Loading Fly Ash PBM
Loading Fly Ash PBM
C LAIN-LAIN
CLEANING JETTY PLN 1 LS 1,000,000.00 1,000,000.00
SUB TOTAL C
GRAND TOTAL
JUMLAH TOTAL
KETERANGAN
SHIFT KERJA
1.00 13,000,000.00
1.00 5,000,000.00
18,000,000.00
7500
15.00 90,000,000.00 PER SHIFT 8 JAM 1500 75,000,000.00
15.00 37,500,000.00 PER SHIFT 8 JAM
15.00 30,000,000.00 PER SHIFT 8 JAM
15.00 39,900,000.00 PER SHIFT 8 JAM
15.00 6,750,000.00 PER SHIFT 8 JAM
15.00 450,000.00 PER SHIFT 8 JAM
15.00 4,500,000.00 PER SHIFT 8 JAM
209,100,000.00 -
C LAIN-LAIN 15,000,000.00
TOTAL : 242,100,000.00
DUA RATUS EMPATPULUH DUA JUTA SERATUS RIBU RUPIAH