Professional Documents
Culture Documents
Plant Level Valuation : IF you want to PP and Product costing then its mandatory to have plant Level
and if the material price is varing at different plant then we go for Plant level.
Company code Level Valuation: Ie Price of Material is same at all plant is same.
Plant:
It is always advised to create plant by coping Pre configured plant(0001). As it have the required settings
Storage Location:
The use of copy pre configured plant it copies the entire Store.
So that now we can change the assigned store and maintain address of the storage location
Purchase Organization:
Assignment:
Is only is possible if no stock exits then only we can it is possible. Since stock exists then it has value
which inturn depends on valuation type.
We can Delete the Material at Plant level or Storage location level or at the toppest Material level ie for
all plants.