You are on page 1of 81

Rev - PROJECT NAME

### SUMMARY
Item Description Quantity Unit Rate Total

1.00 Groundworks 1.00 item £ - £ -

2.00 Brickwork 1.00 item £ - £ -

3.00 Steelwork 1.00 item £ - £ -

4.00 First Fix Carpentry 1.00 item £ - £ -

5.00 Second Fix Carpentry 1.00 item £ - £ -

6.00 Dry-Lining & Plastering 1.00 item £ - £ -

7.00 Painting & Wall Papering 1.00 item £ - £ -

8.00 Tiling 1.00 item £ - £ -

9.00 Floor Finishes 1.00 item £ - £ -

10.00 Roof Finishes & Cladding 1.00 item £ - £ -

11.00 Rainwater Systems 1.00 item £ - £ -

12.00 Architectural Metalwork & Glazing 1.00 item £ - £ -

13.00 Windows & External Doors 1.00 item £ - £ -

14.00 Joinery, Kitchens, Fixtures & Fittings 1.00 item £ - £ -

15.00 Mechanical / Plumbing & Heating 1.00 item £ - £ -

16.00 Electrical 1.00 item £ - £ -

17.00 Utilities 1.00 item £ - £ -

18.00 Hard & Soft Landscaping 1.00 item £ - £ -

19.00 Scaffolding 1.00 item £ - £ -

20.00 Other Items 1.00 item £ - £ -

TOTAL £ -
Rev - PROJECT NAME
1.00 Groundworks

Item Description

1.01 Site Preparation & Excavating

1.01.1

1.01.2

1.01.3

1.01.4

1.01.5

1.01.6

1.01.7

1.01.8

1.01.9

1.01.10

1.01.11

1.02 Foundations

1.02.1

1.03 Below Ground Drainage

1.03.1
Total
ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
£ -
Rev - PROJECT NAME
2.00 Brickwork

Item Description

2.01 External Masonry Walls

2.01.1 Wall Type 1

2.01.2 Wall Type 2

2.01.3 Wall Type 3

2.01.4 Wall Type 4

2.01.5 Wall Type 5

2.01.6 Wall Type 6

2.01.7 Wall Type 7

2.01.8 Wall Type 8

2.01.9 Wall Type 9

2.01.10 Wall Type 10

2.01.11 Wall Type 11

2.02 Internal Masonry Walls

2.02.1 Internal Wall Type 1

2.03 Brickwork Lintels

2.03.1 Lintel Type 1


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
3.00 Steelwork

Item Description

3.01 Structural Steelwork

3.01.1 Column Type 1

3.01.2 Column Type 2

3.01.3 Column Type 3

3.01.4 Column Type 4

3.01.5 Column Type 5

3.01.6 Column Type 6

3.01.7 Column Type 7

3.01.8 Column Type 8

3.01.9 Column Type 9

3.01.10 Column Type 10

3.01.11 Column Type 11

3.02 Structural Steelwork

3.02.1 Beam Type 1

3.03 Design

3.03.1 Steel Connection Design


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
4.00 First Fix Carpentry

Item Description

4.01 Structural Timber

4.01.1 Floor Type 1

4.01.2 Floor Type 2

4.01.3 Floor Type 3

4.01.4 Floor Type 4

4.01.5 Floor Type 5

4.01.6 Floor Type 6

4.01.7 Floor Type 7

4.01.8 Floor Type 8

4.01.9 Floor Type 9

4.01.10 Floor Type 10

4.01.11 Floor Type 11

4.02 Structural Timber

4.02.1 Wall Type 1

4.03 Staircases

4.03.1 Stair Type 1


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
5.00 Second Fix Carpentry

Item Description

5.01 Internal Doors

5.01.1 Door Type 1

5.01.2 Door Type 2

5.01.3 Door Type 3

5.01.4 Door Type 4

5.01.5 Door Type 5

5.01.6 Door Type 6

5.01.7 Door Type 7

5.01.8 Door Type 8

5.01.9 Door Type 9

5.01.10 Door Type 10

5.01.11 Door Type 11

5.02 Skirting

5.02.1 Skirting Type 1

5.03 Window Boards

5.03.1 Window Board Type 1


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
6.00 Dry-Lining & Plastering

Item Description

6.01 Walls

6.01.1 Wall Type 1

6.01.2 Wall Type 2

6.01.3 Wall Type 3

6.01.4 Wall Type 4

6.01.5 Wall Type 5

6.01.6 Wall Type 6

6.01.7 Wall Type 7

6.01.8 Wall Type 8

6.01.9 Wall Type 9

6.01.10 Wall Type 10

6.01.11 Wall Type 11

6.02 Ceilings

6.02.1 Ceiling Type 1

6.03 Details

6.03.1 Boxing in of SVP/RWP Pipes


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
7.00 Painting & Wall Papering

