BAYATAN-BURGOS CE 332

BASE SHEAR SHEAR CALCULATIONS

DESIGN PARA METE

Wt1-4= 3124.345
Occupancy Category: I
Seismic Zone: 4
Distance to Source (km): 7.6 km
Seismic Source Type: A
Soil Profile Type: SD
Structural System: SMRF

I= 1 W(kN) hx(m)
z= 0.4 Roof Deck 736.759 3
R= 8.5 4th fl. 839.471 3
W= Kn 3124.345 3rd fl. 839.471 3
Ca=0.44Na= 0.48752 2nd fl. 839.471 3
Cv=0.64Nv= 0.90624 ∑= 3255.17 12
Na= 1.108
Nv= 1.416
Ct= 0.0731

3/4
T=Ct(Hn) Ft=0.07TV ≤ 0.25V
3/4
T=0.0731(12) Ft= 0 kN
T=0.471 sec Ft= 111.999 kN Ftmax

Tdesign= 0.613 sec

BASE SHEAR(V)
V=CvIW/RT 566.157808 KN
2.5CaIW/R 447.994316 KN
.11CaIW 167.549874 KN
.80zNvIW/R 166.553318 KN
Vdesign 447.994316 KN

STOREY DISTRIBUTION OF BASE SHEAR(V)


Level hx Wx Wxhx Fx Vx Mx
RD 12 2811.084 33733.01 164.751 164.751 494.252
4 9 3221.93 28997.37 141.622 306.372 1907.62
3 6 3221.93 19331.58 94.2995 400.672 4523.01
2 3 3221.93 9665.79 47.2073 447.879 8482.03
91727.75 447.879
BAYATAN-BURGOS CE 332

SUBJECT BUILDING WEIGHT CACULATION SECOND FLOOR


STRUCTURAL MEMBERS
SLAB B(m) H(m) L(m) Quantity d Unit Weight Unit x y Wx Wy
9.684 6.95 0.1 1 23.56 kN/m3 272.9842128 kN 4 4.842 1091.936851 1321.789558
2.45 4 0.1 1 23.56 kN/m3 16.66 kN 2 1.225 33.32 20.4085
area= 77.1038

