You are on page 1of 2

UNISIM ON-LINE

Year 11, Number 1


97th edition
December, 2015

UNISIM-I-M: Benchmark Case Proposal for Oil Reservoir Management Decision-Making


Ana Teresa Ferreira da Silva Gaspar

Introduction duplicated.
This edition presents the development of the UNI- We applied a probabilistic history-matching
“UNISIM-I-M takes on spe- SIM-I-M benchmark case, a set of simulation mo- process to reduce the number of scenarios accor-
dels representing the field and the information ding to the methodology proposed by Almeida
cial importance due to the required for decision-making analysis in the oil et al (2014) and Avansi and Schiozer (2015b).
lack of benchmark cases field management phase, giving continuity to The misfit between the models and the produc-
UNISIM-I benchmark studies. Using the feedback tion history data were evaluated by quantifica-
with known answers and
from previous benchmark cases - UNISIM-I-D tion and diagnostic procedures considering ac-
complete reservoir models (Gaspar et al, 2015) and UNISIM-I-R (Avansi ceptance levels and 78 objective functions simul-
comprising geological, and Schiozer, 2015a) - we present a proposal taneously. The number of objective functions deri-
specifically for the management phase, the peri- ved from 4.
operational and economic od after strategy implementation. objective functions for each producer and 2 for
scenarios.” each injector, considering oil production rates,
UNISIM-I-M is designed for research activities on
decision analysis to select exploitation strategies water production rates, gas production rates,
in the reservoir management phase. This work producer bottom-hole pressures, water injection
presents the results of the construction of this ben- rates and injector bottom-hole pressures.
chmark and how it can be used. This yielded a set of 48 scenarios honoring the
UNISIM-I-M considers an exploitation strategy dynamic data with local modifications. Then, we
(Avansi and Schiozer, 2015a) already in place in added the technical uncertainties concerning
the initial stage of the field development and availability of systems and considered the econo-
Specials interests: waterflooding project with 25 wells (14 produ- mic scenario. The technical uncertainties were also
cers and 11 injectors) with history production combined using DLHG.
data for the first 7 years.
 UNISIM Therefore, a set of 48 scenarios honoring the
 UNISIM Publications Figure 1 presents a map of intermediate layer history data and considering all uncertainties
oil per unit area with the implanted strategy compose the probabilistic case.
 Reservoir Simulation and aiming to show the disposition of wells. A model close to P50 in all main indicators (net
Management Portal present value - NPV, cumulative oil, water and
 Previous Issues gas productions - Np, Wp and Gp, cumulative
water injection - Wi and oil recovery factor -

Links:
 UNICAMP
 Cepetro
 Petroleum Engineering Figure 1: Implanted strategy - Map in intermediate
layer oil per unit area.
Division
 School of Mechanical Uncertainties
Engineering Uncertainties include: PVT data; oil-water con-
 Petroleum Sciences and tact; water relative permeability; vertical perme-
ability multiplier; rock compressibility; 500 ima-
Engineering
ges with petrophysical characteristics related to
facies, net-to-gross ratio, porosity, horizontal and
vertical permeabilities; systems availability infor-
mation; and economic scenarios. The simulation
model, with affordable simulation time, is based
on a reference model reflecting the characteris-
tics of Namorado Field, Campos Basin in Brazil
comprising real and synthetic data from the ap-
Graduate: praisal phase.
Petroleum Sciences and
Construction of UNISIM-I-M
Engineering: interested in
Based on a geological model, we used Discreti-
Masters and PhD in the zed Latin Hypercube with geostatistical realizati-
Simulation and Oil Reser- ons - DLHG (Schiozer et al, 2015) to sample and
voir Management area click combine with other uncertainties to generate
2000 possible scenarios. We obtained 1985
here. possible scenarios because some simulations were
Página 2 UNISIM ON-LINE

