You are on page 1of 60
[FINAL] [onicnat ] REK JOB NO. 140: Pl 14 B TEC JOB NO. BA-0153 DOCUMENT NO. : -T-301-, Data sheet for Heat Exchangers DOCUMENT TITLE: for Carbamate Condensers 1725 MTPD UREA PLANT P.T. PUPUK SRIWIDJAJA PALEMBANG - SOUTH SUMATERA INDONESIA. P.T. REKAYASA INDUSTRI JAKARTA - INDONESIA @ Toxo Evaiwerrine Corr TOKYO. JAPAN TEC JOB NO. BA.0153 (TOTAL _2_ SHEETS) 4 [go tomto| Finak sup | Hl lave 1 [os Apr #0 | For Opproval CSA) |blyal he? | oan fee] 4 ojos var'90| For Approval(>) | y¢hime| WL [ov Yr aon SESCAPTION AOE [OHECKED] "Sy PPRROTEDKEPROVED on A360” 8010) @ Toyo Encinerrtnc Corporation TOKYO. JAPAN SIGHT GLASS AND LT CONNECTION APPROX. 135. DETAIL OF @® NOZZLE ‘ft 1725 MTPO UREA PLANT LAG Toro Brgwanixa Cons] “5” LEN om noBA-0153 676 fo ne iv eee eal LP ABSORBER : PRELIMINARY beget lane 2 - EA 402 5 fe[ TT escwran | om ol ffir one [SEMENONE [OWS NO ASSED SUPPORT 2” PIPE _CWSIDE) soa bAHoLES PER 2° PIPE An ot TAIL OF LIQUID DISTRIBUTOR (Ee 77{_4725 WTPD UREA PLANT /\@ Toxo Bxomeennc Conr| Tne or 7 7} Soe ae ae Wl ea ead LP AasorsER = PRELIMINARY YC |44e fol 2 - EA 402 5 rex esonene Sore oof or wa |Kera| are [scale NONE [OWG NO. ASSIC 2x2-4® DRAIN HOLES DETAIL OF SPARGER PIPE FULL PENETRATION. 77T_ W725 MTEO__ UREA PUNT 7 LAO Toxo Exgueeninc Cours | e of nome wo BAOIS3 | /eo| LP ABSORBER SL itn Z ess 2 - EA 402 PRELIMINARY 4% ace DESCRIPTION. Own. Jomo) ae fwner vate |SCALE NONE|DWG NO.A 5S3B 1 GENERAL NOTE UNLESS OTHERWISE SPECIFIED, RATING AND FACING OF NOZZLE INCLUDING MATERIAL OF GASKET, BOLT AND NUT SHALL BE DETERMINED BY TEC'S ENGINEERING SPECIFICATION H-103 ( PIPING MATERIAL ) IN ACCORDANCE WITH PIPING SPEC SPECIFIED IN TEC'S P & I DIAGRAM. TYPE OF NOZZLE SHALL BE DETERMINED IN ACCORDANCE WITH CONTRACTOR'S ENGINEERING SPECIFICATION. SPARGER PIPE DESIGN CONDITION DESIGN PRESS. : 1.0 Kg/cm2G ( EXTERNAL ) MATERIAL, + 304 5.5 CORROSION ALLOWANCE =: 0 MM THICKNESS OF SPARGER PIPE SHALL BE DETERMINED TALKING INTO CONSIDERATION OF STRENGTH DECREASE BY OPENING OF HOLES. WELD OF SPARGER PIPE AND SHELL PLATE SHALL BE EXAMINED BY LIQUID PENETRANT METHOD. NOMINAL THICKNESS OF 2 : 1 ELLOPSOPOAL HEAD PLATE SHALL BE SAME THICKNESS AS SHELL PLATE. LOW CHLORINE CONTENT COMPRESSED ASBESTOS GASKET SHALL BE USED FOR CHANNEL FLANGE SHELL ENO ,SHELL FLANGES IN CHIMNEY, SIGHT GLASS AND @) wozze. ‘ ) 7 725 MIPD _UREA PLANT TP Toxvo sapan, nx wo. BA~O153 7 FES 0B p anit e/s4d LP ABSORBER PRELIMINARY P2m7 2 - EA 402 AQ Toxo Enoweenna Conr| "pg 45 ‘40 oS eescmncn en, fon] fe rueex frrn| oare [SCALE NONE [OWG NO A SS3E PUSRI - IB @ Toxo Enareerine Corr, roo e an PT. PUPUK SRIWIDJAJA DESIGN DATA maw 2. paso Se 2250 - 7200 Tee HH - AEM | Seances ‘SUFACE PER SHEL 1115 W Wo. OF SHES t LP ABSORBER OE Bas wiwt Os bes oO NT BUN FULL WATER] TH. OR ws OC faan xe. xs Sa WE Ta oe 0 mates DESGN ESS. 4.0 KGIoN 7.0 Ke cee NOZZLE SCHEDULE o DESA TEM, | 80 “= 70 Te | weak Tits, [Sze TRATNG|TYPEIFAGNG] —_DESIGHATION. reo. TEST PRESS. IO KaGreieaa OC Koateleiasl 2 112") [cas in” PREUMA. TEST PRESS, OER O - KGRWGlOu O Korcwa| 63 ; ya nrg. 11 DRRPIY = ORL mPa 2 AS OU nit one mapa tae o._our CORR_ALLOWANCE T wt 3.0 wu ]40 : [A fr.R_ CONN. WO. OF PASS PER SHELL | T 2 4 fa [24" H.W TRB] 2 ; c MATERIAL SPECIFICATIONS ——[2/*#| 2 (G78 fan} hit CON e = jReaOTYBESO4. | wee SeET | AleeGntsoa|96:_[_1 [3741 foram ‘SHELL FLANGE - [FLT HEAD COVER| = ExA 1 [3/4t NT - Soe A283Gr.C _ |pt HEAD FuuNce| = a a 4 Ts owe Fre | A266oR.4 | sours a wits livaeayatvan. alasae | 2 [ab] [sient ctass Trees WEISGr, TPS04 | GASKETS _kmenesen avesws| 33 [111 [Sy CONN [iii | "304 5.5 64 11 RETURN TUBE SIZE: 25,49-D x j. 6 THK x REQ'D NO.: 2001 @®—+zzso oh—_® ~ = — ray | — I @) favents Steo wg . NOZZLE SCHEDULE ( CONTINUED ) ee pl B 66) ive 1 IK issue )| 1 as ina () : TO BE DETERMINED BY CONTRACTOR Ss : fait | | a PRELIMINARY. [ex dino ii ovale —_vesoernon [We RW WS BA-OISS[owa, NO. ASSSA > ‘S, Ouens, NeCTS, we PODTTS AL TIRE TATA Goats coro peony © TR Broemtpne gotta to Ga ones Suerrence urate ENT SOND Tern Eee SAP Ses tg aa as hae eh LAE He Slane PON Ne Ro oT SD SALEY Einar G I WonTA AY Tine SOEMERSN SoMeoRD TOYO ENGINEERING CORPORATION TEAT EXCHANGER TOKYO , JAPAN SPECIFICATION SHEET 1 | CUsTORER PT PUPUK SRIWIDIAJE EV [DATE [MADE [CHKD.[ AU 2 | PLANT LOCATION — PALEMBANG, INDONESIA lo fe | 3 [soe NO. BA-O153 TTeM WO. _2-EASOL 4 [SERVICE OF UNIT some [Bone fee Vise hy Snot 5 | First Surface Condenser a 6 | WO. REQ"D WORKING 1 STAND BY o TOTAL 1 ‘1 [SIZE 2402499 - 7200 TYPE —H- AXMGPEOAL) CONNECTED IN I PARALLEL 1 SERIES | | SURPACE PER UNIT 2729 02 SHELLS PER UNIT SURFACE PER SHELL 279 a2 8 PERFORMANCE OF ONE UNIT 10 | FLUID ALLOCATION SHELL SIDE TUBE_SIDE 11 [FLUID NAME WATER VAPOR COOLING WATER 12 [RLUTD QUANTITY TOTAL kg/hr | ___26897 2350000 13, ‘VAPOR ke/ar [If 25793 OUT i487 [I oT | 4 LIQUID kg/hr 24606 i 15 ‘STEAM Kehr = 7 : 18 WATER kg/hr | 2350000 2350000 17 NON-CONDENSABLE kg/hr | 100 Tod = _ 16 | TEMPERATURE #0 [oo 60. ages EP 38 19 [DENSITY (Vap) kg7a3. [0.08 | 0.088 | 20 | DENSITY(Liq) ke/a3 Sones fans 21 [Viscosity (Vap) cP| 0.012 0.011 22 [ VIscosrtY (Liq) cP 0.65 23 | MOLBCULAR WEIGHT-VAPORS 18.2 49.0 Be 2 24 | MOLECULAR WEIGHT-NONCON. 29 28 25 | THERHAL CON. CVap) kcal /mbree [0.02 0.02 z = 26 [THERMAL CON. (Liq) kcal /mhr=C Deiat ears 27 | SPEC. HEAT(Vap) — keal/ke*C | 0.46 0.46 28 | SPEC. HEAT(Lig) kcal /kg*¢ L eae] 29 [LATENT BAT “keal/kg 30 [OPERATING PRESSURE ke/cu2d 0.94) (SBmntiga z 31 [veLociTY n/sec as s3 32 | PRESS TROP, ATTow/Cale ke/end | 0.008 qeepVeanzbcazdani) 0-5 33 [FOULING HESIST. “uzne*C/Keal 0.0001 0002 34 [HEAT EXCHANGED — 141 i keal/hr _W..0. (Corrected) 45 0 96 [TRANSFER RATE-SERVICE 72. CLEAN. Keal/mahrrc 36 CONSTRUCTION OF ONE SHELL SKETCHCBONDEE/NOZZLE ORIENTATION) 31 SHELL SIDE | TUBE SIDE 38 [DESIGN PRESSURE kg7em2d 1.75 FV [7 i 39 [TEST PRESSURE —kg/on2¢ + 40 [DESIGN TEHPERATURE “C100 0 ARK = 41 [NO.PASSHS PER SHELL cRoss | tie pial 42 | CORROSION ALLOWANCE — mal 0 elt Ht CS 43 [CONNECTIONS TW ee ae The ae 44. SIze [OUT rar 247 45 & (igor AN LONGITUDINAL. BORFLé “TBE ant et fer NELDED To SHELL Aad THE SHEETS 47 | TUbeS NO. SR4g 0.0. 25,4 am THE 1.6 NOTH 7200 “tim PITCH mm 4 30 48 [TUBE TYPE 5 HATERTAL 3048.5. 