BEAMS
GRID A 0.25 0.25 8.634 1 23.56 kN/m3 12.713565 kN 0 5.4415 0 69.18086395
GRID B 0.25 0.25 8.634 1 23.56 kN/m3 12.713565 kN 4 5.4415 50.85426 69.18086395
GRID C 0.25 0.25 8.634 1 23.56 kN/m3 12.713565 kN 8 5.4415 101.70852 69.18086395
GRID 4 0.2 0.2 8 1 23.56 kN/m3 7.5392 kN 4 0 30.1568 0
GRID 3 0.25 0.25 8 1 23.56 kN/m3 11.78 kN 4 2.45 47.12 28.861
GRID 2 0.2 0.2 8 1 23.56 kN/m3 7.5392 kN 4 6.667 30.1568 50.2638464
GRID 1 0.2 0.2 4 1 23.56 kN/m3 3.7696 kN 4 10.884 15.0784 41.0283264
GRID A2-1 0.2 0.2 2.45 1 23.56 kN/m3 2.30888 kN 0 1.225 0 2.828378
GRID B2-1 0.2 0.2 2.45 1 23.56 kN/m3 2.30888 kN 2 1.225 4.61776 2.828378
IB-A 0.2 0.2 4 1 23.56 kN/m3 3.7696 kN 2.1 5.167 7.91616 19.4775232
IB-3 0.2 0.2 2.45 1 23.56 kN/m3 2.30888 kN 2.7 1.225 6.233976 2.828378
W= 79.464935 293.842676 355.6584218
COLUMNS
C-1 ABC 0.35 0.35 3 3 23.56 kN/m3 25.9749 kN 4 11.084 103.8996 287.9057916
C-1 AC 0.35 0.35 3 2 23.56 kN/m3 17.3166 kN 4 6.667 69.2664 115.4497722
C-2 0.35 0.35 3 1 23.56 kN/m3 8.6583 kN 4 6.667 34.6332 57.7248861
C-1 ABC 0.35 0.35 3 3 23.56 kN/m3 25.9749 kN 4 2.45 103.8996 63.638505
C-1 AB 0.35 0.35 3 2 23.56 kN/m3 17.3166 kN 2 0 34.6332 0
W= 95.2413 346.332 524.7189549
SIDL PARTITIONS
Firewall 3.1kPa
interior wall 3 Kpa
wall height 2.7 m
G-A 1 1 9.483 1 6.12 kN/m3 58.03596 kN 0 6.542 0 379.6712503
G-B 1 1 9.833 1 6.12 kN/m3 60.17796 kN 4 6.542 240.71184 393.6842143
G-C 1 1 9.833 1 6.12 kN/m3 60.17796 kN 8 6.542 481.42368 393.6842143
G-4 1 1 6.95 1 6.12 kN/m3 42.534 kN 4 10.883 170.136 462.897522
G-3 1 1 6.95 1 6.12 kN/m3 42.534 kN 4 6.666 170.136 283.531644
G-2 1 1 6.95 1 6.12 kN/m3 42.534 kN 4 2.45 170.136 104.2083
G-1 1 1 4 1 6.12 kN/m3 24.48 kN 2 0 48.96 0
W= 330.47388 1281.50352 2017.677145
RAILINGS
LOAD UNIT L(m) Weight Unit x y Wx Wy
R-4 1 kN/m 3.5 3.5 KN 2.225 0.75 7.7875 2.625
R-3 1 kN/m 3.5 3.5 KN 2.225 3.95 7.7875 13.825
W= 7 15.575 16.45
STAIRS
S-1 7.2 kN/m 1.5 10.8 KN 2.225 0.75 24.03 8.1
S-2 7.2 kN/m 1.5 10.8 KN 2.225 3.95 24.03 42.66
W= 21.6 48.06 50.76
Wt= 806.7643278 total= 3077.250047 4287.05408
Second Floor W= 806.764328 kN
Xc.g= 3.814311 m
Yc.g= 5.31388651 m
w= 10.4633537 kPa
BAYATAN-BURGOS CE 332
BAYATAN-BURGOS CE 332

SUBJECT BUILDING WEIGHT CACULATION THIRD FLOOR


STRUCTURAL MEMBERS
SLAB B(m) H(m) L(m) Quantity d Unit Weight Unit x y Wx Wy
9.684 6.95 0.1 1 23.56 kN/m3 272.9842 kN 4 4.842 1091.937 1321.79
2.45 4 0.1 1 23.56 kN/m3 16.66 kN 2 1.225 33.32 20.4085
area= 77.1038

