You are on page 1of 1
HOTT Engineeringlnc. ‘web: wanwielusa.com $380 Tickum Re phone: 770-517-5507 Bldg 600, Sute 100, fax 770-517-8508 Woodstock, GA 30188 Structural Engineering Design Rules of Thumb In the early stages of a project, we are often I asked how large sutra eles wil be [ before we have hada chance to perform the necessary computations We have found the folowing rules of thumb tobe useful p|H mating the approximate depth fa struc tember wel 5 eveing the resonao ness of a design. -—>—J important to note, however, that the depth of a beri influenced not only by the span but by such variables as spacing, loads, support conditions, lections, and clearance requirements, as well. The Semen ise sould be based on computa- Holow Gore Reor Sab Tao ne Mears enn Hotow Gor Root Sab L/atot/50 ‘Sota agi Prestressed Flor Tw L/5t0L 35) Prestressed Roo Te L/a5t01 [40 Tat Prestressed Beam Taio 720 Hi30 ostnson Bean Lat Postion Grae LAs Ta Postension Jost a6 THe Pstension Two-Way SB Lat Two-Vay Slab ‘Sub Patino 180_] | Gonposte Foo Beam Tre Sab w Op Panes WE rill Lae 2b Liz tr Sab Sp SL Lao Truss i ‘Sab One End Cont | L/24 Space Fane Lek Teo ‘One-Way Sab Bot Ends Cont Gis Le ‘Wo0d. Nomi Jost Liz eo Nomina Sussor Tass SD ae it Career Bot Choe Pic 2 of Top Chord Pi Lia Leite Tier Gale Tss LB, Fist For Coun Timber Flt Truss LBW LTD

You might also like