49 | SHELL 3048.5. .D. 240%7pg00 _nn_| SHELL COVER 50 [CHANNEL Cc... TUBESHEET-FLOATING 51 [ TOBESHEBT-STATIONARY (3046.5. A TMPINGEHENT BAFFLE Wo 52 [FLOATING HAD COVER = 53 | BAFFLES-CROSS § gris TYPE Hv. 45" XCUT(OTAN7AREA)_ SPACING a 54 | BAFFLE-LONG SEAL TYPE 58 | SUPPORTS-TUBE_ Sy; U-BEND TYPE SPEGAL a 56 [BYPASS SEAL ARRANGEMENT > SEALING S7RIS 57 | GASKETS-SHELL CHAN sO EAD 58 [CODE REQUIRSHENTS 7ASME Sec. M_Div.] \A TEMA CLASS 5 59 | WEIGHT-BACH SHELL keg FULD -WETH-ANTER ke BUNDLE ke | 60 [ REMARKS 1. PROVIDE OVER DESIGH ‘ON_DUTY ‘ON_FLOWS (SHELL/TUBE) 61 Dette! Attawaut® 7596 cryney BE Tard DEBED aLeUeaTiend, ~~ as MEAN METAL TEMP SECC 25% Font S78 % @ Toxo Encineeninc Corporation HEAT EXCHANGER Toxvo JAPAN SPECIFICATION SHEET cuSTOMER PE POPUK SRIWIDJAJA REV.] DATE | MADE [GAKD, AUTH | UNE WO. ‘PLANT LOGATION _PALEMBANG, INDONESIA WORK NO. BA-0153 TTEM_NO. 2-BA SOL A = G Sets Eser tFFLE DETAN oF BAFFL PETAL 2 MP BFR i it 4 ij i il 4 4 4 i 4 4 a TOYO ENGINEERING CORPORATION WERT EXCHANGER TOKYO, JAPAN | SPECIFICATION SHBET [CUSTOHER PT PUPUK SRIWIDJAJA ev Date | MADE [ CHKD al PLANT LOCATION PALBHBANG, INDONESIA ea Hae Bo langlade JOB NO. _BA-O163 TTeM NO, 2-EAGO2 zat SERVICE OF UNIT r its Ao Vins |p. cngo Vfa| ‘seconp Surface Condenser WO. REQ™D WORKING 1 STAND BY ~~ TOTAL 1 SIZE ____@50 -6000 TYPE ATL CONNECTED IW 1 PARALLEL 1 SERIES SURFACE PER UNIT 260 m2 SHELLS PER ONIT f SURFACE PER SHELL 240 m2 PERFORMANCE OF ONE UNIT FLUID_ALLOCATION SHELL SIDE TOBE_SIDE FLULD_NAHE WATER VAPOR COOLING WATER FLUID QUANTITY TOTAL kg/hr ‘S351 i 891000, VAPOR ke/ar [TN bea7 [OUT 76 Im [our LIQUID ‘kg/hr 11 STEAN ~ke/nr a = WATER ke/br 397000 39/000. NON-CONDENSABLE kg/hr | 104 04 PERATURE 2c /seeraes 38 32 DENSITY (Vap) kg/m3 | 0.14 0.22 DENSITY (Liq) ke/n3 Mpa a viscosity (Vap) cP] 0.014 | 0-011 ViscosITY (Liq) cP 0.85 MOLECULAR WEI GHT-VAPORS 18.2 wy eee =e MOLECULAR WEIGHT-NONCON. 23 29. oes THERMAL CON.(Vap) keal/ahr™O| 0.02 0.02 THERMAL CON.(Liq) keal/ahr™C 0.58 cae — ‘SPEC. HEAT(Vap) O16 | __0.48 SPRC. AEAT(Liq) kcal /kg°C. 1 LATENT HEAT kcal/kg _ | ‘OPERATING PRESSURE ke/ca2c = 9.288 (rae may] 4 VELOCITY /sec “ED PRESS. DROP, Allow/Calc ke/ca2 0.01 (6-47 e.0099 (73. 6 / (O21) A | FOULING RESIST. mzhr“C/keal 0.0004 oo HEAT EXCHANGED 3.72 WH keal/ar NT. (corrected) 44 TRANSPER RATE-SERVICE 424 ‘CLEAN kcal /aahrc CONSTRUCTION OF ONE SHELL KATCH(BUNDLE/NOZZLE ORIENTATION SHELL SIDE | TUBE SIDE_| 2, DESIGN PRESSURE ke/cm2G 1.75 FV : 1 ‘ eae ee ee TEST PRESSURE kg /cn2g Swoee 329% DESIGN TEMPERATURE — °C 170 AE H i NO. PASSES PER SHELL DvipED | shyt | CORROSION ALLOWANCE nel O ’ va CONNECTIONS TN ze" size [OUT Baz t ‘ L1G. OT) | 17e2t eating [hit a zi aaa TUBES NO. $54 0.0. 28,4 aa THK 76 om LENGTH 4000 un PITCH 32 an 4530 TUBE TYPE WATERIAL 3008.5. SHELL 3048.3. 1.0. $50___am| SHELL COVER a CHANNEL —_C.. ‘TUBESHEET-FLOATING TUBESUEET-STATIONARY €#04S. SA THPINGEHENT BAFFLE YES FLOATING HEAD COVER ii BAFFLES-CROSS 12peis TYPEnmaue seg HO}45" 3) _NCUTCDIAM/ERER) SPACING BARFLE-LONG SEAL TYPE = ‘SUPPORTS-TUBE U=BEND TYPE BYPASS SEAL ARRANGEMENT ‘GASKETS-SHELL EAE —— FLOATING AEAD CODE REQUIREMENTS ASME Sec. mm Div. 1 THA CLA WEIGHT-BACH SHELL ~———Kg-PILLED- WITH WATER kg BUNDLE kg REMARKS 1. PROVIDE OVER DESIGN ON DUTY ‘ON FLOWS (SHELL/TUBE) DESiGa ALSWAWE 35% SHACK BE GeliipbasD 07 AREA LPIA) THE SrA Cousunpnon Of 2-ETE0/ 1s WORE 20K THAN Estnanvap OES SURATE pea ani AE eee Panter ied Denia icinacal. cane eemenes seettiametnaar ea Manel Behe Gs i 2 Ss lg ir ui H ag Me AS : ! TV | —AASKERARRKRR : | VX RO RRR A. ae ue 1 LL RR Ce i. | LB eS 2 Eek 3 oe Beer ie ai | Xe as ee Toon L EER Ble x OS ae Fe 4 . . Py | x ORION PARALLERAT] SERS s[SuREACE PER UNIT 677 = SHELLS PER Ui 7 SURFACE PER SHELL = PERFORMANCE OF ONE UNIT. o/ ECU ALLOCATION SHELL SIDE aE SE 2 FLUID NAME. ABBAMAZE SoL:A ORE slupay Zoot wher 7&0. u[ FLum Quantity TOTAL adh Se, e7Ls 72.000 / #00 2 7 a vari az, 532 [OUT 70,59 Tit our 13| “LIQUID, ig/k “ee 0 OF, a4] ‘STEAM, ‘kg/hr 1 WATER a iil VET ATMENCIATEY 6 NON-CONDENSABLE t/t 2 zi i @ seer t r aay LRT HBT RTE 1 [DENSITY hee WD Le fea 19] VISCOSITY CP. 20 fa? x was 20 MOLECULAR WEIGHT-VAPORS 21 | MOLECULAR WEIGHT-NONCON. 22[ THERMAL CONDUCTIVITY tel/aar© 23) SPECIFIC HEAT ‘reall ig 24] LATENT HEAT Real! og 25| OPERATING PRESSURE igen @ aaa Toa is 2| veLocity noe 17 | PRESSURE ORO, ALLOW/CALC— bent aayaso emcee 26| FOULING RESSTANCE war ea! 2.000% dese 7 Goad 70.0003 23 HEAT EXCHANGED go7Px (08/2 ar/o¥Zpfl2e/O cal hr M.T.D.(CORRECTED) 4.9 7 2, | 10) TRANSFER RATE-SERVICE 594/70/ 7426 CLEAN eal IE, CONSTRUCTION OF ONE SHELL SRERCHGONDLE/NOGELE ORIENTATION a ‘SHELL Se | —TURESSDE | xe| DESIGN PRESURE aw? | 3S #0) 76 33] TEST PRESSURE ky en? G 21) DESIGN TEMPERATURE C| 740 TOWED 35] NO. PASSES PER SHELL i 17202 @ 25| connoston ALLOWANCE mm ote “Zan7r0 a7 CONNECTIONS | In aap Or rae W767 Bf 10 ss) SIZE & OUT_ Sgt OM oo Tee FF oe e|_aaminc _[ IvTERMEDIATE 40 TUBES NO. 1237 OD2¢ZmmT#K 2.0 mmLENGTH 6000 mm PITCH mm SHS HST S a, TUBE TYPE gee MATERIAL AL $5 42) SHELL3/6655.2° 5. 13124551, 0.1450] 900 mm | SHELL COVER. = 4a] CHANNEL —~ ad CHANNEL COVER _C.§. 0G 557 ‘4 [TUBESHEET-STATIONARY "nd 25.57 "TUBESHEET-FLOATING = TEMA CLASS TACOS | WEIGHT-EACH SHELL 3g FILLED WITH WATER, ig BUNDLE REMARKS Wit —AgiTAre! Harel — al AGITAT:R SPEC i. BLADES OVERALL JEWGT of BADE: 7500 REV. 3.2 ROM c Yclo_ peBULE! Rw DSPACE: WALL 22 WSERTED_ Biiweinl OBES 72 PREVEIT REA CRYSPAL, ZRH (ASSL TAROUG (HE CLEARSME BET WEE TIBES nT cA Ti Patel pus) ~ 1B GD NEERING Corp. EE SE ‘Toro Ency PT. PUPUK SRIWiDTATA TOKYO. JAPAN Tae Wor DESIGN DATA 2- A301 SE 3300 W x B130bx B30H TE SPECIAL ‘SERVICE ‘SURFACE PER SHELL ‘ME WO, OF SHELLS. bisietied cme OME MOUTON ema O wi acs |r We oR os ce ee ar: Ko SL HE Tae woe mst Bies FULL WATER 2 Kaew NOZZLE SCHEDULE o ‘DESIGN TEMP. 170 200 C | MARK [ones | SZE [RATING] TYPE]FACING] DESIGKATION Wrono, TEST PRESS [OBI OC Korcwolome O KeowaliAB | 2 P32, ERYSTAL UREA Inf PMEMA Test press. fos Kolcwclosse ——xarews! 17 11 | 6M MOLTEN UREA OUT| RADOGRAPHY joa ORL oe" O FUL [48a-D 4 | 6” (STEAM IN ‘PwHT [rosea Yes Dats 0 YES [694-4 [ 2" STEAM COND. OUT| CORR ALLOWANCE 1.0 WM] GS/s5:3.0/ WM} B 1] 10” VENT WO. OF PASS PER SHELL| = = 1A-D| 4 [500%] MANHOLE. sit} an zt MATERIAL SPECIFICATIONS + a fal @ x_n 300 [re ST Si FE rt no cov Tidus SARP = 2 cue Ft Heo nce owne A ours 4 WS ees $AZ09Ge, T9300 | HSRETS (s300W x 91307 morer eo [if ee 3 ? _ARITATOR e L 4 : + t + t + ont A Se @ i 1) xan aT HEAT 3 I rN T Ae Eide A + el Pee HART 6 ~[wcn a oxté|_—esoarrow er ae OLS lowe no A swe | NS SECTanG tie HEWES Oh TNENRGLE TEATnes, OST SoeenTa REET TOR a Gidweenna commis We (5 US earner ok To Uae Ted Orana FON RAY PoRreRE OTTER RAN’SEeSbiCaLLe pekaer Heb wriTnG’ BY Tor ENGINEERING. CORPORATION, 1. GENERAL NOTE UNLESS OTHERWISE SPECIFIED, RATING AND FACING OF NOZZLE INCLUDING MATERIAL OF GASKET, BOLT AND NUT SHALL BE DETERMINED BY TEC'S ENGINEERING SPECIFICATION H-103 ( PIPING MATERIAL ) IN ACCORDANCE WITH PIPING SPEC SPECIFIED IN TEC'S P & I DIAGRAM. TYPE OF NOZZLE SHALL BE DETERMINED IN ACCORDANCE WITH CONTRACTOR'S ENGINEERING SPECIFICATION. UNLESS OTHERWISE SPECIF/ED , VENDOR SHALL Foecow THE FABRICATION DRAWMGS ATTACHED FOR REFERENCE. HOT IWSULATION Go7TOM PART. SHALL BE AMPLIED FOR SIDE AUD CLEARANCE BETWEEN TUBES SHALL BE AS FolLows: Oo~ 3 mm 100% 85 96 MIN. 1~ 2 am THE Poltowiy SPACER RoDS SHALL BE w/SERTED BETWEEN TUBES Jo PREVENT UREA CRYSTAL FRoM PASSING THROUGH JHE CLEARAWLE BETWEEN TUBES WITHOUT CoMTAcTy = TUBE SURFACE . CSPEUFICATION of SPAER RoD) * Rod DIA. 1 10mm? + Rod LENGTH 1: 650 0m ° WIRE of 0.8mm% sHALL &E WoundED THE ROD wl SPIRAL PITCH 20mm, WIRE SHALL BE WELDED AS Fouows. 