You are on page 1of 20
Hence provide outa arrangement consisting of effuent launder with wasn both sides of unde. ‘OUTLET ARRANGEMENT: ‘The outetarangoment consists of oMont wor of Vnotees,efuant under, tet box and 2 pressure cute pipe 1 Ettent Weir Length of event wer plate on pac seo aunder 2 (57.1) = 17888 say 176m Provide 90° notches @ 20 cm conte to canta “otal No. of notehes Average dscharge per notch at average design flow soxtot * -BaeeDx60 8807005” © 58 ¥ 10 ‘cum sec. “Te sche mou a Vreten aen by 8 n 2 Ht OR Geo tan 8 Hi {or peak fow por notch, = 658 x 1.48 10° cums foro, = oad over tow = 1511. 48x10_) 4 9, oss (1814 8x0, 584x295. BT Provo 8 cm deep 0 degree V.notches a 20cm cents to cet, (i ettuent under: ‘9 ciel depth at tow. Cel yp AE OREN Provide adapt of 0.95 m, TYPICAL DETAILS OF SEDIMENTATION TANK DESIGN OF CONVENTIONAL ACTIVATED SLUDGE PROCESS Aeration tank volume: 80 of Invent to ae ‘The dimensions of the t Excess Sludge: wig BOD vemoved = 0.96 whichis between 08 and 19, hence APPENDIX 13.2 DESIGN OF FACULTATIVE AERATED LAGOON S days 7200» § = 98,000 cum, 7 mx 190 mx 4m doep Assume, = 28°C sda @-7) am 0.49 (7, - 18) Sores Estimation of assume Kat 20°C + oF pray Hence at 20 © = o7m1.085 = 072s but et = 2emot oan = sgt = mgt = 38mg = 6% Inother mont of he year, the oeloncy wil be higher and efter SOD Power Requirement sficwney = oay Power needet Aroalpeson 6% and al 800 i removed ecb 06 (1. x 2000 kat, 2408 ugit 100 kat 100 kite (08) ig Oyen) 1625 1 Lo. about 80 HP) 625 KW x 1000 ‘6000 17 Weum facceptabe) 9000 sm. 18500 sqm. (approx) (0.397 sqmporon so APPENOKK 14.1 DESIGN OF TRICKLING FILTER domestic sewage wih a BD, of 200 mal 2.28, The dostod 800, a etuert is 10 ‘Assuming @ 80D loading of 08 4g BOD, spptedin’t excluding reciculation, he volume ot 800, oad 50 200 * 00, loading 08 = 12500m “Tw etisney of st stage iter using NAC ean, f - (honky? (0 F Wi, = S0x 200 = 10.000 Ky 80048 86% ~— 10,000 \\ 12.50032.0088, a 10.44, 505 ‘ 209-19, & 22100 706-104% coping fy eae Thy 65a ioamit soe 100 5.044 TaceaT o7ee “(rom yess My = 2788 )— Rankine's Approach yedin ear case, he volume ct da ee" 10299 Since ota distibutors are auto wxenously ery upto 60m, tis esate to havea east tee uote {SRE soaam Say 60 EEcianey of wo stage Ee = Fora, 095 = 075 +6, (10 A, value tom col 507 Simlay Fy vale fo various, Hore, va simi a values for dierent values fo abtain 95% oteency are TALE t 15, VALUES FOR DIFFERENT VALUES OF E, AND f, TO OBTAIN 95% EFFICIENCY SNe R, Vauve for ve 05% i Eheincy oi 050 700 | 00 050 woo | 300 2 va | sea exo | 250 = wooo | 2000 oor | 200 A mass | 838 mae | 150 [5 | 200 esr [mee 700 | 190 6 250 so | 2500 250 ce z 300 we | 2 300 an.00) 200 v8 vast tae Flor ae ‘Second Stage Fite. fy 8 tes fea, 6Om snd depen 1.5m so somo yec0.20868), 4 1° ‘S601 5 = 101080 gm ‘This is oss than 1800 gir’ and therfore the equaons ste appa. Choosing on gan ning 0.5 Kaiti son 266 5 = 2866 os Adopting apt of 3.0m = 2886 a? ie ong SOCOMCEAA TH) sa 4 2886 P cto fo mavamu perisibie hydra loading of 20 Kin = 9809.83 ecco ant 376m 38 s10 50225 42x50 = 2125 Mid oF 2459 mie “Terelre tow tough wach uot at peak oa = O82 ms su noc wth 8 ams 0208 mis v4 sections of 726m each ‘or every secton of 7.25 m length nthe prepoton as coveted by He rent ongths ss cove by each long of am ‘teen elie. A eres 0875 = 1m2.20 mt A raers! 7.628) « 51268 mF a 422.128 875) 84207 A vee20 Aa, oa a, Sirany Oritees: Assuming da of 25min for he oiios wih Ca value of 06 and head causing ow ep to dlschargatwrougheachontice ~ Cax A y2oh 06 10005 DEES = 0003507 mis Theratee Not Total discharge tough wm Dischare tough wach or 128.36 eay 120 001387 ch section ott ami Sia secton (81.08 100x129 = ao 4 section (3.28 / 86 Spacing of Oxi 1st Secbon 9 Nos, = atom oe 2nd Secton 25 Nos. n725.0m ie, 725105 = adem ele {rd Section 40 Nos. in 725 0m ie.725I40 = tBemele 1h Section 86 Nos, m7250n 48. 72586 + WdeMele a 815254 9 ecamsaysoonm 4) Bisenarge through sth section = 04928 + 6.208 = 60881 w gz Under Drainage System: Total dscharge sec chav ed byte chur “Te iver hve of 8 ier at same RL The Intra placa ot Om cle thor nein sh he perpen te th a porno Average discharge per Intern 0082 ‘ope vetlaton often: arya") = 005815, weomaia 4.7) = (9000389 0.16% = 0081 From Appendix 22 comesponding (a3) = 04758 2.0041 Velocity = = 09190 ou7s8 0.75 mis eqwied check for Velocity at Average Flow Total scary = 50.2480 + 150 = 1.736 0° Flow tough each titer = osramis ‘Average How pari } = 0.00000 ns ca ~ 9.000076 oes e catespondng {a (a5) = 0.1879 Voveciy = {0.0029 01979. 0.16)) = 0.8215 mis (606 mis esr) 19 Segment or x08 - 0.08 Append 26 fer a siope of 05% a we = 01729 3 “Cans = 11001739) (0.1826) 7 = 0.4843. doping 46m oF 046 m 8 8 0.5% slope Ani fortis (6) = 04058 and iad.) + 0.3585, 082 Velocity = © 1.08 ms (> 075 mis required) 0.366540 86" 2nd Segment: 4 = 025x082 =0205 mis \vorical depression a the ent of the Zn seston 0.18 x02 = 0.128 ms Frow that ean be accomeda = 0.240.461 = 0.1108 rs (Assuing + mis veocty) Hence choose a bgner secon say 59cm, Fedesign of It Segment: ae = oorra9 ae” oor7s0 5 = e943 ae Fortis vale, fa 4.) = 027 and iy fay = 0.3778, Veto « 5 1081 mps (> 0.75 ms reqied) oar nose (Check fr Average Flow (i Flow in Segment , (1730/3) 01 = 00579 mis aw posmoxoo1s 5 . = 0.00878 oo 0s'* * os? for this (8/42) = 02119 and yy = 0814 Veloty = = 0.9755 mps (> 075 ms vegies} ans xo5s ke and. Segment 4 = 0205 mis aes = noes we conten Sr Segment

You might also like