and risk analysis techniques. It provides challen-


ges to test techniques for decision analysis in the
management phase due to the uncertainties and
complexity involved, constraints and the design
“UNISIM-I-M provides and control variables to be optimized.
challenges to test techni- UNISIM-I-M takes on special importance due to
the lack of benchmark cases with known answers
ques for decision analysis and complete reservoir models comprising geolo-
in the management phase gical, operational and economic scenarios.
due to the uncertainties Participants are encouraged to discuss methods,
and complexity involved, Figure 2: Risk curve of 48 scenarios for Np, Wp, Wi results and challenges to validate different pro-
and NPV objective functions highlighting the selected cedures to select the management strategy. To
constraints and the design enable a fair comparison a set of results data
base case.
and control variables to with complete documentation of assumptions
RFo) for the given exploitation strategy was se- should be reported.
be optimized.” lected as base case. Figure 2 presents the risk
curve for some objective functions (Np, Wp, Wi References
and NPV). ALMEIDA, la R., F., DAVOLIO, A., SCHIOZER, D.J.,
Proposal of the benchmark case “A New Approach to Perform a Probabilistic and
Multi-Objective History Matching.”Proceedings of
This benchmark proposes the optimization of the SPE Annual Technical Conference and Exhibi-
future design and/or control variables of the tion, Amsterdam, The Netherlands, 27-29 Octo-
exploitation strategy for the remaining 23 years, ber 2014.
such as infill drilling, recompletion, well conversi-
UNISIM on, conditions for shutting wells, and intelligent AVANSI, G.D., SCHIOZER, D.J., “UNISIM-I:
valves. To develop the benchmark, the studies Synthetic Model for Reservoir Development and
opportunities: should consider deterministic and probabilistic Management Applications”. International Journal
approaches using reservoir simulation, economic of Modeling and Simulation for the Petroleum
If you are interested in and risk analysis. All main probabilistic parame- Industry, v.9, pp. 21-30, April 2015a, Brazil.
working or developing ters are specified to allow a complete evalua- AVANSI, G.D., SCHIOZER, D.J., “A New Appro-
research in the UNISIM tion. ach to History Matching Using Reservoir Charac-
Group, please contact us. Deterministic and Probabilistic Approaches terization and Reservoir Simulation Integrated
Immediate interest in: Studies”. OTC-26038-MS. Proceedings of the
The objectives of the UNISIM-I-M deterministic Offshore Technology Conference, Houston, Te-
 Researcher in the simu- and probabilistic approaches are to optimize the xas, USA, 4-7 May, 2015b.
lation area, manage- design and control variables of the provided
ment and reservoir cha- exploitation strategy between tM (after the stra- GASPAR, A.T.F.S., SANTOS, A.A.S., AVANSI,
racterization. tegy implantation in development phase) until the G.D., HOHENDORFF FILHO, J. C.V., SCHIOZER,
maximum final time tF. D.J., “UNISIM-I-D: Benchmark Studies of Oil Field
For further information, Development Strategy Selection”. International
click here. This project considers the management phase, the Journal of Modeling and Simulation for the Pe-
period after the strategy implantation. In this troleum Industry, v.9, pp. 47-55, April 2015,
phase, design and/or control variables should be Brazil.
optimized, such as infill drilling, recompletion,
well conversion and conditions for wells shut-in, SCHIOZER, D.J, AVANSI, G.D., SANTOS, A.A.S..
use of intelligent valves, among others. “Risk Quantification Combining Geoestatistical
Realizations and Discretized Latin Hypercube”.
Some important dates, assumptions, information Submitted to Journal of the Brazilian Society of
and data should be considered. The dataset is Mechanical Sciences and Engineering, 2015.
publicly available at UNISIM-I webpage: http://
www.unisim.cepetro.unicamp.br/benchmarks/br/ About author:
unisim-i/unisim-i-m. Ana Teresa Gaspar holds a chemical engineering
degree from the State University of Maringá, a
Conclusions
M.A. in chemical engineering and a Ph.D. in pe-
Research in Reservoir Simu- To conclude, UNISIM-I-M enables tests, applica- troleum engineering both from UNICAMP. She is
lation and Management tion, validation of existing and new methodologi- a researcher at UNISIM since 2007 working on
Group es; and comparison of the results of research decision analysis in E&P projects, reservoir simu-
institutes, universities and oil companies regar- lation and optimization of petroleum exploitation
Petroleum Engineering Divisi- ding control exploitation strategy optimization strategies.
on - Energy Department
School Of Mechanical Engine-
ering
Center for Petroleum Studies For further information, please visit
University of Campinas http://www.unisim.cepetro.unicamp.br
Campinas - SP
Phone: 55-19-3521-1220 The UNISIM Research Group is part of UNICAMP (Petroleum Engineering Division, Energy
Fax: 55-19-3289-4916
Department, School of Mechanical Engineering, Center for Petroleum Studies) that aims to
unisim@dep.fem.unicamp.br develop Works and projects in the simulation and reservoir management area.

You might also like