7 oro Zz T725MIPO__UREA PLANT ia 1B Toxo Exaveemine Cor 77 won no BA~0153 6/5 Ap] 7 Fina eq] MELTER PRELIMINARY Fel __2- €A221 re ‘escRPTOH come [SCALE NONE [DWG NO. a S#/8 450 weld Sos Zomm® Rob ae weir WIRE (0.8 mm ®) © MATERIAL Of! ROD awD WIRE 304 5S &. CLEARME BETWEEN TUBES AWD BAFFLE PLATE SHALL BE 20 mm MAK. AS SHowN w/ (A) (8) Avo (ce) BELOW. AT SITE, 2% AFTER HEATING = 7UBES BY STERM VEMDOR ro MELTER SHALL = CHECK Je ACTUAL CLEARAME = BETWEEN 7UBES AVD BAFFLE PLATE DES*RIBED 1 ABOVE -4/0TE 6. THE PART WHERE J¥E CLEARMVCE EXCEEDS 2.0 mm SHALL BE REPAIRED BY weLD/y FATIH PLATE 7o KEEP 7WE CLEARMME LESS IWAN 2.0mm, OR WELOWG WIRE MESH 70 PREVENT UREA CRISTAL FRoM § PASSIS9 = JHRW6H THE CONTACT Ig TUBE SURFACE. CLEARAWCE WITHOUT 77 TS MTPO_UREA PLANT 4 = @ Toro Exaiwerana Co TAT nom no BKOISS Valea val e/a MELTER PRELIMINARY Nye hod 2-EA301 3 re [DESCRIPTION ‘own, Jomo] Ae jarpr| oate |SCALENONE|DWG NO.A S#/e A), SFLE PLATE VIEW "Xx" Tf 7725 HTPD UREA PAT. 4 /\@ Toxo Enorwesnie Cone] py uf wom no BA- 0/53 75.) ELT po} dat ee ( fe ae A 2E LIMIWARY Gt VNaw|t bog, 6 rex. DESCRIPTION ‘own, jowol/ae [oHier MiR|APPR.| DATE |SCALE Wowie |DWG NO. A SHD (B) DEyAlL “¥” ‘ 77 2725 MIPD UREA PeAdT /1@ Toxo Excweesic Conr| 5 ~ Cons. BA=9/5 #50 Hf ras MELTER P| Finan. ; woe 2-EA3o1 PRE LIMINAR cr ‘esonrnon ost [A gawe [ONG WO A S47 E tO 7? 25 MILD UREA PLANT /?\@ Toro Exomegaine Conr| 5 ia reed eres S540 aa HELTE Fintan I6 se] 2-EA301 Z PA] PRELIM WARY Nsw] Te 6 SS ston frre] ore [SEALE plow [OWG NGA S47 F @ Toxo Encineenive Corporation TOKYO JAPAN HEAT EXCHANGER SPECIFICATION SHEET cusTOMER PY PUPUK SRIWIDJAIA DATE | MADE [GHKD, [AUTH] UNE_NO- PLANT LOGATION PALEMBANG, INDONESIA lo [953 | oe ie} — BAFFLE SPACING AT RATING STAGE WORK NO. BA-Gi53 TTeM_NO.__2-HAIZ1 80 Lozuraicagss | 80 | \ume. Barree | k 303.2 : q aw ee : Fe | 4 TOTAL TUBE NO 36 (@ 25 (MOLECULAR Wei cuT-varoRs TOYO ENGINEERING CORPORATION HEAT EXCHANGER 7 TOKYO , JAPAN = SPECIFICATION SHEET (CUSTOMER PT. SRINTDIATA” DATE [WADE [CHRD [AU PLANT LOCATION PALEMBANG, INDONESIA. 2 le gheens SOT. ER OTE TRING, —P-BRLZT ( SERVICE OF UNIT 1 2 3 4 : It lands (to) Bm y siano 5 |" Sealing Water Cooler 8 1 8 WO. REQ"D WORKING 1 STAND BY 0 TOTAL 1 SIZE_¥9) “303.2 - 5000___ TYEE —H-ABH CONE SURFACE PER UNIT 14.2 m2 SHBLLS PER UNIT 1 8 PERFORMANCE OF ONE UNIT 10 [FLUID ALcOCAT TOW SHELL SIDE TUBE_SIDE 11 CRLOTD WANE. STEAM CONDENSATE ATER ig [FLUID QUANTITY TOTAL ke7hr 18500_** VAPOR it ogra mm our. LIQUID ka/nr | 1500 7* 1ss00 Fe Toooo**| T0000 | ‘STRAM —_ke/br WATER kg/hr NON-CONDENSABLE kg/hr TATURE. SCieunagnt TY (Vap) —_ke/a3 = aaah 20 [DENSITY (Lia) kg/n3 | 989.7 330-8 393.5 Ed 21 [Viscosity (Vap) cP 22 [Viscosity (Liq) CP | .63 oem | 0-974 oon ED IN 7 PARALLEL 7 SERIES SURFACE PER SHELL 79-2 m2 39.3 FF Eu aT 24 [MOLECULAR WEIGHT-NONCOW. 25 [THERMAL CON. (Vap) kcal/mir° zi 26 [THERMAL CON.(Lia) keal/mhr'C| 0.544 o543 o-540 EGR 27 SPEC. HEAT(Vap) koal/ke™C 28 [-SPEC. HEAT(Liq) keal/kg"C [| 0.998 e998 | 1. 66% 0-905 29 [UATENT HBAT kcal/kg, 30 [OPERATING PRESSURE ke/cn26 U5, I a 31 [VeLocrry n/sec 130 32 | PRESS. DROP, Allow/Cale kg/en2 | 0.5 TO.19- 5 33 [FOULING RESIST, aghr=C/keal 0. 34 (HEAT EXCHANGED 0.05 “*€ WH Keal/hr W.T.D. (Corrected) 5-6’ a 35 [TRANSPER RATE-SERVICE 613 CLEAN kealJaahr*C 36 CONSTRUCTION OF ONE SHELL SKETOH(BUNDLE/NOZZLE ORIENTATION 37 SHELL SIDE | TUBE SIDE 38 | DESIGN PRESSURE kg/ea2g 4 ¥* 7 4 1 39 [TEST PRESSURE ke/enz Te Ly 40 [DESIGN TEMPERATURE *c 70 6 41 (NO. PASSES PER SHRLL ONE SI 42 [CORROSION ALLOWANCE om 3 '43 [CONNECTIONS TW 3 44," size [OUT 3 45 & CI. OUTY a 46 {rating [INT amt ca 47 [TUBES NO. 36 _O.D.ay¢ am THK 26 om LENGTH Sooo mm PITCH 92mm o-42 002 48 [TUBE TYPE WATERTAL C3. 49 [SHELL os To" 305-2 _am| SHELL COVER 50 [CHANNEL C.S. A TUBESHERT-FLOATING 51 | TUBESHEET-STATIONARY (C,S,) TMPINGEMRNT BAFFLE (fes) WO 52 [FLOATING HEAD COVER 53 [ BAFFLES-CROSS 22 BFCSTYPE Seq (H)V.46° 26.4 SCUT(QIAD/AREA) SPACING 2 am 54 | BAFFLE-LONG SEAL TYPE 55 [ SUPPORTS-TUBE T-BEND TYPE 56 [BYPASS SEAL ARRANGEMENT 57 [CASKETS-SHETL CHANNEL, FLOATING HEAD 58 [CODE REQUIREHENTS “ASME cee. VIF Pv. @ TEMA CLASS B 59 [WEIGHT-EACH SHELL ——~keg- FILLED-W1TH-WATER ke BUNDLE K 60 [REHARKS 1. PROVIDE OVER DESIGN I ON DUTY 1 T ON_FLOWS (SHELL/TUBE) 61 2 FIEAN METAL TEMPERATURE Siete 407 °c ruse 37-5". 62 eiUse Pipe SHELL 12" SCHEDULE 40 5 URIEE: TEC'S APPROVAL. 5 87 53 @ Toyo Encmesrine Conroration HEAT EXCHANGER TORY JAPAN SPECIFICATION SHEET CUSTOMER Pl. PUPUK Spin DIAD EW] ATE | wADE [OOO [AUTH] UNE_NO. PLANT LOCATION PALEMRAVE, _jWDonlES/+ Pa eB | WORK NO. 22° ZaeSS Tem NO. 2- ZA 7h I Peel he aber vou SERVICE OF UNIT 7HiRD STAGE iTERCOULEA = GBt0! NO. REQ’D WORKING — / STANDBY TOTAL l SE Tyee _F1=DEU. CONNECTED IN” PARALLEL SERIES SURFACE PER UNIT (74)** _w SHELLS PER UNIT {SURFACE PER SHELL a PERFORMANCE OF ONE UNIT FLUID ALLOCATION SHELLS. TUBE SE FLUID NAME Wade 226A, FLUID QUANTITY TOTAL igh (eh ooo lx CIE Tha, 280 RC. )FE VAPOR eri Our. Ba 26OPP IP OUT. SHTML LigiD. ‘ath Feu) STEAM igh WATER EMCI AIT ETDS NON-CONDENSABLE —/t TEMPERATURE z 27a)" rer DENSITY iat ia ‘iscostTY => 1 MOLECULAR WEIGHT-VAPORS | = ale MOLECULAR WEIGHT-NONCON. i a THERMAL CONDUCTIITY healt = SPECIFIC HEAT Teal) LATENT- HEAT Teli OPERATING PRESSURE —_tx/en'o 2 c VELOCITY, ah PRESSURE DROP, ALLOW/CACG_t/en™ oma a FOULING RESISTANCE bon? Cyhea 2ape2 oF HEAT EXCHANGED 72.48) ¥lx_(.