HOME CONSTRUCTION
BUDGET

PROJECT INFORMATION
Project Name Kitchen Remodel

Take out old flooring, replace with new tile. Finish and trim all new flooring. Replace
Project Description
current cabinets with more modern style. Finish and trim all cabinets.

Contractor Alpine Ski House

Licensed/Bonded Number C#12345678

Contact Name Mike Miller

Website http://www.alpineskihouse.com/

Phone 603-555-0198

Address 789 Smith Street, Bozeman, MT 06030

FINANCIAL STATUS
Cash Amount $3,500

Financed Amount $0 Funds Used To


Date: $2,810.00
Total Allotted Funds $3,500 (80%)
Funds Remaining:
Funds Used To Date $2,810 $690.00 (20%)

Funds Remaining $690

Page 1 of 2
Budget Summary
BUDGET SUMMARY

LIST OF
EXPENSES

PROJECT FUNDS ALLOTTED FUNDS USED TO DATE FUNDS REMAINING


$3,500.00 $2,810.00 $690.00

This shape represents


Item Category Amount
a table slicer. Table
Tile flooring Materials $350.00 slicers are supported
in Excel or later.

Floor glue Materials $75.00 If the shape was


modified in an earlier
Flooring Materials $400.00 version of Excel, or if
the workbook was
saved in Excel 2007
Floor caulking Materials $20.00 or earlier, the slicer
can't be used.
Floor trim Materials $40.00

New cabinets Materials $250.00

Cabinet coating Materials $200.00

Cabinet hardware Materials $100.00

Take out flooring Labor $150.00

Strip flooring glue Labor $50.00

Sand floor Labor $50.00

Prep floor Labor $100.00

Floor installation Labor $200.00

Floor caulking Labor $25.00

Floor trim Labor $50.00

Remove old cabinets Labor $150.00

Prep cabinet area Labor $50.00

Install new cabinets Labor $300.00

Caulk cabinets Labor $100.00

Apply cabinet coating Labor $100.00

Install cabinet hardware Labor $50.00

Total $2,810.00