HOTT Engineeringlnc.
‘web: wanwielusa.com $380 Tickum Re
phone: 770-517-5507 Bldg 600, Sute 100,
fax 770-517-8508 Woodstock, GA 30188
Structural Engineering
Design Rules of Thumb
In the early stages of a project, we are often I
asked how large sutra eles wil be [
before we have hada chance to perform the
necessary computations We have found the
folowing rules of thumb tobe useful p|H
mating the approximate depth fa struc
tember wel 5 eveing the resonao
ness of a design. -—>—J
important to note, however, that the depth of a
beri influenced not only by the span but by
such variables as spacing, loads, support conditions,
lections, and clearance requirements, as well. The
Semen ise sould be based on computa-
Holow Gore Reor Sab Tao ne Mears enn
Hotow Gor Root Sab L/atot/50 ‘Sota agi
Prestressed Flor Tw L/5t0L 35)
Prestressed Roo Te L/a5t01 [40 Tat
Prestressed Beam Taio 720 Hi30
ostnson Bean Lat
Postion Grae LAs Ta
Postension Jost a6 THe
Pstension Two-Way SB Lat
Two-Vay Slab ‘Sub Patino 180_] | Gonposte Foo Beam Tre
Sab w Op Panes WE rill Lae
2b Liz tr
Sab Sp SL Lao Truss i
‘Sab One End Cont | L/24 Space Fane Lek Teo
‘One-Way Sab Bot Ends Cont Gis Le
‘Wo0d.
Nomi Jost Liz
eo Nomina Sussor Tass SD ae
it Career Bot Choe Pic 2
of Top Chord Pi
Lia
Leite
Tier Gale Tss LB,
Fist For Coun Timber Flt Truss LBW LTD