{ ) 21H teal/h M.D, (CORRECTED)— Taye TRANSFER RATE-SERVICE (#40) * CLEAN, KeallePC) CONSTRUCTION OF ONE SHELL | SkETCHIBUNDEE/NOZALE ORIENTATION SHELL Se [TUBE SDE DESIGN PRESSURE _Fav/en? DO. HO Y* « TEST PRESSURE ta/en? G DESIGN TEMPERATURE, 7 2 12d FF NO. PASSES PER SHELL” L 2 {CORROSION-ALLOWANCE a 35 3 ‘CONNECTIONS [1 * #2 SIZE & | OUT. : be ¥ garinc | INTERMEDIATE i TUBES NO. 0.0 25.4-mm THK 2.0 mm LENGTH 000 mmPITCH 32 mm @ A HE DO TUBE TYPE Tse MATERIAL excretnpa enema SHELL i "aa [SHELL COVER ae CHANNEL ——ip45.5 myc. r 0455 Defy. | CHANNEL COVER 35455 ap c.g ped 8 OER. ‘TUBESHEET-STATIONARY2,¢ + gng5.5 pEPo | TUBESHEET FLOATING a FLOATING HEAD COVER. IMPINGEMENT BAFFLE YES _NO BAFFLES-CROSS THRE HV 96CUNDIAM/AREA] SPACING me SAFFLE-LONG SEAL TYPE z SUPPORTS-TUBE U-BEND a TE, BYPASS SEAL ARRANGEMENT as Soa GASKETS SHELL cA FLOATING EAD (CODE REQUIREMENTS, SME See. TE piv. 1) a TEMA CLASS (RC)A WEIGHT-EACH SHELL. FIELED Wit WATER ‘ig BUNDLE z FEMARS 1) at E FWALIZED BASED ol 2- vi EDR MATION G 2. FLUALI2E! Et Z on rt: GRO t a | 2a if EMDR Ors Sia (0), 3B TAAL MAX. OPERAT Al —PEHPEPAT IRE al (4) s¢ 7 WALIZED AT DETAN =19"'G S7AQE @ Toyo Enaereine Conrorarion TOKYO JAPAN HEAT EXCHANGER SPECIFICATION SHEET PT. PUPUK SRIVADTATA ev. aut ‘CUSTOMER LEM BANG, NDOMESIA MADE [SRKO, aa PLANT LOCATION eae? ITEM _NO. uz Hi WORK NO. oe SERVICE OF UNT SZzav Sia wZeRcoae® Eo, ot NO. REQ’D WORKING 7 STANDBY TOTAL, L SIE Tyre A BEU, “CONNECTED _IN PARALLEL SERIES SURFACE PER UNIT (26I)** w SHELIS PER UNIT 1 SURFACE, PERS ELL. = PERFORMANCE OF ONE ‘UNIT FLUID ALLOCATION SHELL_ SIDE TUBE SDE ELUID-NAME. FLUID QUANTIFY TOTAL ‘E00L/Me WATE: Fr ao Guay, fran | ‘VAPOR, our. [USA dl) OUT GOEO)PHD ‘LiguiD (210) ‘STEAM WATER Ir3i1000 x C.F (311,000 x Ch 54 55 6 si 53 NON-CONDENSABLE. TEMPERATURE 32 3 C20 40. DENSITY, ‘VIscosiTy — MOLECULAR WEIGHT-VAPORS MOLECULAR WEIGHT-NONCON, ‘THERMAL CONDUCTIVITY — beal/i-m=0) SPECIFIC HEAT teal/BeO) LATENT HEAT. Beale ‘OPERATING PRESSURE __lef/ow"G 42 VELOCITY w/e PRESSURE DROP, ALLOW/CALC. fallen? a5, FOULING RESISTANCE hom “C/heal 20002. HEAT EXCHANGED (2.78)*1x (1.1)*2 _MM heal T_D.(CORRECTED. 4g) ‘TRANSFER RATE-SERVICE (236) CLEAN Reallien 0 ‘CONSTRUCTION OF ONE SHELL. SKETCHIBUNDLE/NOZ2LE ORIENTATION) SHELL SDE | TUBE SIDE DESIGN PRESSURE ew 22 (20) ‘TEST PRESSURE Tallew® 6. ¥ a DESIGN TEMPERATURE, C a 2 NO. PASSES PER SHELL. ‘CORROSION ALLOWANCE mm 2. ‘CONNECTIONS [1 oO” swe & [our ie RATING [INTERMEDIATE 0 a TUBES NO. 0.0254 mmTWK 2.0 mm LENT P00 an PiCH 32 am @ TUBE TYPE. U= Tue, MATERIAL 304 3 SHELL S$ 0. SHELL COVER, (CHANNEL, cs 7 3045.5 CAD ‘CHANNEL COVER ‘TUBESHEET-STATIONARY c.s + 304.5 CAD | TUBESHEET: oATING FLOATING HEAD COVER IMPINGEMENT. “BAFFLE __VES_NO BAFFLES.CROSS, TPS HV {3% CUNDIAW/AREAY SPACING at BAFFLE-LONG SEAL TYPE ‘SUPPORTS. TUBE, U-BEND, are. ‘BYPASS SEAL ARRANGEMENT ~ (GASKETS-SHELL CHANNEL FLOATING HEAD (CODE REQUIREMENTS ASME Sec Di TDA TEMA GLASS —fRB)Ca WEIGHT-EACH SHELL. “ig — FUCEED-WITH WATER, ‘ke BUNDLE, is REMARKS. a Wat EWALIZED BASED: (Ali 2 AE FINALIZED pASF! 2 2298101 fF a Z Glo] yEWDoR Gy To Ei g. TEMPERATIRE. a) x4. EF AAALIPED AT DETAN vag i eae @ Toyo Encmeenine Corporation HEAT EXCHANGER TOKYO JAPAN SPECIFICATION SHEET 1 [CUSTOMER PT. PUPUK SRIWIDTATA REV.] DATE [ MADE] GAKD,[AUTAL] UNE NO. 2[ PLANT LOCATION PalEMpAde, INDONESIA Cmirisd Ze 3[ WORK NOE 7Ta3ge TEM NO. >-Zar#1 wa oe «| SERVICE OF UNT_ Figs] S7AGE w/HRCOLER FOR 2-GB 701 s| s| NO. REG'D WORKING 7 STANDBY Tora 7 [Sze TWEE A=BEU. CONNECTED IN ——PARALLE | SURFACE PER UNIT (37p)"" = SHELIS PER UNF? {SURFACE PER SHELL fe PERFORMANCE OF ONE UNIT. o) FLUID ALLOCATION SHELL FUSE SE 10 FLUID NAME. Lae 7 [FLUID QUANTITY TOTAL 73 C2éLoooy {50.RONE! x (LIFE x VAPOR | our. TSO" | OUT Leo ao 13) ‘LIQUID ali C66 i STEAM a Fy WATER i/o) a cao oe CT 1s|_—-Non.cONDENSABLE — te 1? TEMPERATURE “C 32 Er ZOrt 40 1a[oENsiry : 19] viscosrry ee 2o| MOLECULAR WEIGHTE-VAPORS | z 21 | MOLECULAR WEIGHT-NONCON. : 22 THERMAL CONDUCTIY — teall-nO) cal zo [Seeciric HEAT. ue Latent HEAT 25] OPERATING PRESSURE Kallen 4.0 4. bE 2s[-veocrry we 27 PRESSURE DROP, ALLOW ICATE aon? 7 aL 28[ FOULING RESISTANCE ha “C/ea Fo002 2.0007 29[ HEAT EXCHANGED —(/-83)90 x n1)?2 WA keal/h M, T-D.(CORRECTED) Saisie yee 90] TRANSFER RATE-SERVICE_ £760) CLEAN ‘keal/th-m?"C)| ‘CONSTRUCTION Of ONE SHELL TRETCIRINDEE/ NOZZLE ORIENTATION a SHELL SE | TUBE Sib 22[ DESIGN PRESSURE leew? —7.0 2.07 } so [TEST PRESSURE ——lw/en’ 34] DESIGN TEMPERATURE “| C21 nat 3s[ NO, PASSES PER SHELL Z 2 come auceeneg esa comet gee a (cer rea) 31| CONNECTIONS [ IN” “al 16? SKE & |Our OF 147 ney: RATING _ [INTERMEDIATE 5 = TUBES NO. 0.0 26.dénnTHK 20 amCENGTH $000 mn PITCH 32 ma 40a OG DOS “Tuee Tyre t= Tue MATERIAL ots. — SHELL é ie am [SHELL COVER — CHANNEL 3045.5 —*" caine cov ——— "TUBESHEET. STATIONARY CS y_30€5.8 (AD _| TUBESHEET FLOATING FLOATING HEAD COVER IMPINGEMENT BAFFLE YES NO 82 52 | REMARKS = st a BE ZWALIPED BASED 0M] _2-%BJ01 VENDOR inFORMATION. al ssf «2. ALIZED BASE! Aj [DITION oF 2-92 10: 2 56 wenlDot ae si Gea 70 B= HigHee Ml Thal Ha, OPERATITG TEMPERATURE. sel Gg) es ED AT _DETAL fu" z — BAFFLES-CROSS. TPE HV. 36 CUNDIAM/AREAY SPACING a BAFFLE-LONC SEAL TYPE ‘SUPPORTS-TUBE U-BEND, BYPASS SEAL ARRANGEMENT a GASKETS.SHELL. ‘SHANNEL = FLOATING HEAD. CODE. REQUIREMENTS. TE See WL Div. TEMA CLASS CAM) Co & WHOTEEAGH Suen HT WATER ‘pause =| @ Toyo Excmecemwe Corroration HEAT EXCHANGER TOKYO. JAPAN SPECIFICATION SHEET ‘CUSTOMER. PE POPOK SRINIDJATA REV OATE| wade CHRO TAIT] UNE vo. PLANT LOCATION PALEMBANG, INDONESIA © hob A [Erne DM, WORK NO. BA-0153 ITEM_NO.__2-BA 105 [ame | = ae | 44a} LBARFLE SPACING AT RATING STAGE IME barre 189.9 TOTAL Tube No 51% ‘TOYO ENGINEERING CORPORATION WEAT EXCHANGER ‘TOKYO, JAPAN CUSTOHER PT PUPUK SRIWIDJAJA BV| DATE [MADE [ CHKD.[ AU: PLANT LOCATION PALBMBANG, INDONESIA 4 [belo JOB WO. BA-O15S TTEH NO. _ 2-BAT05 SERVice OF UNIT 1 biwlac ae piecing Annona Bypass Cooler NO. REQ'D WORKING 1 STAND BY O TOTAL 1 SIZE 450 - 6000 TYPE —_H-BRU CONNECTED IW TJ PARALLELS Cy SERIES SURFACE PER UNIT 42% m2 SHELLS PERONIT 1 SURPACE PER SHELL a9. ¢ 2 PERFORMANCE OF ONE UNIT FLOTD_ALLOCATION SHELL SIDE TUBE SIDE FLUID_NAME COOLING WATER TUMONTA FLUID QUANTITY TOTAL kg/hr |___83333_ x10 ‘VAPOR ‘kg/hr {TN jour LIQUID, kg/hr STEAM ke/br WATER. kg/hr |__ 63833 83333 NON-CONDENSABLE kg/hr TEMPERATURE tear 35 a3 37 DENSITY (Vap) ke/n3 [bensrry (Liq) ke/n3 VISCOSITY (Vap) cP Viscosity (Lia) cP MOLECULAR WEIGHT-VAPORS MOLECULAR WEIGHT-NONCON. ‘THERMAL CON. (Yap) keal/alr=C THERMAL CON. (Liq) keal/anr®C 7.38 THe SPEC. HEAT(Vap) kcal/kg" C SPRC. HEAT(Liq) kcal /kg°C LATENT HEAT koal /kg OPERATING PRESSURE kg/cm26 a = [wLocTtY — afsee | [ PRESS. DROP,Allow/Cale kg/ca2| 0.6 ods o5 oo FOULING RESIST. a2hr*C/keal 9.0002 0.0002 HEAT EXCHANGED 0.25 Na keal/nr W,T.D. (Corrected 555 °c TRANSFER RATE-SERVICE 905, CLEAN kcal /mahr™C. (CONSTAUCT LON OF UNG SHELL [SKETCHCBUNDLE/NOZELE ORIENTATION SHELL $1De | TUBE SIDE DESIGN PRESSURE kg7omeq 7 307 t t TEST PRESSURE ke/em2q_ a DESIGN TEMPERATURE °C 70 ED NO.PASSES PER SHELL ONE TWO a CORROSION ALLOWANCE wal 3 3 CONNECTIONS IW a7 I aay size [our [6 + at tt & (Lig. our eating [INT TUBES NO. 574 0.0, 25-4nm THK 2 TUBE TYPE" -Tuew) A HATERIAL __C.3. SHELL 3. 