5” G.B. Metal 0’4” thickness.

13. Brick work in superstructure 0’9” wall in CM1:6 and 4.5” wall in CM 1:4 with stock
bricks.-Chamber Brick to be verified

(a) Sill level is 3’0” feet.

(b) Lintel level is 7’0”.

(c) Roof level is ground floor 10’0”.


14. Laying RCC lintel Complete concrete over the doors, windows & ventilators in 1:2:4 mix
using G.B Metal with tensile reinforcement.

15. Providing RCC loft & sunshade in 1:2:4 with tensile reinforcement using 20mm
G.B.metal

16. RCC roof beam 1:2:4 mix with reinforcement using 20mm G.B.metal.

17. RCC roof slab and balcony slab in 1:2:4 mix with reinforcement using 20mm G.B. metal
4.5” thickness slab.

18. Main door teak wood frame and shutter with standard hardware’s fitting with varnish
fitting, Lock-godrej fitting.

19. In other door 2nd class teak wood framed branded flush door with standard fittings.

20. In window upvc or second teak framed and shutters with glazing, fixed mild-steel grills
with standard fittings as per approval model. -Designer glass with design mild steel frame
work with Teak wood frames

21. Construction of staircase with grill hand railing, Staircase riser is 0’6” and tread in
0’10”.- Staircase with Stainless steel hand railing as per customer choice and all steps to
be granite layed.

22. Inner plastering smooth finishing in cm 1:3 with ¾” average thickness, wall plastering
inside and outside cm 1:5 with ½” average thickness.- to confirm with Mr. Murali

23. Flooring tiles with approval colour for flooring and skirting in all rooms. With Marble
/Marbonite tiles only selected by customer cost Rs 90 Per sqft.-extra at customer cost..

24. In toilet colour ceramic tiles up to roof level in walls, colour ceramic tiles for flooring
Rs.50/-

25. Colour ceramic tiles over the counter walls in kitchen for 3’0” height Rs.45/-

26. Built in cupboard with all over with Granite Stone and all cupboards should be bordered
with Granite Stone.

27. Kitchen platform countertop polished black granite (SS sink).-Colour and Selection will
be done by customer

28. Parapet walls in brick in cm 1:6, 3.6’ height from the top of the roof slab.-to be finalised
29. Painting full birla white putty with two coats asian royale over primer coat interior walls,
emulsion paint asian for finishing for exterior walls with primer for approval colour.

30. Painting for joineries with one coat primer and 2 coats of enamel Asain paints approval
colour.

31. PVC standard ISI concealed with supply piping and waste water line with standard
ceramic fixtures and chromium plated fittings.

(a) E.W.C. or I.W.C. - 1 No. [CERA’,PARRY]

(b) Wash hand basin - 1 No. [CERA PARRY’s]

(c) Hot & cold connections - 1 No. [Metro] or Waterman for each toilet.

- Written in last.

32. Providing Electrification in concealed ISI copper wire (ORBIT or KUNDAN) finolex
make with metal boxes and legrand modular switches with MCB for each bed room
provision to ELCP in each portion. (3 phase wiring).with d.p. box at each flat.

33. Centralised Electric main board at common area with main meter and individual meters.

34. Commen area lighting will be provided at steps and car parking.

(i) Hall & Dining

 Two points for tube light provision.


 Two points for bulbs provision.
 Telephone & TV socket provision.
 Two points for fans and one point for chandelier fittings provision.
 15 Amps – 1 no’s.
 5 Amps – 2no’s.
 AC point provision.
 Floor light provision.
 Calling bell provision.

(ii) Bedroom

 One point for fan with two way switches will be provision.
 One point for bulb provision.
 Two point for tube light with two way switches provision.
 AC point provision.
 Floor light point provision.
 Telephone point provision.
 3 no’s 5 Amps switches for computer in suitable room.

(iii) Kitchen

 Two points 15 Amps provision.


 Two points 5 Amps.
 Chimney point provision.
 One point for water filters provision.

(iv) Bathroom & Toilet

 One point for bulb two way switch provision.


 One point for HWB provision.
 One point for water heater provision.
 Wash basin light provision.

