Galian = 5.45 CL Galian = 6.35
CL
= 0.34 95
Timbunan = 0.17 95
Timbunan
94
Beton = 2.04 94
93 0.54 0.23 Beton = 2.04
93 0.43
Bongkaran = 0
92 +91.69 Bongkaran = 0
1 1
92 +91.58
1 1
94.112
94.268
94.245
94.229
93.472
0.58 92.890
90.965
90.934
91.346
92.830
93.963
94.362
0.68 94.377
94.359
94.141
93.573
93.636
93.627
0.74 92.990
91.338
90.794
90.895
92.990
0.71 93.518
1.01 93.816
93.990
94.021
93.665
ELEVASI TANAH ASLI
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
1.39
1.49
JARAK (m)
4.98 2.85 3.76 2.02 1.69 7.92 7.96 1.73 4.76 2.47
1.50
JARAK (m)
DISTANCE (m) 1.97 2.93 1.66 8.70 6.75 2.25 2.05 4.71 3.98
DISTANCE (m)
WV.63
BK.1 (Bagi Sadap) WV.68
Galian = 4.01 CL Galian = 0
= 0.29 95 = 0
Timbunan Timbunan
94 94
Beton = 2.04 Beton = 0
93 0.28 0.38 93
Bongkaran = 0
92 +91.67 Bongkaran = 0
92 +91.56
1 1
1 1
94.096
94.137
93.600
0.42 93.128
91.068
90.860
90.915
92.991
93.852
94.442
0.68 94.410
94.235
93.684
93.680
93.289
93.238
91.633
91.628
0.84 93.227
93.215
90.512
90.547
0.73 93.248
93.228
91.627
91.624
0.96 93.250
93.259
93.289
93.805
93.599
93.076
ELEVASI TANAH ASLI ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
1.48
1.43
JARAK (m) JARAK (m)
2.06 3.01 3.56 1.91 7.50 8.00 1.82 1.59 4.46 3.42 3.43 2.90 4.58 4.02 2.45 3.93 2.71 3.89 4.74 2.43
DISTANCE (m) DISTANCE (m)
WV.64
WV.69
Galian = 5.76 Galian = 0
CL
91
1 1
Batu Kali = 0 91 +90.30
Batu Kali = 0 +90.61
Join Sealant
90 90 1 1
+89.41
1 1
93.088
93.155
92.991
91.771
1.06 91.288
89.442
89.409
89.148
91.211
92.528
93.463
0.69 93.658
0.41 93.668
93.580
93.141
93.566
93.717
93.738
93.683
0.97 93.343
0.09 92.622
91.293
90.851
90.852
92.537
0.79 92.891
93.851
0.87 94.006
94.049
93.627
ELEVASI TANAH ASLI ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
1.41
JARAK (m)
1.32
JARAK (m) 2.26 2.92 2.05 1.92 6.76 6.19 2.12 2.56 2.68 4.51 3.18
2.73 2.90 3.14 7.57 7.49 1.81 1.86 4.98 5.35 DISTANCE (m)
DISTANCE (m)
+90.59
1
91
Batu Kali =0 +90.26
Join Sealant
90 BETON COR INSITU K-225, 90 1 1
+89.37
1 1
14.00 t =12cm
bidang persamaan89 bidang persamaan89 Join Sealant
BETON COR INSITU K-225,
reference level 88 reference level 88
12.50 Bongkaran PAS.EKSISTING
t =12cm
t = 30cm
87.00 87.00
93.516
93.533
93.126
0.21 92.838
0.93 91.835
90.836
91.236
92.877
93.676
93.990
0.92 93.939
93.984
93.343
93.320
92.857
92.861
92.883
0.70 91.870
91.410
89.900
89.197
89.086
91.334
92.706
93.237
0.85 93.707
0.55 93.663
93.683
92.675
92.580
ELEVASI TANAH ASLI ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
1.33
1.43
1.31
JARAK (m) JARAK (m)
3.52 3.17 2.48 8.29 8.22 1.63 1.59 4.45 4.03 6.19 1.58 2.74 2.22 7.35 5.41 2.42 2.35 2.68 4.59 4.08 5.51
DISTANCE (m) DISTANCE (m)
WV.66
Galian = 7.77 WV.71
CL
Galian = 0
Timbunan = 0.22
94 Timbunan = 0.31
CL
Beton = 2.04 94
93 0.58 Beton = 1.81
Bongkaran = 0 +91.60 93
92
Bongkaran = 4.29
1 1 92
Batu Kali = 0 91 1
+90.57
1
+89.33
1 1
bidang persamaan89
reference level bidang persamaan89 Join Sealant
88 BETON COR INSITU K-225,
87.00 reference level 88 12.50 Bongkaran PAS.EKSISTING
t =12cm
t = 30cm
93.290
93.315
93.529
0.75 92.962
91.583
90.857
90.996
92.853
93.685
93.932
0.75 93.910
93.864
93.595
87.00
ELEVASI TANAH ASLI
92.633
92.588
92.516
91.482
0.33 91.303
89.325
89.145
89.327
91.353
92.339
93.246
0.85 93.545
0.50 93.555
93.505
93.290
ORIGINAL GROUND LEVEL ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
1.46
1.28
1.19
JARAK (m)
2.97 1.86 8.67 7.12 2.21 1.97 4.64 4.35
1.35
DISTANCE (m) JARAK (m)
1.60 2.70 1.73 1.81 6.55 6.54 1.76 2.04 2.64 4.67 4.36
DISTANCE (m)
Provinsi
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SUMATERA SELATAN
DIREKTORAT JENDERAL SUMBER DAYA AIR
SATUAN KERJA BALAI BESAR WILAYAH SUNGAI SUMATERA VII I Pekerjaan
JL SOEKARNO HATTA NO.869 RT.12 KELURAHAAN TALANG KELAPA KECAMATAN ALANG-ALANG LEBAR PALEMBANG
SID - DAERAH IRIGASI / RAWA KEWENANGAN PUSAT
DI BBWS SUMATERA VIII (IPDMIP)
GAMBAR
Kabupaten
POTONGAN MELINTANG SALURAN PRIMER KELINGI Lubuk Linggau & Musi Rawas
(WV.62 - WV.71) No. Lembar : 8 / 45
PT. WIDYA GRAHA ASANA KETUA TIM Ir. Sarwanta Tanggal No. Kontrak
KSO
PT.MITRA KARYA SANJAYA DIREKTUR Ir. Adi Sarwoko, Dipl. He
NO. TANGGAL YANG DIREVISI DIGAMBAR DIPERIKSA DISETUJUI
0 2 6 12 20 m 02 JANUARI 2019 01/SP/Ah-pp.IPDMIP - PUSAT/2019
DIPERIKSA DIREKSI Aldila Miralti, S.T.
SKALA H / V. 1 : 200
DISETUJUI PPK PERENCANAANeeeee
& PROGRAM Doddy Meidiansyah, S.T., M. Eng