1.0, 450 SHELL COVER CHANNEL C.S. = ‘TUBESHEET-FLOATING ‘TUBESHEBT-STATIONARY _(@-S-) A | (MPINGRNENT BAFFLE (TES) - NO i FLOATING HEAD COVER ~~ BAFFLES-CROSS 22 SFLSTYPE SEG (MYV.45°264 SCUTW@TAMVAREA) SPACING 258 am BAFFLE-LONG SEAL TYPE 0708 x TRNGTH ceeot am PITCH 32 nm -<- 30 SUPPORTS-TUBE U=BEND TYPE BYPASS SEAL ARRANGEMENT ai (GASKETS-SHELL CHANNEL — FLOATING HEAD CODE REQUIREMENTS ASHE Sec. YM Div. 1> @ TEMA CLASS B WEIGHT-BACH SHELL Kg FIGLBD WITH WATER kg BUNDLE Kg REMARKS 1.PROVIDE OVER DESIGN 1: ON DUTY 1. 71.® ~ ON FLOWS (SHBLL/TUBE) poe 2 7 ( Condakion - 1) CondiSin af turbine Remabhs. 2-97 101 comp. normal extraclemn steam : 107 2-9 T102 pump pormod, 2-97 103 perme normed Clondatoan 2) Condi Turbine, Remarks 2-@TH01 comp. yakad extyactuin steam +7701 2-972 pump raked 297103 pump rated (2) i7e-2 Cireukating wiley quantity skodk be finakiyed based on the © duty Carbine candenser based on above shIE~1. Q) NomE-3 Fitlings and accessories sholk be requested to rhe vendir af Yarbine condenser — according ty tle Tee~s per dagrome ( Pw. No. E- ursc ). 7 londstion —3 Condition of turbine Remark. Ziel Comp. normal Extraction Steam + 27% 2-GT102 Stop 2-GT103 step page 6 of 7 FL Noles C1) No7e-1 ) Normeh steam flow rake and porns duly chakh be firokized acconling the vendor informakion ef 2-GB101, 2-4THl, 2- GAI2IA.B , 2-G7102A:8 , 2-GA102A-8 and 2-4T103A,B bY Design seam flour vate and design day shall be decided considering whe por lleh “running” of 2-GA0lAB or 2-GA/02A;8 for switching over pumps . Design condition for turbine condenser is summarized as Follows. condikion of turbine emark s. 2-4T 101 + comp. normal extracKion Ham : 320/ Tie 2-4T102, > pump normall promt | 247103 > pump normal 40) Running Ne. of ly pumps. case-1 3 Two pumps of 2 GAI0IA/B and one pump 7 2-GAO2AB Gse-2 One punp of 2-GA/01A/B ard tise pump of 2- GAZA The case which requires move steam flaws rate shall be selected . Design steam flour rote and design dus based on wt above design condition for turbine condenser shekl be finalized according “es she vender ‘aformalion. (ey Design steam flow pate and design duty based on le above design condilin shal cover kt odebowing condbilaans. Page 4 of 7 (6) Materials (a) Suction chambers:, ee (b) Diffusers:_——____¢.S (©) Steam nortles:____—2e4..$ (a) "Steam chests (nozzle heads) +28 (is (f) Water chambers: GS (g) Tube sheets;______204.,$ (h) Tubes. (1) Fittings and Accessories included (a) Air leakage meter e 3045.5 (b) Other:2} 2 (8) Approximate weight, each ejector unit: kg (8) Preliminary drawing (s) = —__—Requited __________— (10) Descriptive bulletin(s) (or specifications) :__Reguuived —___________ cc. Hogging Bjectors (1) Manufacturer (a) Name: (b) Location: (2) G]tzam) (Aix) (Water) Operated. Number per condenser:2mé— Sizei————— (3) Operating Conditions and Performance : ( )* 7o be Finalized by vendor (a) Capacity:__¢/02)* kg/hr dry air a2 po te abs Suction Pressure ee (b) Steam consumption:. key/ar at DQZYx5yeq2 233820 (e) Maximum design steam conditions ny/en X38). 0c (@) Air consumpt (e) Water consumption: = kg/hr at keg/en?g (4) Approximate weight, each: —————__—_____________k (5) Preliminary drawing (s)= a = (6) Fittings and accessories included: ! Wore-3) (1 Descriptive bulletin(s) (or specifications) eee D. Data for Instruments and Accessories Opercticy pressre > Main condenser Nor.__melly , Hox._ Khon Inkir condenser Nor. __ nary, Hex, kha After Condenser Nor. Pig, Hx (2) Condensate Aavel ia main condenser dat wil Crom outlet 1 Mex. rom ( ms), Nov. am (mt), Min Page 3 of 7 (b) Steam space only filled with water: kg (18) Preliminary drawing(s):——Regucred =e (14) Descriptive bulletin(s) (or specifications) = —Reguasted, B. Steam Jet Air Ejector(s) (1) Manufacturer (a) Name:. (@) leaden eee = (2) Total number of Ejector Units: aes Tt Ws nad (3) Size and type:___ No. of elements:__JW0__No. of stages:__Two __ mounted on }__=————>—————————> surface inter- and after-condensers, (4) Operating Conditions and Performance {a) Design capacity — 100 per cont — Suction pressure: mm Hg abs Suction temperature: tc Dry air leakage:________m /nzeorresponding to:_________kg per hr Non-condensible gases other than air leakage:Mane _(__). kg per br (—_) xg per hr (—) xs per he Associated saturated water vapor: xg per hr ‘Total gas-vapor mixture; kg per he Design capacity each element:_________/0@___per cent Number of alaments operating for 100% capacity: one. Curve(s) of approximate capacity vs, suétion pressure:_——_Reguired (b) Steam conditions — os oaapoentaclel eo Minimum operating pressure (at nozzies) :22/ jeg /em2jTotal temp:__233__ (©) Steam Consumption (100 per cent design capacity): per hr (8) Condenser Data (a) Surface 9@ 2 O) _______200_,___per cent design capacity (e) OD:__1:24 ma BWE:_____Lengtin (effective-overall) (@) Method of fastening tub és m Hig (e) Cooling Water (condensate) (raw water) : ele, big fn*4) Minimum flow required at:___200__per cent design eapacity:_____kg/nr Maximum design flow: gr Friction loss at maximum design flow: ___Less_wlan 5 _m of water (£) Water boxes — Maximum design pressure: ge res Pp ae watiy “CCondensake) Temperalure’i Inlet__47 °c outlet Inter-condenser________-After-condenser (R) Heat! tranqfr rate - service keal/m Hee: Ink. Aff. CY MT.D Ccopneched) °c Infor, After QI Size (Shek ID x Jube feng hd mm + Tahir. Afor. Tote (k) Condencoke guonite Cv 2 Inti Aft 2of 7 (0) Meter (Cores): oe See (6) Divided of now-diviged: Divided (a) Design pressure:__2.__xgyem2g Test pressure: —_____-kg/em2g Tnlet nozzles Number and size — fe eee ec Outlet mocaans wre (1) Shell (a) Material: _____¢.S._ (b) Thickness:____Number of sections:__@ae___ (©) Method of connecting sections; N/A (@) Provision for tube expansion: (e) Number and size of venting connections: 672 > (8) Hotwell (a) Type:_Bathtuh ——capacity:_Ziva_minules yelen Goa 3 (b) Material:. <.S. (c) Thickness;_____Number of sections:_____Qae ____ (9) Tube sheets (a) Number and size:_Dia :_____Thickness: —— (b) Material: 3065.5 or ¢.S + 2e¢ s,s cle (10) Tube support plates (a) Number:. (b) Materi ‘Thickness: 2S (11) Steam inlet neck and exhaust connection (a) Material;——__¢: $e (b) Thickness: Number of sections: _dne_______ (©) Connection to shett — (Hanged) oF To turbine — (Ranges) oF (a) Height —top of water box flange to turbine exhaust including expansion joint (if any): (e} Provision for vertical expansion (condenser hung) (spring supports) (expansion joint). (8) Spring supports (if used). Type: ——________— (g) Expansion joint (if used). Type: — eS Material: Height: ‘(anged) or Ends — (welded) : SSeS (12) Approximate weights, condenser with tubes (a) Dry: keg In service:. kg DATA SHEET NO. Page 1 of 7 @ Toyo Encmwerrine Corporation | steam surrace CONDENSER TOKYO | JAPAN DATA SHEET GUSTONER PUPUK SRIWIDIATA REV] OxTE wade [OMD.