Item Description

7.01 Wall Finishes

7.01.1 Paint Finish Type 1

7.01.2 Paint Finish Type 2

7.01.3 Paint Finish Type 3

7.01.4 Paint Finish Type 4

7.01.5 Paint Finish Type 5

7.01.6 Paint Finish Type 6

7.01.7 Paint Finish Type 7

7.01.8 Paint Finish Type 8

7.01.9 Paint Finish Type 9

7.01.10 Paint Finish Type 10

7.01.11 Paint Finish Type 11

7.02 Ceiling Finishes

7.02.1 Ceiling Type

7.03 Timber Treatment / Finishes

7.03.1 Skirtings
ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Rev - PROJECT NAME
8.00 Tiling

Item Description

8.01 Tile Wall Finishes

8.01.1 Tile Type 1

8.01.2 Tile Type 2

8.01.3 Tile Type 3

8.01.4 Tile Type 4

8.01.5 Tile Type 5

8.01.6 Tile Type 6

8.01.7 Tile Type 7

8.01.8 Tile Type 8

8.01.9 Tile Type 9

8.01.10 Tile Type 10

8.01.11 Tile Type 11

8.02 Tile Floor Finishes

8.02.1 Tile Type 1

8.03 Details

8.02.3 EO Shower Niche


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
9.00 Floor Finishes

Item Description

9.01 Timber Flooring

9.01.1 Timber Floor Type 1

9.01.2 Timber Floor Type 2

9.01.3 Timber Floor Type 3

9.01.4 Timber Floor Type 4

9.01.5 Timber Floor Type 5

9.01.6 Timber Floor Type 6

9.01.7 Timber Floor Type 7

9.01.8 Timber Floor Type 8

9.01.9 Timber Floor Type 9

9.01.10 Timber Floor Type 10

9.01.11 Timber Floor Type 11

9.02 Carpeting

9.02.1 Carpet Type 1

9.03 Door Thresholds

9.03.1 Door Threshold Type 1


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
10.00 Roof Finishes & Cladding

Item Description

10.01 Slate Roofing

10.01.1 Slate Roofing Type 1

10.01.2 Slate Roofing Type 2

10.01.3 Slate Roofing Type 3

10.01.4 Slate Roofing Type 4

10.01.5 Slate Roofing Type 5

10.01.6 Slate Roofing Type 6

10.01.7 Slate Roofing Type 7

10.01.8 Slate Roofing Type 8

10.01.9 Slate Roofing Type 9

10.01.10 Slate Roofing Type 10

10.01.11 Slate Roofing Type 11

10.02 Flat Roofing

10.02.1 Flat Roofing Type 1

10.03 Details

10.03.1 Waterpoofing to SVP penetrations


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
11.00 Rainwater Systems

Item Description

11.01 Rainwater Pipes/Systems

11.01.1 Rainwater Pipe Type 1

11.01.2 Rainwater Pipe Type 2

11.01.3 Rainwater Pipe Type 3

11.01.4 Rainwater Pipe Type 4

11.01.5 Rainwater Pipe Type 5

11.01.6 Rainwater Pipe Type 6

11.01.7 Rainwater Pipe Type 7

11.01.8 Rainwater Pipe Type 8

11.01.9 Rainwater Pipe Type 9

11.01.10 Rainwater Pipe Type 10

11.01.11 Rainwater Pipe Type 11

11.02 Guttering

11.02.1 Guttering Type 1

11.03 Outlets/Details

11.03.1 Rainwater Outlet Type 1


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
12.00 Architectural Metalwork & Glazing

Item Description

12.01 Glass Balustrades

12.01.1 Balustrade Type 1

12.01.2 Balustrade Type 2

12.01.3 Balustrade Type 3

12.01.4 Balustrade Type 4

12.01.5 Balustrade Type 5

12.01.6 Balustrade Type 6

12.01.7 Balustrade Type 7

12.01.8 Balustrade Type 8

12.01.9 Balustrade Type 9

12.01.10 Balustrade Type 10

12.01.11 Balustrade Type 11

12.02 Metalwork Railings

12.02.1 Railing Type 1

12.03 Metalwork Gates

12.03.1 Gate Type 1


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
13.00 Windows & External Doors

Item Description

13.01 Windows

13.01.01 Window Type 1

13.01.02 Window Type 2

13.01.03 Window Type 3

13.01.04 Window Type 4

13.01.05 Window Type 5

13.01.06 Window Type 6

13.01.07 Window Type 7

13.01.08 Window Type 8

13.01.09 Window Type 9

13.01.10 Window Type 10

13.01.11 Window Type 11

13.02 External Doors

13.02.1 External Door Type 1

13.03 Sliding Doors

13.03.1 External Sliding Door Type 1


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
14.00 Joinery, Kitchens, Fixtures & Fittings

