You are on page 1of 4

DCBL Belagavi

Company name : DCBL Location: Mines Date of report:21.09.2019

Participent: Sathish Kumar (Manager HEMM), Anil Guptha (Manager Mines), Mahesha S (Sr.
Engg Mines), Venkatasubranyam (Engineer Mines), Fakruddin (Engineer Mines), Vinayak Responsibility: Venkatasubranyam
(Engineer Mines)

Problem Definition:
What: Dumper tyre (24.00-35) RRO Position tyre Puncher.
Where Mines.
When 28.09.2019 at 1:50 PM
How much New Tyre Life got 1072 Hrs.(Fitted HMR:4564.8 hrs and Removed HMR:5637)
Major root causes of the problem
1 Stone hit observed at the point of puncher zone.
2
3

Control
Implementation of solution ( Total /
Partial/
None) Ease Impact Matrix
S.N. Root Causes Action Responsibility Due Date

Stone hit observed at the point of puncher Haul roads and loading points should be
1 Venkatasubranyam Up Keeping.
zone. kept free of boulders.

Stone hit observed at the point of puncher Regular induction to be done for operator
2 Shift Engineers. Up Keeping.
zone. regarding importance of tyre.

3
Review of Machine Breakdown due to
5 Sathish Kumar.
Such types Tyre damages.
CAUSE - EFFECT CHART

Problem Probable Causes Why-1 Why-2 Why-3 Why-4

Tyre Inflation checked and


Tyre Inflation issue. inflated to 95 psi on
21.09.2019.

Dumper tyre (24.00-


No Air trap found at the
35) RRO Position tyre Defect in tyre.
point of pucher zone.
Puncher.

Tyre tread cut opened Stone hit observed at the


Operational Issue
causing puncher. point of puncher zone.
Why-5 Root Cause

Stone hit observed at the


point of puncher zone.