MUNICIPAL ADMINISTRATION DEPARTMENT

REPORT ON DISPOSAL OF DRY WASTE

Qty ofDry waste


S.No Name of the ULB Place of disposal (DumpYard/MRFs)
disposed (in MT)

1 2 3 4

1 Tadepalligudem 25 Dump Yard


REPORT ON DISPOSAL OF WET WASTE

Whether Waste Quantity of wet Whether


Quantity of Wet If Not, Timeline
to Compost waste sent to Authorization
S.No Name of the ULB Waste Generated (in for
Plants setup or compost plant from APPCB
MTs) Establishment
not (in MTs, so far) obtained

1 2 3 4 5 6 7

1 Tadepalligudem 45 - - 28-Feb-20 -
MUNICIPAL ADMINISTRATION DEPARTMENT
REPORT ON BULK WASTE GENERATORS

No. of Bulk Waste Quantity of Wet waste


No. of BWGs practising on
S.No Name of the ULB Generators Identified, Processed
site proessing of Wet Waste
so far (in Kgs)

1 2 3 4 5

1 Tadepalligudem 31 - -
ICIPAL ADMINISTRATION DEPARTMENT
EPORT ON BULK WASTE GENERATORS

Whether Teams constituted for Date by which the balance BWGs


If Yes, details of the Team
inspecting BWGs to ensure BWGs are practice on site processing of Wet
Members
practicing onsite processing Waste

6 7 8

- - 28-Feb-2020
Alternative for Waste to Energy Plant and Waste to Compost Plant (Compos

Whether any waste to Whether Waste to


S.No Name of the ULB energy processing Type of Plant? Details of Plant Compost established or
facility established? not?

1 2 3 4 5 6

1 Tadepalligudem - - - -
ompost Plant (Compost Plants initiated by ULBs)

Revenue generated from selling


If yes, type of Waste to Compost Quantity of Wet waste
compost
plant?(Windrow/Vermi, etc) processed (In MTs)
(in Rs.)

7 8 9

- - -
MUNICIPAL ADMINISTRATION DEPARTM

REPORT ON PREPARATION AND NOTIFICATION OF BYE-LAWS UNDER GO Ms.No. 348,

Implementation on Collection of User Fee for SWM Implementation on Collection

If Yes, Date from


Amount collected till Whether ULB is
S.No Name of the ULB Whether ULB is collecting which the User Fee
date e for SWM (in collecting User Fee
User Fee for SWM (Yes/No) is Being Collected
Rs.) for C&D (Yes/No)
for SWM

1 2 3 4 5 6

1 Tadepalligudem Yes 31-Jan-2020 40000 -


DMINISTRATION DEPARTMENT

LAWS UNDER GO Ms.No. 348, 349 & 350, dated 29.10.2018 of MA&UD Department
Implementation of levy of fines/penality for Open
Implementation on Collection of User Fee for C&D waste
buring and littering of solid waste

Whether ULB is
Whether ULB is
If Yes, Date from implementing levy
implementing levy Amount
which the User Fee Amount collected till of penalities/ fines Remarks
of penalities/ fines collected till
is Being Collected date for C&D (in Rs.) for open burning
for open burning date (in Rs.)
for C&D and littering
(Yes/No)
(Yes/No)

7 8 9 10 11 12

- - - - - -
MUNICIPAL ADMINISTRATION DEPARTMENT
REPORT ON IMPLEMENTATION OF WASTE MANAGEMENT RULES IN MODEL TOWNS
Name of the ULB
S.No Activity
Tadepalligudem
Door to Door Garbage
1
Collection
a) No. of Households 27132
b) No. of Households covered
with Door-to-Door Garbage 27132
collection
c) % of Door to Door
100%
collection
2 Source Segregation

a) No. of Households covered


10000
with source segregation

c) % of source segregation 36.85%


Details of processing of wet Proposed for processing by
3
waste Windrows system
No. of HHs practicing Home
4
Composting 102
5 No. of BWG's identified 31
a) No. of BWGs practcing
onsite composting -
Bio-Mining of legacy Waste
6
(Yes/No) -
a) Quantity of Legacy waste at
Dumpyard 26000 MT
b)Quantity of Legacy waste
processed -
Establishment of Scientific
7
Landfill -
8 Plastic Waste Management Yes
a) Establishment of MRF
(Yes/No) Under Tender Process
b) Quantity of dry waste send
to MRF -

c) Quantity of Recyclable
plastic waste sent to Recyclers
-

d) Quantity of Non Recyclable


plastic sent to cement plants
-
e) Quantity of plastic waste
used in road construction (in
MTs) & length of road laid (in
Kms) -
9 C&D waste Processed
a)Quantity of C&D waste
1.25 MT
generated (in MT per day)
b)Quantity of C&D waste
collected (in MT) -
c)Quantity of C&D waste
processed (in MT) -
Whether notificated the Bye
10 Laws as per GO Ms. Nos 348, Yes
349 & 350
Whether User Fees collecting
11 on Waste Management Yes
Activities (Yes/No)

Whether Levy of Penalties on


12 open burning, lettering of
waste in public places etc.
-
Whether committees
constituted in the ULB to
13 monitor the implementation Yes
of all Waste managemenr
Rules,NGT directions etc.
Whether CCTV Cameras
14
Installed at Dump Site Under Tender Process
Awareness Campaigns
15
conducted Yes
Sewarage Treatment Plants
16 -
(STPs)
a) Quantity of sewage
-
generated
b) No. of Existing STPs in the
-
ULBs & capacity
c) No. of STPs under
construction in the ULBs &
-
capacity & date by which
construction completed
d) Quantity of sewage water
-
treated & reused
e) Whether there is any
proposal for balance treated -
sewage water for reuse
MUNICIPAL ADMINISTRATION DEPARTMENT

STATUS ON PROCESSING OF LEGACY WASTE IN THE ULBs


Action Taken to Process the
Ownership Whether
of land DPR If Yes, If Yes,
Extent/
(Govt/priv prepared whether whethe
S.No Name of the ULB Dump site Location Area (in
ate/Unof for Bio- Tenders r Work
Acres)
cial mining on called Order
dumping) pilot basis for issued
(Yes/No)
1 2 3 4 5 6 7 8
Kunchena Palli Villge, Near
1 Tadepalligudem ULB 14.72 Under Process - -
Electrical Sub- Station
DMINISTRATION DEPARTMENT

SING OF LEGACY WASTE IN THE ULBs


Action Taken to Process the Legacy Waste

If Yes, Quantity
If Yes,
Agency to of waste Area/Land Ground water analysis
whether report
which the treated Reclaimed
Work
work is so far (in (in Acres)
commenced
entrusted MTs)

9 10 11 12 13

_ - - - -
MUNICIPAL ADMINISTRATION DEPARTMENT

STATUS REPORT ON COLLECTION OF PLASTIC WASTE BY THE PRODUCERS/BRAND OWNERS/IMPORTERS UNDER EXT
PRODUCER RESPONSIBILITY (EPR) IN THE ULBs

Whether waste
If Yes, Details of Brand
collection system based If collecting,
S.No Name of the ULB Owner/Producer/Importer,
on EPR started in the Furnish details
Who started the system
ULB

1 2 3 4 5

1 Tadepalligudem - - -
IPAL ADMINISTRATION DEPARTMENT

WASTE BY THE PRODUCERS/BRAND OWNERS/IMPORTERS UNDER EXTENDED


CER RESPONSIBILITY (EPR) IN THE ULBs

If No, Timeline to start

-
MUNICIPAL ADMINISTRATION DEPARTMENT

REPORT ON LEVY OF PENALTIES FOR MANUFACTURING AND SELLING <50 MICRONS BAGS AND PENALTIES FOR OPEN BURN
PLASTIC WASTE

Whether penalty
If Yes,
No of Teams imposed on Amount
No of Inspections / Quantity
Constituted for manufacturing collected so
S.No Name of the ULB Raids conducted so seized (in
Raids/ /selling <50 microns far
far Kgs)
Inspections plastic carry bags (in Rs.)
(Yes/No)

1 2 3 4 5 6 7

1 Tadepalligudem 3 48 Yes - 82000


L ADMINISTRATION DEPARTMENT

SELLING <50 MICRONS BAGS AND PENALTIES FOR OPEN BURNING AND DUMPING OF
PLASTIC WASTE

Whether penalty
If Yes,
imposed on open
Amount
burning of plastic
collected (in
waste and dumping of
Rs.)
plastic waste (Yes/No)

