You are on page 1of 20

Elevated Water

Pilecap

Excavation
B W depth Quantity Total(m3)
3 Pilecap 1.1 1.1 1.2 16 23.232
4 Pilecap 1.1 1.1 1.2 2 2.904
5 Pilecap 1.4 1.4 1.3 10 25.48
51.616 52M3
Trench
ground beam
B W LENGTH QUANTITY
0.225 0.45 5.25 55 29.23594 30M3

B
3 Pilecap 1.1 1.1 0.05 16 0.968
4 Pilecap 1.1 1.1 0.05 2 0.121
5 Pilecap 1.4 1.4 0.05 10 0.98
2.069 2.55M3

ground beam
B D LENGTH QUANTITY
0.225 0.05 5.25 55 3.248438 30M3

Excavation
B W depth Quantity Total(m3)
3 Pilecap 1.1 1.1 0.75 16 14.52
4 Pilecap 1.1 1.1 0.75 2 1.815
5 Pilecap 1.4 1.4 0.85 10 16.66
32.995 52M3

B W depth Quantity Total(m3)


3 Pilecap 0.5 0.5 1.2 16 4.8
4 Pilecap 0.5 0.5 1.2 2 0.6
5 Pilecap 0.5 0.5 1.3 10 3.25
8.65

ground beam
B W LENGTH QUANTITY
0.225 0.45 5.25 55 29.23594 30M3

Formwork
Pilecap
B W depth Quantity Total(m3)
3 Pilecap 1.1 1.1 0.75 16 4 52.8
4 Pilecap 1.1 1.1 0.75 2 4 6.6
5 Pilecap 1.4 1.4 0.85 10 4 47.6
107 110m2
Column stump
B W H QUANTITY
0.5 0.5 0.6 28 4 33.6 34m2

Ground Beam

B W LENGTH QUANTITY
0.225 0.45 5.25 55 2 259.875 260M2

High Tensile(link)

B W no of bar length Quantity T12 WEIGHT


3 Pilecap 1.1 1.1 0.66 3 5.06 16 242.88 0.89KG/M
4 Pilecap 1.1 1.1 0.66 4 5.06 2 40.48
5 Pilecap 1.4 1.4 0.66 5 6.26 10 313
0.89 596.36 530.7604

600 3.428571 4.428571


Stump 175
T10 WEIGHT
0.5 4 0.55 2.55 28 5 357 M 0.62Kg/m
0.5 2 0.55 1.6 28 5 224
0.5 2 0.55 1.6 28 5 224
805 0.62 499.1

Ground Beam 5250 21 22


250
0.225 0.45 1.35 0.4 1.75 22 55
0.62 2117.5 1312.85

High Tensile(Main Bar)


Pilecap
T16 WEIGHT
B W depth length no of bar Quantity 1.58Kg/m
3 Pilecap 1.1 1.1 0.75 2.6 16 16 665.6
4 Pilecap 1.1 1.1 0.75 2.6 14 2 72.8
5 Pilecap 1.4 1.4 0.85 3.1 20 10 620
1.58 1358.4 2146.272

Stump anchor no of bar quantity


T16 0.85 0.45 880 0.88 0.4 8 2 8.58
T20 0.85 0.45 1100 1.1 0.4 8 2 8.8
T25 0.85 0.45 1375 1.375 0.4 8 14 47.475
T32 0.85 0.45 1760 1.76 0.4 8 10 35.06

Ground Beam

49
1 2 3 4
Top 2 5.25 4.55 1.35 5.25 1.35 3.85 1.35
1 2 3
Bottom 2 5.25 0.7 5.25 5.25 0.7 5.25 5.25
m kg
72.9 49 3572.1 0.89 3179.169