| AUTH] UNE NO. PLANT _LOGATION THDONES be | Je 108_NO. ye ITEM NO 2 EA/od. SERVICE OF UNIT URBWE cope SER it at 1 NO. REQ'D WORKING _/ STANOBY TOTAL / tot A. Condenser (1) Manufacturer (a) Name: (b) Location (2) Condenser surface (total/effective) ; 4 (3) Number of water pasees:__One (4) Design basis — operating conditions and performance apensrote, PRESS. (a) Nature and source of circulating water: bn fea (b) Duty (net heat rejected tg clvulating water): > ag we keel) Gee Steam Flow = AU ERE ott Mik) per he (c) Cireulating water quantity: AleMAL 1746 x10? , DESIGA (960x109? (WeTE2) kore (a) Circulating water inlet temperature: 32 __,qufle& #2____ec (e) Cleanliness factor: _____ 85 __ (£) Average circulating water velocity in tubes: (g) Absolute pressure (to be measured at point specified in the Heat Exchange Institute Standards) : 80 om tg (a) Deseration — maximum free oxygen in condensate (42) (14) (7) — (Indicate) : ppb es (®) Circulating water friction loss through clean tubes and water boxes: WAX {12° (J) Supplementary (expected) performance on curve sheets: Repaired — (6) Tubes (a) Main Condensing Sections: Pith, C24) mm (1) No: Size:__/22 pr OD Gauge: 28 Tain’ Bae (2) Length, effective: overat:___( 6.0) a (Gy Maral Oo ede gee (b) Gas Removal Sections: Pitch 6 24) (1) No; ___Size:_22 nm OD Gauge: 2747 pie (2) Length, effective: —____. Overall: —__( 6.0) (8) Material: __3045-5__. (c) Impingement Sections: 7 Inpngemert PRD pegh, C2 22a, (1) No: Size:_"/9.0 peOD Gauge: L224. at (2) Length, eftectiv Overall: “ a (3) Material: —__204 $.$___ {€) Method of connection — Tet ends — ae b 2 Outlet end: envy Sxpnnsien by Badling (e) Furnished by: ——____Mapuetattie yee (£) Installed by: —__Maauyvacfuwer (6) Water boxes — Covers (if required) (a) Material box): pe Se “Taae Prreh avo TURE HESS. “SLL BS AWACTSED BF VENDOR « m/sec @ Toyo Encivessinc Corporation HEAT EXCHANGER TOKYO _JAPAN CUSTOMER PE PUPUK SRIWIDJATA PLANT LOCATION PALEMBANG, INDONESIA WORK NO. _BA-O153, TEM NO, 2-BA 103 L ss | e290 = 21s cosa), soe | BAFFLE SPAGING AT RATING STAGE ON WHOLE SURFACE oF FRATE | TOTAL TUBE NO 395 TOYO ENGINEERING CORPORATION WERT EXCHANGER TOKYO , JAPAN SPECIFICATION SHEET 0 PT POPUK SRIWIDIAIE EV[ DATE | vaDe [ cHKD[ AU PLANT LOCATION PALEMBANG, INDONESIA (0 (p80 fo | Phim oe 08 NO. BA-OI5S. Trg WO. a-BATOS) “UL SERVICE OF-UNTT oe [-Amuonia Prekeater i FP Ve Lma ty (WO. REQ") WORKING 1 STAND BYS T SIZE__550 - 7200 TYEE _V-SPECTAL CONNECTED [U1 PARALLEL 1 SERIES SURFACE P#R UNIT 138 m2 SHELLS PER UNIT 1 SURFACE PER SHELL 138 2 PERFORMANCE OF ONE_UNIT FLUID_ALLOCATTON SHELL SIDE TUBE SIDE FLUID_WAMB WOT WATER ‘ANMONTA ia) [FLUTO~QUANTITY TOTAL ke/he 173000 40708 VAPOR ke/he {TW our i our Liquid — ke/hr ae TOTO TOTOR STEAM ke/hr a al | WATER kg/nr [173000 173000. NON-CONDENSABLE kg/hr TEHPORATURE 2c: eas Set 028 eS aici DENSITY (Wap) Ka7as DENSITY (Lig), ke/a3 [968 o74 az Siz, viscosity (Vap) ce Sse | a VIscosrtY_ (Liq) ce] ox: T3 orzi o15 MOLECULAR _W8IGRT-VAPORS HOLECULAR W81GHT-NONCON [THERMAL CON. (Vap) kcal/ahr*C [THERMAL CON. (Liq) keal/mhr°C [AG 0.562 encase ete 0.31 SPEC. HEAT(Vap) kcal/kg SPEC. HEAT(Lia) keal/kg*C | __1 I LATENT HEAT keal/kg. OPERATING PRESSURE kg/en26 z Ts VELOCITY a/sec PRESS. DROP, Allow/Cale kg/cm? O. oo 48 5 70:07 __ FOULING RESIST, azhr*C/kcal 0.0002 0: 0062 HEAT BXCHANGED 1.6 iKeal/hr__W.T.0. (Corrected) 205. a TRANSFER RATE-SERVICE 539 CLEAN keal/aahr~c CONSTRUCTION OF ONE SHELE [SKETCH(BUNDLR/NOZZLE ORIENTATION [-SHECL Sipe | TUBE S1DE DESIGN PRESSURE ka/en2a4 Ted AN TEST PRESSURE _kg/em2q z DESIGN TEMPERATURE °C 120 Tie NO. PASSES PER SHELL ONE ONE CORROSTON ALLOWANCE oa 3 3 CONNECTIONS IW 3 size [OUT 8 4 & CLIG._OUTY J raving [TNT = t TUaEs NO. 395 0.0. 7g) am THK 9.2 um LENGTH 7206 om PITCH 2¢ mm —30 Jo t TUBE TYPE MATERIAL. os SHELL it aoe mn | SHELL COVER ~~ CHANNEL cS ‘TUBBSHEET-FLOATING ‘TUBESHEET-STATIONARY amok Byasal IHPINGEMENT BAFFLE CED) FLOATING HEAD COVER BAPFLES-CROSS 22 BFLS TYPE Sq (H)V.45" 34-9 HCUT@IAM/ARBA) SPACING 230 nm BAFFLE-LONG "SEAL TYPE SUPPORTS-TUBE —U=BEND TYPE BYPASS SEAL ARRANGEMENT GASKETS-SHELL. CHANEL FLOATING HEAD [CODE REQUIREMENTS 7 ASHE soc VM Div T ‘TeHA CLASS [wereir-2acH SHELL —~““-— “ig PIELED WITH WATER kg BUNDLE Kg HEWARKS 1. FROVIDE OVER GESLGH_1 OW DUTY HELL/TOBE. SHEE 2 SRE ea are AT Tone SDE INLET. 4. F | N A L REK JOB NO. 1404 PIB TEC JOB NO. BA-0153 DOCUMENT NO. : ae (TOTAL _21_ SHEETS) 301-2 Data Sheet for Heat Exchangers DOCUMENT TITLE: for others 1725 MTPD UREA PLANT P.T. PUPUK SRIWIDJAJA PALEMBANG - SOUTH SUMATERA INDONESIA P.T. REKAYASA INDUSTRI JAKARTA - INDONESIA @ Toyo Enawesrine Corr TOKYO. JAPAN TEC JOB NO. BA-0153 30 Jun ‘40 03 Apr'90 ee pala = Fe For Approval (P) DATE tu APPROVEDAPPROVED| ea ae BY By ey Ack [BY PUSAL @ Toyo Encweerinc Corporation TOKYO JAPAN TOYO BNGTNEERING CORPORATION WEAT EXCHANGER TOKYO, JAPAR a SPECIFICATION SHEET CUSTORER Pt PUPUR SRIWTDJAIA REV. DATE [MADE [ CHKD.[ AU BLANT LOCATION —PALEMBANG, INDONESIA bo ope ie lag 0B WO. BA-O183, TTEH NO. 2-EA1O2 | 1 larecz, to _azce SERVICE OF UNIT Is Wo.2 Carbamate Condenser aaa) WO. REQ'D WORKING I STAND BY O TOTAL 1 S123 _7270 = 10200 TYPE —V-SPECTAL CONNECTED INT PARALLEL 1 SERIES SURFACE PER UNIT 72ge_n2 SWELLS PER UNIT 7 SURFACE PER SHELL 7258 m2 PERPORMANCE OF ONE UNIT FLUID ALLOCATION SHELL SIDE FLUID WANE a UREA SOL. 4 MIX GAS FLUID QUANTITY TOTAL ) VAPOR [our 34874 pur 3062s LIQUID, 71862 | STEAM WATER NOW=CONDENSABLE TEMPERATURE DENSITY (Vap) DENSITY (Lia) Es VIscosItY (Vap) ViscosITY (Liq) MOLECULAR WEI GHT-VAPORS MOLECULAR WEIGHT-NONCOW THERMAL CON.