8 9

- -
MUNICIPAL ADMINISTRATION DEPARTMENT

REPORT ON CHANNELIZING PLASTIC WASTE WITH CEMENT PLANTS


Details of Plastic was
Quantity of construct
Whether the Plastic
Whether the ULB plastic Quantity of plastic
If yes,details of the Waste is being
has tied up with waste sent waste deposited in
Sl.No Name of the ULB plant with whom used in road
nearby cement to Cement the storage point? Quantity Used
tied up construction
plant (Yes/No) Plant (In MTs) (In MTs)
(Yes/No)
(In MT)

1 2 3 4 5 6 7 8

1 Tadepalligudem - - - - - -
NISTRATION DEPARTMENT

LASTIC WASTE WITH CEMENT PLANTS


Details of Plastic waste used in road
construction

Length of road laid


(In KMs)

-
MUNICIPAL ADMINISTRATION DEPARTMENT
STATUS ON HOME COMPOSTING IN THE ULBs

Whether public No of
awareness Cumulative No. of Paryavarana
campaigns public awareness Mitras engaged
S. No Name of the ULB
conducted on campaigns for
Home conducted demonstration
Composting purpose

1 2 3 4 5

1 Tadepalligudem yes 122 101


ADMINISTRATION DEPARTMENT
HOME COMPOSTING IN THE ULBs

Cumulative No.
of House Holds
practicing Home
Composting

102
MUNICIPAL ADMINISTRATION DEPARTMENT
STATUS REPORT ON FIXING OF WIRENETS/MESH IN STORM WATER DRAIN DISPOSAL POINTS IN THE ULBs

No of vulnerable points
If No,Date by which
where Drains are Whether Wire nets/mesh
wire nets will be
S.No Name of the ULB connected to Water are in place at vulnerable
placed at vulnerable
bodies and drain water disposal points
disposal points
is being disposed

(1) (2) (3) (4) (5)

1 Tadepalligudem - - -
MUNICIPAL ADMINISTRATION DEPARTMENT
WIRENETS/MESH IN STORM WATER DRAIN DISPOSAL POINTS IN THE ULBs

Remarks,if any

(6)

-
MUNICIPAL ADMINISTRATION DEPARTMENT
Report on usage of vehicle Tracking devices in the ULBs
Total No of
S.NO Name of the ULB Vechicles (SAC Tracking Devices fixed
provided)

1 Tadepalligudem 5 5
TION DEPARTMENT
king devices in the ULBs

Tracking Devices Not fixed Timeline

0 -
MUNICIPAL ADMINISTRATION DEPARTMENT
Report on usage of Computerized Weighing Machines in UL

Total No of Total No of weighing


S.NO Name of the ULB Target weighing machines in working
machines supplied condition

1 Tadepalligudem 1 Nil Nil


ION DEPARTMENT
eighing Machines in ULBs

Total No of weighing machines are not in


Timeline
working condition

Nil 31.03.2020
MUNICIPAL ADMINISTRATION DEPARTMENT
REPORT ON IMPLEMENTATION OF C&D WASTE MANAGEMENT RULES IN THE ULB

Whether the Whether the Quantity of


Quantity
Quantity of ULB has ULB has C&D waste
disposed
C&D waste established established If Yes, Mention the sent to C&D
Sl.No Name of the ULB in dump
generated C&D Waste C&D Name & Location Processing
site (in
(TPD) Collection Processing Plant
MT)
centre (Yes/No) Plant? (in MT)

1 2 3 4 7 8 9 10

1 Tadepalligudem 1.25 MT - - - - 11 MT
PAL ADMINISTRATION DEPARTMENT
TION OF C&D WASTE MANAGEMENT RULES IN THE ULB

Timeline

11

-
MUNICIPAL ADMINISTRATION DEPARTMENT
REPORT ON INSTALLATION OF CCTV CAMERAS AT DUMPSITES IN T
Sl Whether CCTV Cameras are
Name of the ULB
No. installed in dump yard
1 2 3

1 Tadepalligudem -
MUNICIPAL ADMINISTRATION DEPARTMENT
REPORT ON INSTALLATION OF CCTV CAMERAS AT DUMPSITES IN THE ULBs

Reasons for not Installation?

Under Tender Process