2
1
Top 3 1.55 4 7.1 33.05 2 66.1

Bottom 2 2.75 5.5 2 11

Bottom
T16 2 5.1 2 20.4

T12 total 3649.2 0.89 3247.788

T16 total 20.4 1.58 32.232

Ground Floor Slab


excavate
B w t
2 5.25 0.15 1.575

Hardcore
B w t
2 5.25 0.15 1.575

Lean con
B w t
2 5.25 0.05 0.525

ground floor slab concrete


B w t
2 5.25 0.15 1.575

formwork
lx 5.25 2 10.5
ly 2 2 4
14.5
BRC A7

5.25 2 2 21

Column
concrete
column size 500x500

height 4 metere
no=28
floor=5
b w height
0.5 0.5 4 1 28 28

28 5 140 m3

suspended beam
no= 51

b d length
0.225 0.45 5.25 0.531563 51 27.10969

27.10969 4 108.4388

roof beamG35A
no=45

b d
0.175 0.5 5.25 0.459375 45 20.67188

Formwork
Column
side
floor=5
b w height
0.5 0.5 4 4 8 28 224

224 5 1120

suspended beam
side
sofit
no =51
b d length
0.225 0.45 5.25 2 4.725

sofit
b d length
0.225 0.45 5.25 1 1.18125

5.90625 51 301.2188 4 1204.875

upper beam
side
sofit
no =51
b d length
0.45 1 5.25 2 10.5

sofit
b d length
0.45 1 5.25 1 2.3625

12.8625 51 655.9875

roof beam
side
sofit
no =51
b d length
0.175 0.5 5.25 2 5.25

sofit
b d length
0.175 0.5 5.25 1 0.91875

6.16875 45 277.5938

600 3.428571 4.428571


Column 175
floor=5 T10 WEIGHT
0.5 4 0.55 2.55 28 5 357 M 0.62Kg/m
0.5 2 0.55 1.6 28 5 224
0.5 2 0.55 1.6 28 5 224
805 0.62 499.1
499.1 5 2495.5
suspended beam 5250 21 22
floor=4 250
0.225 0.45 1.35 0.4 1.75 22 55
0.62 2117.5 1312.85

1312.85 4 5251.4

roof beam 5250 21 22


floor=1 250
0.175 0.5 1.35 0.4 1.75 22 55
0.62 2117.5 1312.85

1312.85 1 1312.85

Stump anchor no of bar quantity


T16 0.85 0.45 880 0.88 0.4 8 2 8.58
T20 0.85 0.45 1100 1.1 0.4 8 2 8.8
T25 0.85 0.45 1375 1.375 0.4 8 14 47.475
T32 0.85 0.45 1760 1.76 0.4 8 10 35.06

T16 13.5564 5 67.782


T20 21.736 5 108.68
T25 182.7788 5 913.8938
T32 221.2286 5 1106.143

Suspended Beam

49
1 2 3 4
Top 2 5.25 4.55 1.35 5.25 1.35 3.85 1.35
1 2 3
Bottom 2 5.25 0.7 5.25 5.25 0.7 5.25 5.25
m kg
72.9 49 3572.1 0.89 3179.169

2
1
Top 3 1.55 4 7.1 33.05 2 66.1

Bottom 2 2.75 5.5 2 11

Bottom
T16 2 5.1 2 20.4

T12 total 3649.2 0.89 3247.788 4 12991.15

T16 total 20.4 1.58 32.232 4 128.928

Beam under wall 5B1

18
T25 1 2 3
Top 3 5.25 5.15 4 1.65 5.25 5.15 1.65
1 2 3 3
Bottom 7 5.25 1.25 5.15
m kg
226.75 18 4081.5 3.85 15713.78
T32 2 3
Bottom 3 5.25 1.35 4 5.25 1.25 3 1.25
m kg
88.7 18 1596.6 6.31 10074.55

Beam slab 5B2


33
T12 1 2 3
Top 6 5.25 4.65 4.05 4.65
1 2 3

T16 1 2
Top 4 4.45 4.45
1 2 3

T20 1
Top 3 3.2
1 2 3

T25 1 2
Top 3 3.2 3.2
1 2
Bottom 4 1.25 5.25 1.55 3 5.25 1.55 5.25
m kg
159.75 33 5271.75 0.89 4691.858

T32 1 2
Bottom 3 5.25 5.25

T12 111.6 33 3682.8


3682.8 0.89 3277.692
T16 35.6 33 1174.8
1174.8 1.58 1856.184
T20 9.6 33 316.8
316.8 2.47 782.496
T25 169.15 33 5581.95
5581.95 3.85 21490.51
T32 34.5 33 1138.5
1138.5 6.31 7183.935