BEAMS
GRID A 0.25 0.25 8.634 1 23.56 kN/m3 12.71357 kN 0 5.4415 0 69.18086
GRID B 0.25 0.25 8.634 1 23.56 kN/m3 12.71357 kN 4 5.4415 50.85426 69.18086
GRID C 0.25 0.25 8.634 1 23.56 kN/m3 12.71357 kN 8 5.4415 101.7085 69.18086
GRID 4 0.2 0.2 8 1 23.56 kN/m3 7.5392 kN 4 0 30.1568 0
GRID 3 0.25 0.25 8 1 23.56 kN/m3 11.78 kN 4 2.45 47.12 28.861
GRID 2 0.2 0.2 8 1 23.56 kN/m3 7.5392 kN 4 6.667 30.1568 50.26385
GRID 1 0.2 0.2 4 1 23.56 kN/m3 3.7696 kN 4 10.884 15.0784 41.02833
GRID A2-1 0.2 0.2 2.45 1 23.56 kN/m3 2.30888 kN 0 1.225 0 2.828378
GRID B2-1 0.2 0.2 2.45 1 23.56 kN/m3 2.30888 kN 2 1.225 4.61776 2.828378
IB-A 0.2 0.2 4 1 23.56 kN/m3 3.7696 kN 2.1 5.167 7.91616 19.47752
IB-3 0.2 0.2 2.45 1 23.56 kN/m3 2.30888 kN 2.7 1.225 6.233976 2.828378
W= 79.46494 293.8427 355.6584
COLUMNS
C-1 ABC 0.35 0.35 3 3 23.56 kN/m3 25.9749 kN 4 11.084 103.8996 287.9058
C-1 AC 0.35 0.35 3 2 23.56 kN/m3 17.3166 kN 4 6.667 69.2664 115.4498
C-2 0.35 0.35 3 1 23.56 kN/m3 8.6583 kN 4 6.667 34.6332 57.72489
C-1 ABC 0.35 0.35 3 3 23.56 kN/m3 25.9749 kN 4 2.45 103.8996 63.63851
C-1 AB 0.35 0.35 3 2 23.56 kN/m3 17.3166 kN 2 0 34.6332 0
W= 95.2413 346.332 524.719
SIDL PARTITIONS
Firewall 3.1kPa
interior wall 3 Kpa
wall height 2.7 m
G-A 1 1 9.483 1 6.12 kN/m3 58.03596 kN 0 6.542 0 379.6713
G-B 1 1 9.833 1 6.12 kN/m3 60.17796 kN 4 6.542 240.7118 393.6842
G-C 1 1 9.833 1 6.12 kN/m3 60.17796 kN 8 6.542 481.4237 393.6842
G-4 1 1 6.95 1 6.12 kN/m3 42.534 kN 4 10.883 170.136 462.8975
G-3 1 1 6.95 1 6.12 kN/m3 42.534 kN 4 6.666 170.136 283.5316
G-2 1 1 6.95 1 6.12 kN/m3 42.534 kN 4 2.45 170.136 104.2083
G-1 1 1 4 1 6.12 kN/m3 24.48 kN 2 0 48.96 0
W= 330.4739 1281.504 2017.677
RAILINGS
LOAD UNIT L(m) Weight Unit x y Wx Wy
R-4 1 kN/m 3.5 3.5 KN 2.225 0.75 7.7875 2.625
R-3 1 kN/m 3.5 3.5 KN 2.225 3.95 7.7875 13.825
W= 7 15.575 16.45
STAIRS
S-1 7.2 kN/m 1.5 10.8 KN 2.225 0.75 24.03 8.1
S-2 7.2 kN/m 1.5 10.8 KN 2.225 3.95 24.03 42.66
W= 21.6 48.06 50.76
Wt= 806.7643 total= 3077.25 4287.054
Second Floor W= 806.7643 kN
Xc.g= 3.814311 m
Yc.g= 5.313887 m
w= 10.46335 kPa
BAYATAN-BURGOS CE 332

SUBJECT BUILDING WEIGHT CACULATION FOURTH FLOOR


STRUCTURAL MEMBERS
SLAB B(m) H(m) L(m) Quantity d Unit Weight Unit x y Wx Wy
9.684 6.95 0.1 1 23.56 kN/m3 272.9842 kN 4 4.842 1091.937 1321.79
2.45 4 0.1 1 23.56 kN/m3 16.66 kN 2 1.225 33.32 20.4085
area= 77.1038

