task start date end date no.

of days status
Earthwork 11.1.20 20.1.20 10 completed
P.C.C 21.1.20 31.1.20 11 ongoing
11.1.20 1.3.2
C.R 1st 1.2.20 10.2.20 10 ongoing
C.R 2nd 11.2.20 20.2.20 10 completed Ea rthwork
C.R.3rd 21.2.20 1.3.20 10 ongoing P.C.C
Brickwork 2.3.20 3.3.20 2 completed C.R 1st
R.C.C 4.3.20 20.4.20 48 ongoing C.R 2nd
Sand filling 21.4.20 2.5.20 12 completed C.R.3rd
Floor C.C 3.5.20 20.5.20 18 completed Bri ckwork
Marbonite 21.5.20 5.6.20 16 completed R.C.C
Ceiling P 6.6.20 15.6.20 10 ongoing Sand fil l i ng
Inner P 16.6.20 5.7.20 20 completed Fl oor C.C
Out P 6.7.20 24.7.20 19 completed Ma rboni te
Cei l i ng P
Supply and fix 25.7.20 2.8.20 9 ongoing Inner P
White wash 3.8.20 14.8.20 12 ongoing Out P
snowcem 15.8.20 20.8.20 6 completed Suppl y and fix
color wash Whi te wa s h
doors 21.8.20 31.8.20 11 completed s nowcem
col or was h doors
W.C brick jelly 1.9.20 10.9.20 10 ongoing W.C bri ck jel l y
W.C tiles 11.9.20 20.9.20 10 completed W.C til es
11.1.20 1.3.20 20.4.20 9.6.20 29.7.20 17.9.20 6.11.20

Ea rthwork
P.C.C
C.R 1st
C.R 2nd
C.R.3rd
Bri ckwork
R.C.C
Sand fil l i ng
Fl oor C.C
Ma rboni te
Cei l i ng P
Inner P
Out P
ppl y and fix
Whi te wa s h
s nowcem
was h doors
C bri ck jel l y
W.C til es