(Vap) kcal/mhr*C THERMAL CON. (Liq) keal/mhe™C SPRC. HEAT(Vap) ~ kcal/kg" SPEC. HEAT(Liq) kcal/ke*C LATENT HEAT kcal/kg. OPERATING PRESSURE _ke/cm2G VELOCITY n/sec PRESS. DROP, Allow/Cale kg/cm? v.07 7 a.ore FOULING RESIST. mzhr*C/kcal 0. woo2 0, 0002 ia_keal/h 4s HEAT EXCHANGED 13.21 TRANSFER RATE-SERVICE ¥1.0. (Corrected) CLEAN F 3a “kal /mahrec Bhs CONSTRUCTION OF ONE SHELL [SKETCH (BUNDEE/NOZELE ORIENTATION ‘SHELL SIDE TUBE SIDE _| DESIGN PRESSURE ke7ema 18: 2A e x >” Dus BUTOR ‘TEST PRESSURE ke/cnd DESIGN TEMPERATURE “C190 220 NO.PASSES PBR SHELL ONE CORROSION ALLOWANCE a CONNECTIONS IN 3 3 size [OUT Ere & Big. OUT) rating [Tur TUBES NO. 2/86 0.0. $a THK Zo an LENGTH jo,g00 am PITCH 25 un a> 30 | TUBE TYPE HATERIAL SHELL 6035-0. Tb. 7270 PP=2 SHELL COVER CHANNEL cSt OP-12/8-5 nuh on R=4 DEPO. ‘TUBESHEET-FLOATING TUBESHBET- STATIONARY n6USSJerh-4 refo| INPINGENENT BAFFLE YES QD) FLOATING HEAD COVER Sia?) — BAPFLES-CROSS /7 ares TYPHooumee seg. Oe 44.2 SCUTCDIAN/ERED) SPACING Sg om BAFFLE-LONG ‘SEAL TYPE SUPPORTS-TUBE U-BEND TYPE BYPASS SEAL ARRANGEMENT GASKETS-SHELL CHANNEL. FLOATING HEAD ‘CODE REQUIREMENTS TEMA CLASS Rg WEIGHT-GACH SHELL kg FILLED WITH WATER ke BUNDLE ke REMARKS 1.PROVIDE OVER DESIGN 1.0 ON DUTY 1.0 TO ON FLOWS (SHELL/TUBE) [a aE aS XS SOSUOr AREA" 2.20 af 1 2.40 ca TOYO ENGINEERING CORPORATION HEAT EXCHANGER TOKYO, JAPAN SPECIFICATION SHEET [costowee ———pr_ pupae DATE |_wape [CHIL PLANT LOCATION PALEMBAN JOR NO. -BA-OTES iB SeRVICE OF UNTT No.1 Carbanate Condenser ccna aa WO. REQ'D WORKING 1 STAND BY S_TOTAL 1 SIZE 7400 ~ 7 ‘TYPE V-SPECTAL CONNECTED [U1 PARALLEL “TSU SURFACE PER UNIT /fa9 m2 SHELLS PER OWIT SURFACE PER SHELL 7F@9 w2 PERFORMANCE OF ONE_UNIT FLUID ALLOCATION SHELL SIDE TURE SIDE STEAM COND + STERN CARE.SOL. + MIX GAS] "B53500 109892 i ur Irn e7967 our Ss0e8 41925 a8 1353500 ‘825710 WON-CONDENSABLE—ka/ir TEMPERATURE SG: rene 6L 161 183 176 DENSITY (Vap), Ka7ns 3.4 164-7 115.5 DENSITY (Liq) —____ke/a3 | 906, —906 110d 1169 viscosITY (Vap) cP 0.018 0.025 c VIscosITY” (Lia) cr 0-15 0.15) a K WOLECULARWEIGHT-VAPORS ié 23.1 WOLECULAR WEIGHT-HONCON. THERMAL CON. (Vap)_keal/ahr"o 0-07 THERMAL CON. (Liq) kcal /ahr=¢ 0.6 SPEC. HEAT(Vap) keal/kg"C 0.7 SPEC. HEAT(Liq) keal/ke°C 09 LATENT HEAT koal/ke _ ‘OPERATING PRESSURE ke/ca2e Sebacreee 178 VELOCITY afsec PRESS. DROP, Allow/Cale ku /en? ek a 0.02 Gore FOULING RESIST. mZhr*C/kcal 0.0001 0.0002 HEAT EXCHANGED 13.79 Wi keal/ar__ W.T-0,(Gorrected) 26 TRANSFER RATE-SHRVICE Sap CLEAN keal /azhrc COHSTEUCTION OF FE SHELL [SKETCH(BUNDLE/NOZZCE ORIENTATION ‘SHELL SIDE | TUBE SIDE meme | FOE DESIGN PRESSURE Ke/cazGq 3.0 184 > eee aes TEST PRESSURE —kg/enz A 290/"aha DESIGN TEMPERATURE *¢ 200 220 f eee NO. PASSES PER SHELL ‘ONE: ‘ONE ey Pda CORROSION ALLOWANCE aml 3 meso B® CONNECTIONS TW 18 ate | yp size [UT ar ag < 4 C1g. OUT, - eating [TH i i TUBES NO. 2437 0.0. 79 am THK 20 ag LENGTH 7o,300 Fm —h _30.| TUBE TYPE HATERIAL SHELL 0. A 7400 SHELL COVE CHANNEL cpg Like oi_P-4 oepo | TUBESHERT FLOATING oo “STATIONARY 4 C.$. p08 | INPINGEMENT BAFFLE YES FLOATING HEAD COVER cael BAFFLES-CROSS_/7ans TYPEoovsse see 0.45" 44.7 SCUT(DIAN/ERED) SPACING $30 an BAFFLE-LONG SEAL TYPE = SUPPORTS-TUBE O-BEND TYPE - BYPASS SEAL ARRANGEMENT GASKETS-SHELL CHAT FLOATING HEAD CODE REQUIREMENTS HWA eet LAD sees WSIGAT-EACH SHELL Kg FILCED WITH WATER, ¢ BUNDLE: ekg REMARKS 1. PROVIDE OVER DESIGN 1.0 ON DUTY LO 7-1-0 ow FLOWS (SHELL/TUsE 2 BAEELE TO HOLE IA, CLEARANCE TD BE Dl A ALHEAN METAL TENP. SHELL 74 "c ToBE 768.5 °C TOYO ENGINEERING CORPORATION ‘TOKYO , JAPAN HEAT EXCHANGER SPBCIPICATION SHEET ‘CusTOuER PY _PUPUK SRIWIDJAIA DATE [MADE [ CRKD [AU PLANT LOCATION PALEMBANG, INDONESIA. (0 fone /e26 90 | 99 Shinsrh 7? JOB NO. BA-O163 TTEM NO. 2-BK508 =U I (3 (30 snl SERVICE OF UNIT Preheater for 2-DA501 WO. R8Q'D WORKING 1 STAND BY TOTAL 7 t | ‘STZ TYPE SPIRAL, CONNECTED Ti PARALLEL SERIES SURFACE PER UNIT m2_SABLLS PER ONIT SURFACE PER SHELL nz PERFORMANCE OF ONE NTT, FLUID ACLOCATION ASIDE B__Sive FLUID NAME PROCESS CONDENSATE PROCESS CONDENSATE FLUID QUANTITY TOTAL ke7he 33787 x12 27601 x 12 VAPOR, kg/or [IW Liquip ‘ke/or 35787 (our 27601 8 kg/hc, ATER ‘kg/hr NON-CONDENSABLE kg/hr TEMPERATURE zd 148 S DENSITY (Vap) ke/m3. DENSITY (Liq) ke/n3, wae 380 VISCOSITY (Vap) oP. Viscosity (Liq) oP o18 0.43 MOLECULAR WS1GHT-VAPORS_ MOLECULAR WBIGHT-NONCON. THERMAL CON.(Vap) keal/mhr*¢ THERMAL CON.(Liq) keal/mhr*C SPEC. HEAT(Vap) kcal/kg" SPEC. _HBAT(Lia) Keal/kg*c | T tL 1.03 Poe LATENT HEAT keal /kg OPERATING PRESSURE _kg/cu2G VELOCITY n/sec. PRESS. DROP, Allow/Cale kg/cm? TEE FOULING RESIST, m2hr’C/kcal 002 os HEAT BXCHANGED 2.26 x 1.2 WW keal/hr TRANSPER RATS-SHRVICE CLEAN TD. (Corrected) Bc Keal/azhr=c CONSTRUCTION OF ONS SHELL [SKETCH(BUNULE/NOUZLE ORLENTATION ‘A SIDE | 8 3IDB DESIGN PRESSURE kg/en2@ 9 5 ‘TEST PRESSURE —kg/cn2G DESIGN TEMPERATURE —* 176 NO. PASSES PRR SHELL ‘CORROSION ALLOWANCE xf CONNECTIONS IN ¥ 3 SIZ [OUT 3 & (IG. 08) rating [INT TUBES NO. 0. am THK om LENGTH an PETG ry ‘TUBE TYPE MATERIAL. 3048.3. SHELL 3045.S._1.0. im SHELL COVER HANNE, ‘TUBESHSET-FLOATING ‘TUBRSHBET-STATIONARY THPINGENENT BAPPLE ves WO FLOATING HEAD COVER BAPPLES-CROSS BAPFLE-LONG ‘SUPPORTS-TUBE BYPASS SEAL ARRANGEMENT TYPE, HV." ‘SHAL TYPE ‘WCUTCOTANZAREA) SPACING U-BEND am GASKETS-SHELL CHANNEL CODE REQUIREMENTS (ASME Sex Vil Div. 4D A WEIGHT-EACH SHELL ‘———kg FILLED “WITH WATER FLOATING HEAD TEMA CLASS ke BUNDLE, ig. REMARKS 1. PROVIDE OVER DESIGN 1.2 ON DUTY 1.2 71.2 ~ ON FLOWS (SHECL7TUBE) TOYO ENGINEERING CORPORATION WEAT EXCHANGER TOKYO, _JAl SPECIFICATION SHERT CUSTOHER PT_PUPUK SRIWIDJAIA Wev[ pate | WaDE | CHED J AU’ PLANT LOCATION PALENBANG, INDONESIA pes JOB NO. BA-O153 TTEH NO. 2-8K605 4.6 SERVICE OF UNIT aa Preheater for 2-DA502 Gf WO. REQ’ D WORKING I STAND BY © TOTAL i SHE 550 — TYPE_H-BFU CONNECTED I “2 SmRTES | SURFACE POR UNIT 1B) o2 SHELLS PER UWiT 2 SURFACE PER SHELL 968 az ‘PERFORMANCE OF ONS UNIT FLUID_ACLOCATION —_SHBLL SIDE “TORE STE FLUID_NAE PROCESS CONDENSATE PROCESS CONDENSATE FLUID_QUANTITY TOTAL kg/hr 35560 x (2 34768 X12 VAPOR ‘kg/hr [EW ur TW pur LIQUID ‘kg/or | 35560 35560. 34788 34788 STEAK kg/ar as WATER ‘ke/or NON-CONDENSABLE ke/hr TEMPERATURE “CK 860 167.3 id A _167- DENSITY (Vap) Ke/as DENSITY (Liq) ke/a3 VISCOSITY (Vap) cP VISCOSITY (Lig) cP MOLECULAR_NBIGHT-VAPORS, NOLKCULAR WEIGHT-NONCOW. THERMAL CON. (Vap) keal/mbr*C THERMAL CON. (Liq) kcal /mhe™C SPEC. HEAT(Vap) — keal/kg*C aaaaeael | SPEC. HEAT(Liq) keal/kg"C | LATENT HEAT kcal /kg OPERATING PRESSURE kg/cu2G Ce Ja LIEN VELOCITY n/sec 2. PRESS.DROP, Allow/Calc ke/cn2 | A 0.6 0.5 T O50 FOULING RESIST. a2hr°C/kcal 0.000% 7.0002 HEAT EXCHANGED 1.5712 WH Keal/hr ¥.1.0.(Gorrected) TRANSESR RATE-SERVICE 4 CLEAN Keal CONSTRUCTION OF ONE SHELL ISKETCACBUNDLE/NOZZLE ORIENTATION ‘SHELL S108 | TUBE SIDE cee DESIGN PRESSURE kg/om2@(22) a Ga tyr TEST PRESSURE kg/ca: DESIGN TEMPERATURE °C 24074. 220525 ( NO.PASSES PER SHELL [Two ZoUR. f CORROSION ALLOWANCE aol 1 I CONNECTIONS TW = a7 SIZE [OUT 2: a7 & G.1g. OUT) RATING [INT Rid rid saad TUBES NO. 748% 0.0. 79.0 na THK 2.6 mm LENGTA Spo am PITCH an a> 30 TUBE TYPE CU—Tui MATERIAL 3168.8. SHELL. 