BEAMS
GRID A 0.25 0.25 8.634 1 23.56 kN/m3 12.71357 kN 0 5.4415 0 69.18086
GRID B 0.25 0.25 8.634 1 23.56 kN/m3 12.71357 kN 4 5.4415 50.85426 69.18086
GRID C 0.25 0.25 8.634 1 23.56 kN/m3 12.71357 kN 8 5.4415 101.7085 69.18086
GRID 4 0.2 0.2 8 1 23.56 kN/m3 7.5392 kN 4 0 30.1568 0
GRID 3 0.25 0.25 8 1 23.56 kN/m3 11.78 kN 4 2.45 47.12 28.861
GRID 2 0.2 0.2 8 1 23.56 kN/m3 7.5392 kN 4 6.667 30.1568 50.26385
GRID 1 0.2 0.2 4 1 23.56 kN/m3 3.7696 kN 4 10.884 15.0784 41.02833
GRID A2-1 0.2 0.2 2.45 1 23.56 kN/m3 2.30888 kN 0 1.225 0 2.828378
GRID B2-1 0.2 0.2 2.45 1 23.56 kN/m3 2.30888 kN 2 1.225 4.61776 2.828378
IB-A 0.2 0.2 4 1 23.56 kN/m3 3.7696 kN 2.1 5.167 7.91616 19.47752
IB-3 0.2 0.2 2.45 1 23.56 kN/m3 2.30888 kN 2.7 1.225 6.233976 2.828378
W= 79.46494 293.8427 355.6584
COLUMNS
C-1 ABC 0.35 0.35 3 3 23.56 kN/m3 25.9749 kN 4 11.084 103.8996 287.9058
C-1 AC 0.35 0.35 3 2 23.56 kN/m3 17.3166 kN 4 6.667 69.2664 115.4498
C-2 0.35 0.35 3 1 23.56 kN/m3 8.6583 kN 4 6.667 34.6332 57.72489
C-1 ABC 0.35 0.35 3 3 23.56 kN/m3 25.9749 kN 4 2.45 103.8996 63.63851
C-1 AB 0.35 0.35 3 2 23.56 kN/m3 17.3166 kN 2 0 34.6332 0
W= 95.2413 346.332 524.719
SIDL PARTITIONS
Firewall 3.1kPa
interior wall 3 Kpa
wall height 2.7 m
G-A 1 1 9.483 1 6.12 kN/m3 58.03596 kN 0 6.542 0 379.6713
G-B 1 1 9.833 1 6.12 kN/m3 60.17796 kN 4 6.542 240.7118 393.6842
G-C 1 1 9.833 1 6.12 kN/m3 60.17796 kN 8 6.542 481.4237 393.6842
G-4 1 1 6.95 1 6.12 kN/m3 42.534 kN 4 10.883 170.136 462.8975
G-3 1 1 6.95 1 6.12 kN/m3 42.534 kN 4 6.666 170.136 283.5316
G-2 1 1 6.95 1 6.12 kN/m3 42.534 kN 4 2.45 170.136 104.2083
G-1 1 1 4 1 6.12 kN/m3 24.48 kN 2 0 48.96 0
W= 330.4739 1281.504 2017.677
RAILINGS
LOAD UNIT L(m) Weight Unit x y Wx Wy
R-4 1 kN/m 3.5 3.5 KN 2.225 0.75 7.7875 2.625
R-3 1 kN/m 3.5 3.5 KN 2.225 3.95 7.7875 13.825
W= 7 15.575 16.45
STAIRS
S-1 7.2 kN/m 1.5 10.8 KN 2.225 0.75 24.03 8.1
S-2 7.2 kN/m 1.5 10.8 KN 2.225 3.95 24.03 42.66
W= 21.6 48.06 50.76
Wt= 806.7643 total= 3077.25 4287.054
Second Floor W= 806.7643 kN
Xc.g= 3.814311 m
Yc.g= 5.313887 m
w= 10.46335 kPa
BAYATAN-BURGOS CE 332
BAYATAN-BURGOS CE 332

SUBJECT BUILDING WEIGHT CACULATION ROOF DECK


STRUCTURAL MEMBERS
SLAB B(m) H(m) L(m) Quantity d Unit Weight Unit x y Wx Wy
9.684 6.95 0.1 1 23.56 kN/m3 272.98421 kN 4 4.842 1091.936851 1321.789558
2.45 4 0.1 1 23.56 kN/m3 16.66 kN 2 1.225 33.32 20.4085
area= 77.1038

