JI 2004-FORM-HSE-002
RESIDUAL
SEQUENCE OF RISK
POTENTIAL HAZARDS MITIGATION MEASURES RISK
JOB STEPS RATING
RATING
• Ensure and obtain EOD clearance certificate for the
area from Company
• Ensure all personnel have undergone Project HSE
Induction and EOD training.
Poor Task Planning
• Perform scanning for underground facilities, mark all
underground in drawings, prepare scanning reports 2(B)
Presence of EOD 3(C) LOW
and all the documents should be attached with
MEDIUM permits
• Ensure slit trenching is done before attempting
Mechanical excavation.
• Obtain mark up drawings and clearly identify day’s
scope of work & designated access routes.
• Obtain required Permit to Work in compliance with
KOC SA.004 ( Permit to Work Procedure)
• Ensure to comply with KOC HSEMS Document
Excavation Procedure (KOC.SA.026)
• Ensure Contract Excavation Check list is completed
and attached to Permit.
• Ensure Company Excavation Notification, Permit to
Work, CSE permit (For excavations deeper than 1.2
Pre - work Meters if personnel entry is required) is duly
authorized by Company.
Non-compliance of KOC HSEMS 2(B)
procedure, F & S Regulations
3(C) • All Mobile Plants and equipments (MPE) will be LOW
MEDIUM checked by KOC and a “Valid Clearance Certificate
issued”, prior to equipment use
• Ensure all equipment used is having a valid
Equipment Clearance Certification in accordance
with the KOC HSE SA 013 – Temporary Mobile
Equipment procedure.
• Ensure all firefighting equipment are available and
approved by the company
• Strictly follow Company driving procedures, Kuwait
Ministry of Interior Traffic regulations
• Ensure that the Emergency Numbers are posted at
site, and personnel are informed in the TBT once per
week
Personnel injured due to poor • Ensure proper communication means available 2(B)
communication or having no knowledge 3(C) Mobile Phone – outside Live Plant areas) and in case LOW
of ERP MEDIUM of any emergency contact PIL Construction:
97205041,PILHSE: 97218253/97216597, PMC
Lead: 60683179, PMC HSE: 60630965 and/or KOC
Emergency # 160
Company: Company: Petrofac International Ltd Company: Worley Parsons Kuwait LLC
Signature: