Participent: Sathish Kumar (Manager HEMM), Anil Guptha (Manager Mines), Mahesha S (Sr.
Engg Mines), Venkatasubranyam (Engineer Mines), Fakruddin (Engineer Mines), Vinayak Responsibility: Venkatasubranyam
(Engineer Mines)
Problem Definition:
What: Dumper tyre (24.00-35) RRO Position tyre Puncher.
Where Mines.
When 28.09.2019 at 1:50 PM
How much New Tyre Life got 1072 Hrs.(Fitted HMR:4564.8 hrs and Removed HMR:5637)
Major root causes of the problem
1 Stone hit observed at the point of puncher zone.
2
3
Control
Implementation of solution ( Total /
Partial/
None) Ease Impact Matrix
S.N. Root Causes Action Responsibility Due Date
Stone hit observed at the point of puncher Haul roads and loading points should be
1 Venkatasubranyam Up Keeping.
zone. kept free of boulders.
Stone hit observed at the point of puncher Regular induction to be done for operator
2 Shift Engineers. Up Keeping.
zone. regarding importance of tyre.
3
Review of Machine Breakdown due to
5 Sathish Kumar.
Such types Tyre damages.
CAUSE - EFFECT CHART