Pilecap
Excavation
B W depth Quantity Total(m3)
3 Pilecap 1.1 1.1 1.2 16 23.232
4 Pilecap 1.1 1.1 1.2 2 2.904
5 Pilecap 1.4 1.4 1.3 10 25.48
51.616 52M3
Trench
ground beam
B W LENGTH QUANTITY
0.225 0.45 5.25 55 29.23594 30M3
B
3 Pilecap 1.1 1.1 0.05 16 0.968
4 Pilecap 1.1 1.1 0.05 2 0.121
5 Pilecap 1.4 1.4 0.05 10 0.98
2.069 2.55M3
ground beam
B D LENGTH QUANTITY
0.225 0.05 5.25 55 3.248438 30M3
Excavation
B W depth Quantity Total(m3)
3 Pilecap 1.1 1.1 0.75 16 14.52
4 Pilecap 1.1 1.1 0.75 2 1.815
5 Pilecap 1.4 1.4 0.85 10 16.66
32.995 52M3
ground beam
B W LENGTH QUANTITY
0.225 0.45 5.25 55 29.23594 30M3
Formwork
Pilecap
B W depth Quantity Total(m3)
3 Pilecap 1.1 1.1 0.75 16 4 52.8
4 Pilecap 1.1 1.1 0.75 2 4 6.6
5 Pilecap 1.4 1.4 0.85 10 4 47.6
107 110m2
Column stump
B W H QUANTITY
0.5 0.5 0.6 28 4 33.6 34m2
Ground Beam
B W LENGTH QUANTITY
0.225 0.45 5.25 55 2 259.875 260M2
High Tensile(link)
Ground Beam
49
1 2 3 4
Top 2 5.25 4.55 1.35 5.25 1.35 3.85 1.35
1 2 3
Bottom 2 5.25 0.7 5.25 5.25 0.7 5.25 5.25
m kg
72.9 49 3572.1 0.89 3179.169
2
1
Top 3 1.55 4 7.1 33.05 2 66.1
Bottom
T16 2 5.1 2 20.4
Hardcore
B w t
2 5.25 0.15 1.575
Lean con
B w t
2 5.25 0.05 0.525
formwork
lx 5.25 2 10.5
ly 2 2 4
14.5
BRC A7
5.25 2 2 21
Column
concrete
column size 500x500
height 4 metere
no=28
floor=5
b w height
0.5 0.5 4 1 28 28
28 5 140 m3
suspended beam
no= 51
b d length
0.225 0.45 5.25 0.531563 51 27.10969
27.10969 4 108.4388
roof beamG35A
no=45
b d
0.175 0.5 5.25 0.459375 45 20.67188
Formwork
Column
side
floor=5
b w height
0.5 0.5 4 4 8 28 224
224 5 1120
suspended beam
side
sofit
no =51
b d length
0.225 0.45 5.25 2 4.725
sofit
b d length
0.225 0.45 5.25 1 1.18125
upper beam
side
sofit
no =51
b d length
0.45 1 5.25 2 10.5
sofit
b d length
0.45 1 5.25 1 2.3625
12.8625 51 655.9875
roof beam
side
sofit
no =51
b d length
0.175 0.5 5.25 2 5.25
sofit
b d length
0.175 0.5 5.25 1 0.91875
6.16875 45 277.5938
1312.85 4 5251.4
1312.85 1 1312.85
Suspended Beam
49
1 2 3 4
Top 2 5.25 4.55 1.35 5.25 1.35 3.85 1.35
1 2 3
Bottom 2 5.25 0.7 5.25 5.25 0.7 5.25 5.25
m kg
72.9 49 3572.1 0.89 3179.169
2
1
Top 3 1.55 4 7.1 33.05 2 66.1
Bottom
T16 2 5.1 2 20.4
18
T25 1 2 3
Top 3 5.25 5.15 4 1.65 5.25 5.15 1.65
1 2 3 3
Bottom 7 5.25 1.25 5.15
m kg