Item Description

14.01 Kitchens

14.01.1 Kitchen Type 1

14.01.2 Kitchen Type 2

14.01.3 Kitchen Type 3

14.01.4 Kitchen Type 4

14.01.5 Kitchen Type 5

14.01.6 Kitchen Type 6

14.01.7 Kitchen Type 7

14.01.8 Kitchen Type 8

14.01.9 Kitchen Type 9

14.01.10 Kitchen Type 10

14.01.11 Kitchen Type 11

14.02 Bedroom Joinery

14.02.1 Wardrobe Type 1

14.03 Bathroom Joinery

14.03.1 Vanity Unit Type 1


OJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
15.00 Mechanical / Plumbing & Heating

Item Description

15.01 Mechanical and Public Health

15.01.1 Above Ground Drainage

15.01.2 Hot and Cold Water System Distribution

15.01.3 Heating Installations and Controls

15.01.4 Gas Installations

15.01.5 Wet Underlfoor Heating System

15.01.6 Installation of Sanittaryware

15.01.7 Supply of Sanitaryware

15.01.8 Testing and Commissioning

15.01.9 BWIC

15.01.10 Prelims

15.01.11 Design / Working Drawings


ROJECT NAME

Quantity Unit Rate Total

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

weeks £ - £ -

1.00 item £ - £ -
Total £ -
Rev - PROJECT NAME
16.00 Electrical

Item Description

16.01 Electrical

16.01.1 Mains Power Distribution

16.01.2 Small Power

16.01.3 Installaion of Luminaires / Lighiting

16.01.4 Supply of Luminaires / Lighiting

16.01.5 Lighitng Controls

16.01.6 Power Supplies to Heating and Mechanical Services

16.01.7 Smoke / Heat Detection

16.01.8 Door Access / Control Systems

16.01.9 Data and Telecoms

16.01.10 Bathroom and Kitchen Ventilation Systems

16.01.11 Satelite, Aerials, and TV Points

16.01.12 AV Installation

16.01.13 Installation of External Luminaires / Lighting

16.01.14 Supply of of External Luminaires / Lighting

16.01.15 Electric Underfloor Heating System

16.01.16 Lightning Protection

16.01.16 Testing and Commissioning

16.01.17 BWIC

16.01.18 Prelims

16.01.19 Design / Working Drawings


ROJECT NAME

Quantity Unit Rate Total

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

weeks £ - £ -

1.00 item £ - £ -
Total £ -
Rev - PROJECT NAME
17.00 Utilities

Item Description

17.01 Electric

17.02 Water

17.03 Gas

17.04 Data / Telecoms


ROJECT NAME

Quantity Unit Rate Total

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -

1.00 item £ - £ -
Total £ -
Rev - PROJECT NAME
18.00 Hard & Soft Landscaping

Item Description

18.01 Fencing

18.01.1 Fence Type 1

18.01.2 Fence Type 2

18.01.3 Fence Type 3

18.01.4 Fence Type 4

18.01.5 Fence Type 5

18.01.6 Fence Type 6

18.01.7 Fence Type 7

18.01.8 Fence Type 8

18.01.9 Fence Type 9

18.01.10 Fence Type 10

18.01.11 Fence Type 11

18.02 Paving / External Floor Finishes

18.02.1 Paving Type 1

18.03 Planters

18.03.1 Planter Type 1


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
19.00 Scaffolding

Item Description

19.01 Access Scaffolding

19.01.1 Elevation 1

19.01.2 Elevation 2

19.01.3 Elevation 3

19.01.4 Elevation 4

19.01.5 Elevation 5

19.01.6 Elevation 6

19.01.7 Elevation 7

19.01.8 Elevation 8

19.01.9 Elevation 9

19.01.10 Elevation 10

19.01.11 Elevation 11

19.02 Temporary Roof

19.02.1 Temp Roof To Existing Building

19.03 Temporary Floors

19.03.1 1st Floor Crash Deck


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -

£ - £ -

£ - £ -
Total £ -
Rev - PROJECT NAME
20.00 Other Items

Item Description

20.01 Other Items


ROJECT NAME

Quantity Unit Rate Total

m £ - £ -

m2 £ - £ -

m3 £ - £ -

mm £ - £ -

nr £ - £ -

kg £ - £ -

t £ - £ -

h £ - £ -

pc sum £ - £ -

prov sum £ - £ -

% £ - £ -
Total £ -

You might also like