BEAMS
GRID A 0.25 0.25 8.634 1 23.56 kN/m3 12.713565 kN 0 5.4415 0 69.18086395
GRID B 0.25 0.25 8.634 1 23.56 kN/m3 12.713565 kN 4 5.4415 50.85426 69.18086395
GRID C 0.25 0.25 8.634 1 23.56 kN/m3 12.713565 kN 8 5.4415 101.70852 69.18086395
GRID 4 0.2 0.2 8 1 23.56 kN/m3 7.5392 kN 4 0 30.1568 0
GRID 3 0.25 0.25 8 1 23.56 kN/m3 11.78 kN 4 2.45 47.12 28.861
GRID 2 0.2 0.2 8 1 23.56 kN/m3 7.5392 kN 4 6.667 30.1568 50.2638464
GRID 1 0.2 0.2 4 1 23.56 kN/m3 3.7696 kN 4 10.884 15.0784 41.0283264
GRID A2-1 0.2 0.2 2.45 1 23.56 kN/m3 2.30888 kN 0 1.225 0 2.828378
GRID B2-1 0.2 0.2 2.45 1 23.56 kN/m3 2.30888 kN 2 1.225 4.61776 2.828378
IB-A 0.2 0.2 4 1 23.56 kN/m3 3.7696 kN 2.1 5.167 7.91616 19.4775232
IB-3 0.2 0.2 2.45 1 23.56 kN/m3 2.30888 kN 2.7 1.225 6.233976 2.828378
W= 79.464935 293.842676 355.6584218
COLUMNS
C-1 ABC 0.35 0.35 3 3 23.56 kN/m3 25.9749 kN 4 11.084 103.8996 287.9057916
C-1 AC 0.35 0.35 3 2 23.56 kN/m3 17.3166 kN 4 6.667 69.2664 115.4497722
C-2 0.35 0.35 3 1 23.56 kN/m3 8.6583 kN 4 6.667 34.6332 57.7248861
C-1 ABC 0.35 0.35 3 3 23.56 kN/m3 25.9749 kN 4 2.45 103.8996 63.638505
C-1 AB 0.35 0.35 3 2 23.56 kN/m3 17.3166 kN 2 0 34.6332 0
W= 95.2413 346.332 524.7189549
SIDL PARTITIONS
Firewall 3.1kPa
interior wall 3 Kpa
wall height 2.7 m
G-A 1 1 9.483 1 6.12 kN/m3 58.03596 kN 0 6.542 0 379.6712503
G-C 1 1 9.833 1 6.12 kN/m3 60.17796 kN 8 6.542 481.42368 393.6842143
G-4 1 1 6.95 1 6.12 kN/m3 42.534 kN 4 10.883 170.136 462.897522
G-2 1 1 6.95 1 6.12 kN/m3 42.534 kN 4 2.45 170.136 104.2083
G-1 1 1 4 1 6.12 kN/m3 24.48 kN 2 0 48.96 0
W= 227.76192 870.65568 1340.461287
RAILINGS
LOAD UNIT L(m) Weight Unit x y Wx Wy
R-4 1 kN/m 3.5 3.5 KN 2.225 0.75 7.7875 2.625
R-3 1 kN/m 3.5 3.5 KN 2.225 3.95 7.7875 13.825
W= 7 15.575 16.45
STAIRS
S-1 7.2 kN/m 1.5 10.8 KN 2.225 0.75 24.03 8.1
S-2 7.2 kN/m 1.5 10.8 KN 2.225 3.95 24.03 42.66
W= 21.6 48.06 50.76
Wt= 704.05237 total= 2699.722207 3630.246722
Second Floor W= 704.0524 kN
Xc.g= 3.834547 m
Yc.g= 5.156217 m
w= 9.131228 kPa