226.75 18 4081.5 3.85 15713.78
T32 2 3
Bottom 3 5.25 1.35 4 5.25 1.25 3 1.25
m kg
88.7 18 1596.6 6.31 10074.55
T16 1 2
Top 4 4.45 4.45
1 2 3
T20 1
Top 3 3.2
1 2 3
T25 1 2
Top 3 3.2 3.2
1 2
Bottom 4 1.25 5.25 1.55 3 5.25 1.55 5.25
m kg
159.75 33 5271.75 0.89 4691.858
T32 1 2
Bottom 3 5.25 5.25
T12 3277.692
T16 1856.184
T20 782.496
T25 37204.28
T32 17258.48
Roof Beam
T12 1 2 3 4
Top 2 4.55 2 4.55 2 3.85 2 3.85
T16
1 2
Bottom 2 0.85 5.25 0.85 2 0.85 5.25 0.85
m kg
T20 1 2
Top 2 3.2 2 3.2
1 2 3
Bottom 2 5.25 5.25 5.25 5.25
m kg
FORMWORK
SOFFIT
LX LY
5.25 5.25 18 496.125
LX
5.25 6 1.45 2 34.4 49.88
LY
5.25 3 1.45 2 18.65 27.0425
76.9225 2 153.845
EDGE
LX
5.25 6 1.45 2 34.4
LY
5.25 3 1.45 2 18.65
53.05 2 106.1
T16 reinforcement
STAIRCASE
CONCRETE
Slope of staircase 2500^2+2000^2 3200 m
waist 0.225
thread 0.25
no of stairs 7
0.225 3.2 0.25 1
1.72 1 1.72 2 3.44
3.44 6 20.64 G30
LANDING SLAB
thk 0.2
length 1.375
width 1.1
0.3025 4 1.21
LANDING
B D LENGTH
0.2 0.5 1.1 0.11 3 0.33
FORMWORK
SOFFIT
SLOPE WIDTH
3.2 1 3.2 2 6.4 M2
OPEN STRING
1 2 2 +13
1.52 3 4.56
2500 10 1.1 11 2 22
250
Reinforcement
Landing Beam No=4
T12
staircase
T12
3200 10.66667 12
300
T16
1100 6.285714 8
175
Length 1 flight
2 0.5 1.375 3.2 6.95
2 1.375 2.75
2 flight
2 9.7 19.4
1 staircase
19.4 1.58 30.652
STAIRCASE FINISH
20mm thick landing slab
B W
1.375 1.1 1.5125 4 6.05
2.5 2 5
extra nosing
11 2 22
open string
3.2 2 2 12.8
35.6 7 249.2
Roof Slab
concrete
B W no
5.25 5.25 0.1 18 49.6125
edge
5.25 6 5.25 3 47.25
47.25 2 94.5
High Tensile Reinforcement
T10 36
2625 15 15
175
T10-175
15 5.25 78.75
double layer
78.75 2 157.5
T10-200
5250 26.25 26
200
26 2.625 68.25
double layer
68.25 2 136.5
294 36 10584
RC wall
Concrete
5.25 6 5.25 3 47.25
47.25 2 94.5
T10-175
5250 30
175
length bar length
30 18 540 0.7 378
T12
2 5.25 6 63
2 5.25 3 31.5
94.5 2 189
T16-200
vertical out
5250 26.25 28
200
horizontal
4000 20 21
200
21 5.25 18 1984.5
1984.5 1.58 3135.51
3135.51 2 6271.02 both in and out
T16-150
vertical in
5250 35 36
150
construction jpint
5.25 18 94.5
T10 WEIGHT
T16 WEIGHT
weight
1.58 13.5564
2.47 21.736
3.85 182.7788
6.31 221.2286
4
5.25 1.55 5.25 1 88.7
1 111.6
4
35.6
4
9.6
4
9.4
3 4 5
4 5.25 1.55 4 5.25 1.55 5.25 159.75
1 34.5
kena tambah T16
5
2 4.55 0.5 43.7
27.8
12.8
0.5 43