Type of materials to be use

 Cement – For structure opc 53 grade (COROMENDAL or ULTRATECK)


 Cement – For brick work & plastering ppc 53 grade (COROMENDAL or
ULTRATECK make only)
 Bricks – Best quality of chamber bricks.
 Sand – Best quality of river sand.
 Blue metal – Best quality of quarry blue metal.
 Steel – Best quality of TMT rods PSK,AGNI,ARS will be selected by customer
 Sanitation – ISI branded will be selected by customer
 Taps – Metro.Waterman-will be selected by customer
 Switches – Legrand
 Painting – Asian.
 Wood – Only Teak wood .

THANKS AND REGARDS


K.Srinivasan & S.Bharathi

Crystal Properties.
Dear Senthil,

Please find the attachment of regular specification for your proposed


construction.
and additional work will be done excluded at a above attachment as under
LIST OF WORK
1.main door frame 5x4 thickness instead of 5x3
2.main door with designer model.
3.steps tiles
4.painting royal play with design
5.toilet wall tile up to roof level
6.switches with modular fitting
7.elevation work as per 3 d view.

Thanks and Regards


Srini & Bharathi
Crystal Properties.

New additions TSK:

1. Flooring in car parking

2. Electrical Points clarification

3. Cupboards and shelves in Bed room and Hall with Granite stones

4. Painting putty 3 coats in inner walls, bed room roof, and hall roof.(2 Coats Birla Putty,1 Coat
asian putty)

5. Points for chandelles in hall

6. Cement to be used for Dalmia/Zuari for plastering and brick work and coromandel/ultratek 53
gr for structure.

7. Magic eye on doors.

8. Sanitation should be of my choice.-Jaguar make only


9. Tiles should be of my choice of Gajaria make Rs 85 for floor /Marble will be optional and Rs
60 for bathroom tiles and kitchen tiles 45 rs-kitchen should have full tiles till roofing height

10. Birla white putty to be used.

11. Stainless steel handles for stairs, with granite/marble foot steps

12. Texture painting with approved colors on the elevation

13. Bordering on inside of hall, dining and Bed Rooms

14. Wooden door covers for cupboards inside kitchen, bed rooms and in Hall, Pooja room

15. Ground floor basement height to be finalized 5 feet

16. inside arch for kitchen, hall to pooja, hall to bed room,wherevevr applicable space is there

17. Pavement all along the house with cement slab

18. Internal plumbing lines are UPVC Pipes

19. External piping lines are Upvc pipes

20. Internall fittings are jaquar cp fittings

21. Septic Tank and Water Sump area and size to be finalized

22. Kitchen modular shelves with chimney should also be provided at the kitchen.

23. Finalox or Star UPVC Pipeand fitting, all valve leader make >4” -6 gauge and <4”-15 gauge

24. Ashirvad CPVC for hotline.

25.Swithches Legrand make,MCB Legrand make(LEXIC),L&T make rotary system,3 Phase DP


Box Bosma Make and all cable should be high rated withstanding 3 Phase

26. Motor line, outside light details, inverter Line, Hometheatre separate lining.

27. Bathroom exhaust fan to be fitted in both bathrooms and to be selected by customer

28. Back door to be fitted and along with a safety gate.

29. All windows in Front elevation should be designer glass and balance should be French
windows.

30. Safety Gate in Main Door and also in the Back Door

31. Water Proofing of Terrace??


32. Chrome Plated brass fittings steel shall be used for all door fittings

33. All wiring shall have copper conductor and adequate routing for lighting and power loads.-
finolex FRLS

34. Total Basement Height from road level to be confirmed once again??

35. Each Bedroom one loft design to be clarified and also cupboard made of granite to be fitted-
1.5 Feet.-discuss with father

36. Roof Heigth to be clarified??

37. Pavement all along the house with cement concrete slab laying

38. All cupboards to glass door/wooden door sliding shutter closed

39. Pooja Room with wooden door closed

40. Doors and window frame cross sections to be clarified??

41.Spot light to be added

Electrical Points:

1.Hall: Light Points-4 Nos,Fan Point -2 Nos,5 Amps Plug -3 Nos.Chandelier Point -1No

15Amps- 3 Nos+ TV Point+Television Point,AC point provision, floor light

provision,calling bell provision

2. Mater Bed room and Guest Bed room: Light Points-2Nos, Fan Point-1Nos, AC Point-1No,
floor light provision, television point provision- 1 No; 5 Amps- 3Nos switches for computer –
telephone Point provision

3. Two points 15 Amps provision.


 Two points 5 Amps.
 Chimney point provision.

One point for water filters provision