3168.8. 1.0. 530 am SHBLL COVER CHANNEL 3183.8. ___|-TUBESHEET- FLOATING ‘TUBESHRAT-STATIONARY CSTé SS.) A | TMPINGEMENT BAFFLE (TES) NO FLOATING HEAD COVER BAPPLES-CROSS 12 Grup TYPE SEG BAPPLE-LONG ‘SUPPORTS-TUBE BAL TYPE “Sa U-BEW TYPE HW 45" 31.3 SCUTTAMVAREA) SP BYPASS SEAL. ARRANGEMENT = ssa] GASKETS-SHELL. = SUANNEL FLOATING AHEAD CODE REQUIREMENTS ASHE MDiv ta TEMA CLASS —_B WEIGHT-EACH SHELL LD WITH WATER ke BUNDLE RENARKS 1.PROVIDE OVER DESIGN 1.2 ON DUTY 1.2 T 2 (ON FLOWS: caer @ Toyo Encrnegeine Corporation HEAT EXCHANGER SPECIFIOATION SHEET Peotone STONER, Pr POR SEITE [ore [wade oT] on PUAN LOCATON FALENGANG, THDOWESTA 082 Samo HL) Px WORK NO. BA-0153 WEM_NO._2-HA 405) fe > 74 TuBES BAFFLE CUTTING LE, | NGI TUL 4 $50_1.D. ToTAL «TUBE «NO. M48 TOYO BAGTNBERTNG CORPORATION EAT HRCHANOEE TOKYO, JAPAN spBctFLcATON SueT CUSTOMER _ PT PUPUK SRIWIDJAJA REV. DATE ‘CHKD J AU’ PLANT LOCATION PALEMBANG, INDONESLA 92 Hehinge | SOB AD ROIS HNO TARO SERVICE_OF UNIT Teal 7¥8 Pc Fe HL Flash Gas Condenser NO. RBQ’D WORKING 1 STAND BY TOTAL 1 ‘SIZE 650-3000 TYPE H-AEH ‘CONNECTED INI PARALLEL i SERIES. ‘SURFACE PER UNIT 68.5 m2 SHELLS PER UNIT { SURFACE PER SHELL BS m2 PERFORMANCE OF OWE UNIT FLUID ALLOCATION SHELL SIDE TUBE SIDE ae PLUID NAME. WATER VAPOR COOLING WATER FLUID QUANTITY TOTAL ke/hr 3157 358000 VAPOR kg/hr [TX 3187 OUT ne our a TIQUiD. xe /hr, 3187 STEAM kg/hr WATER keh aa000 350000 NON-CONDENSABLE kg/hr. ‘TEMPERATURE *¢ 94 54 32. 37 DENSITY (Vap) Ka/as eae [paNsrTY (Liq) i = | VISCOSITY (Vap) ViscosITy (Liq) $B MOLECULAR WEIGHT-VAPORS | MOLECULAR WSIGHT-NONCON. THRHAL CON.(Vap) Keal/mhr=G | 0.02 Sala eat THERMAL CON. (Liq) Keal/ahr™C 0,55. SPEC. HEATVap) kcal/kg" |__ 0.46 SPEC, HEAT(Liq) kcal /kg"C iH Eee LATENT HEAT teal eg = = OPERATING PRESSURE _kg/cm2G =5T_ (350 mm HgAD a VELOCITY, n/sec | Eeraca PRESS. DROP, Allow/Cale ke/cn? ORB 0.07 rz 0.5 0.20 FOULING RESIST. Zhr°C/Keal 0.000: 7,000 HEAT EXCHANGED 1.79 Hi keal/nr —¥.T.0. (Corrected) aan *E TRANSFER RATB-SERVICE 79 CLEAN eal /mzhr*c CONSTRUCTION OP ONE SHELL [SKETCH(BUNDLE/NOZZLE ORIENTATION) SHELL SIDE | TUBE SIDE DESIGN PRESSURE kg/ea2g 1.75 FV [7 TEST PRESSURE ke/ca2q DESIGN TEMPBRATURS °C 1307 NO. PASSES PER SHELL Que CORROSION ALLOWANCE a a CONNECTIONS IN 107 10" 7 wet size [OUT Leys? [07] ey EIQ. OUT) L A wa RaTING [INT < = Ho: 4 Ty as ‘ TUBES 0. 294 0.0. 2&4 ua THK 16 mm LENGTH goo0 am PITCH 32 an—d> 90 TUBE TYPE HATERIAL 3048.8. SHELL 3043.35.10. 450 am | SHELL COVER ae CHANNEL ——C.3. TTUBESHEET-FLOATING eats TOBESHEBT-STATIONARY (3048.5) A | TMPINGEMENT BAFFLE YES QU) FLOATING HEAD COVER : BAFFLES-CROSS 6 pres TYPEpauace seg Q45" doe ZCUT (DIAN, SPACING 395 BAFFLE-LONG SEAL TYPE commas SUPPORTS-TUBE U=8eND TYPE. BYPASS SEAL ARRANGEMENT GASKETS-SHELL _ CHANNEL, FLOATING HEAD CODE REQUIREMENTS C pewe Ses. 7 Doel) a THWA CLASS. 5 WEIGHT-EACH SHELL (rut WATER. ke BUNDLE ke ON_ELOWS (SHELL/TUBE) REMARKS 1.PROVIDE OVER DESIG — ON DUTY — (en EAN METAL Teweenarane 5h @ Toxo Enoweeewe Corporation HEAT EXCHANGER TOKYO JAPAN SPECIFICATION SHEET CUSTOMER Pr FOPUK SRIWIDTATA Rev] OaTE [wade [Gro [AUTE]| UNE_WO. PLANT LOCATION PALEMBANG, INDONESIA 0 Po ae Ye [WORK NO. BA-GI53 ITEM NO. 2-ERSO6: ee 54,93,95 02.44, %6 0.9 3 2 ft D Wo cfg at iee=l Lay Woes 52/979 835, cnt - je TOYO ENGINEERING CORPORATION HEAT BECHANGER TOKYO, JAPAN SPACIPICATION SHEET CUSTOMER PT PUPUR SRIWIDIAIA REV] DATE | MADE [caKD | AU: PLANT LOCATION —-PALEMBANG, INDONESIA lo 12 Mo bi sod] eA JOB RO. BA-0153, TTEH WO. ‘2-BASOT. SERVIOHOF UNIT Z Taste Reboiler for 2-DA501 a NO. REQ'D WORKING 1 STAND BY O TOTAL 1 SIZE 1450 - 4000 ‘TYPE V-BEM ‘CONNECTED IN PARALLEL SERIES SURFACE PER UNIT Gog _m2 SHBLLS PER UNIT | SURFACE PER SHELL 53 2 PERFORMANCE OF ONE_UNTT PLOTD_ALLOCATION SHELL SIDE TUBE SIDE FLUID NAME. —_| STE PROCESS CONDENSATE FLUID QUANTITY TOTAL ke/ht TOA 1.3 214529 x62 ‘VAPOR kg/hr {TW IW (OUT 6957 xi2 LIQUID kg/hr 21651 ANE | 67572 KER STEAM ke/ar | Too WATER kg/hr. O40 NON-CONDENSABLE kg/hr ‘TEMPERATURE °c 164.7 isa 146 ae DENSITY (Vap) ka/as DENSITY (Liq) kg/a3 VISCOSITY (Vap) oP VISCOSITY (Lig) cP MOLECULAR WEIGHT-VAPORS MOLECULAR WEIGHT-NONCON. THERNAL CON. (Vap) kcal /ahr*¢ THERMAL CON. (Liq) kcal /ahr™C SPEC. HEAT(Vap) _ keal/kg™C SPHCHBAT(Lig) keal/igc LATENT ABAT kcal/kg a OPERATING PRESSURE ke/cm2G 48 VELOCITY a/sec PRESS DROP, Allow/Cale ke/ena wre. NIL ExS) FOULING RESIST. m2hr°C/kcal 0, 0001 0.000% HEAT EXCHANGED 3.83 x1.2 HM Keal/hr W.T.0.(Corrected 16°C. TRANSFER RATE-SERVICE 905 CLEAN Keal/azherc CONSTRUCTION OF ONS SHELL [SKETCH(BUNULE/NUZELE OKTENTATION SHELL SIDE | TUBE SIDE a8 5 DESIGN PRESSURE kay TEST PRESSURE kg/cm2@_—." DESIGN TEMPERATURE *C{200}a1 a NO.PASSES PER SHELL ‘ONE CORROSION ALLOWANCE aol 3, CONNECTIONS IN a7 - SIZE [OUT 2 & (LIG._OUT; rating [intr ' TUBES NO. 2850 0.0. /2.0un THK \6 um LENGTH 4000 mp PITCH 725 mm a 39 TUBE TYPE MATERIAL 3048.3. | SHELL C.S. LD. 1450 mm | SHELL COVER CHANNEL 3048.3. TUBESHEET-FLOATING | TUBESHERT-STATIONARY (30q-S.S.) a | IMPINGBMENT BAFFLE GEO 40 | FLOATING HEAD COVER BAPFLES-CROSS( 4 0015" TWEE sE¢ 7B 45 420 SCUT@DIAWAREA) SPACING G30.) a BAPFLE-LONG TYPE SUPPORTS-TUBE syppoRT U-BBND TWEE ‘BYPASS SEAL ARRANGEHENT GASKETS-SHBLL. _LHANNE |. FLOATING HEAD CODE REQUIREMENTS, See EBT Ot) @ TEMA CLASS 3 WEIGHT-EACH SHELL. eg PTbED WITH WATER ke BUNDLE HGNARES.[- PROVIDE OVER-DESTGN 1-2 OF DUTY 1-27-12" on FLOWS” (SHELL/TUNE) 2) REQuiRED STATIC peep = 3.9 > El D. 35| NO. PASSES PER SHELL. ‘OnE “ou8. | : 436| CORROSION - ALLOWANCE em o = C sr[ CONNECTIONS [1 Tia 7 vr sl Sze & [OUT Be 7 4 ss|_eaTino__[iwTERNEDIATE 40[ TUBES NO 44 0.0 7 an TER 7.6 mal ENGIN 3000 om PITCH 2f ane OG oS a [ruBe TYPE MATENIAL 3046.8. 42] SHELL SOFS,S. 1D. Y 2SHS mm [SHELL COVER 4s) CHANNEL. S CHANNEL COVER, «| TUBESHEET-STATIONARY SeFS.S.__| TUBESHEET-FLOATING 45| FLOATING HEAD COVER IMPINGEMENT BAFFLE. wo {S5| BAFFLES. CROSS 2B AFIS THEE SEG GD V. «F 2ES MCUTPIMDAREN SPACNG PE aa. <7] BAFFLE-LONC ‘SEAL TYPE. 48| SUPPORTS.TUBE U-BEND TPE 43| BYPASS SEAL ARRANGEMENT. _ 1-9 DUMMY PIPE 50| GASKETS.SHELL ‘CHANNEL. FLOMTING HEAD st| CODE REQUIREMENTS ASHE Se WW piv, 7 TEMA CLASS RG@)C. s2| WEIGHT-EACH SHELL. ig FILLED WITH WATER ig BUNDLE ie sa) REMARKS 5 . D. 85] 2)ME&AN METAL TEMP. HELL SOE se TuRE ABS °c 56 # se sa a @ Toyo Enatvereine Corroration HEAT EXCHANGER TOKYO JAPAN SPECIFICATION SHEET ‘CUSTOMER Pr PUPOK GRIWIDIATA Fev] OaTE] wade [oD] UNE Wo. PLANT LOCATION _PALEMBANG, TNDONESTA 0 PRG Tae HL WORK NO. BA-O153 TeM_NO__ 2-EA5 08 EELE SPACH TING STAGE ‘BAF. CUTTING ToTal ube yo 44

You might also like