T12 3277.692
T16 1856.184
T20 782.496
T25 37204.28
T32 17258.48

T16 anti crack bar

2 3 5.25 51 1606.5 1.58 2538.27 kena tambah T16

Roof Beam
T12 1 2 3 4
Top 2 4.55 2 4.55 2 3.85 2 3.85

T16

1 2
Bottom 2 0.85 5.25 0.85 2 0.85 5.25 0.85
m kg

T20 1 2
Top 2 3.2 2 3.2
1 2 3
Bottom 2 5.25 5.25 5.25 5.25
m kg

T12 43.7 45 1966.5


T16 27.8 45 1251
T20 55.8 45 2511

T12 1966.5 0.89 1750.185


T16 1251 1.58 1976.58
T20 2511 2.47 6202.17
UPPER FLOOR SLAB G35A
CONCRETE
LX LY THK QUANTITY
5.25 5.25 0.3 18 148.8375

FORMWORK
SOFFIT
LX LY
5.25 5.25 18 496.125

LX
5.25 6 1.45 2 34.4 49.88

LY
5.25 3 1.45 2 18.65 27.0425
76.9225 2 153.845

TOTAL FORMWORK 649.97

EDGE
LX
5.25 6 1.45 2 34.4

LY
5.25 3 1.45 2 18.65

53.05 2 106.1

T16 reinforcement

34400 229.3333 231 18.65 4308.15


150
18650 124.3333 126 34.4 4334.4
150

8642.55 2 17285.1 1.58 27310.46

STAIRCASE
CONCRETE
Slope of staircase 2500^2+2000^2 3200 m
waist 0.225
thread 0.25
no of stairs 7
0.225 3.2 0.25 1
1.72 1 1.72 2 3.44
3.44 6 20.64 G30

LANDING SLAB
thk 0.2
length 1.375
width 1.1

0.3025 4 1.21

LANDING
B D LENGTH
0.2 0.5 1.1 0.11 3 0.33

FORMWORK
SOFFIT
SLOPE WIDTH
3.2 1 3.2 2 6.4 M2

OPEN STRING

1 2 2 +13

SOFIT LANDING SLAB

1.1 1.375 1.5125 4 6.05 M2

SIDES AND SOFIT LANDING BEAM

0.2 0.5 1.1 0.55 2 1.1


0.1 2 0.2
sofit
0.2 0.5 1.1 0.22 1 0.22

1.52 3 4.56

To undercut riser not exceeding 200mm high

2500 10 1.1 11 2 22
250

Reinforcement
Landing Beam No=4

T12 2 1.1 2.2 4 8.8


T16 2 1.1 2.2 4 8.8

T12 8.8 0.89 7.832 5 40


T16 8.8 1.58 13.904 5 70

T12

landing slab No=4


T12
1375 4.583333 6
300

6 1.1 6.6 4 26.4


26.4 0.89 23.496

staircase

T12
3200 10.66667 12
300

6 1.1 6.6 2 13.2


12 1.1 13.2 2 26.4
39.6 0.89 35.244

T16
1100 6.285714 8
175

Length 1 flight
2 0.5 1.375 3.2 6.95
2 1.375 2.75
2 flight
2 9.7 19.4
1 staircase
19.4 1.58 30.652

STAIRCASE FINISH
20mm thick landing slab
B W
1.375 1.1 1.5125 4 6.05

20mm thick riser


2 2 4
20mm thick tread

2.5 2 5

extra nosing

11 2 22

3mm thick skim coating

open string

3.2 2 2 12.8

slopping sofit of staircase

3.2 1.1 2 7.04

sofit landing slab

1.375 1.1 4 6.05

handrail 1000 mm height


1 flight
3.2 1.75 2 1.1 2 8.9
1 stair
8.9 2 17.8
2 35.6
no of stairs=7

35.6 7 249.2

Roof Slab
concrete
B W no
5.25 5.25 0.1 18 49.6125

sofit of roof slab


496.125

edge
5.25 6 5.25 3 47.25

47.25 2 94.5
High Tensile Reinforcement

T10 36

2625 15 15
175
T10-175
15 5.25 78.75
double layer
78.75 2 157.5

T10-200

5250 26.25 26
200

26 2.625 68.25
double layer
68.25 2 136.5

294 36 10584

10584 0.62 6562.08

same sofit roof slab

RC wall
Concrete
5.25 6 5.25 3 47.25

47.25 2 94.5

94.5 0.3 4 113.4

T10-175

5250 30
175
length bar length
30 18 540 0.7 378

378 0.62 234.36

T12
2 5.25 6 63
2 5.25 3 31.5

94.5 2 189

189 0.89 168.21

T16-200
vertical out
5250 26.25 28
200

28 4.9 0.6 154


154 18 2772
2772 1.58 4379.76

horizontal
4000 20 21
200
21 5.25 18 1984.5
1984.5 1.58 3135.51
3135.51 2 6271.02 both in and out

T16-150
vertical in
5250 35 36
150

36 4.9 0.6 198


198 18 3564
3564 1.58 5631.12

Total T16 16281.9

construction jpint

5.25 18 94.5

water proof coating


wall
5.25 4 21
21 18 378
T12 WEIGHT 660
0.89KG/M

T10 WEIGHT

T16 WEIGHT

weight
1.58 13.5564
2.47 21.736
3.85 182.7788
6.31 221.2286

5.25 1.35 4.55 0.6 36.7


4
0.7 5.25 0.6 36.2
T10 WEIGHT
weight
1.58 13.5564
2.47 21.736
3.85 182.7788
6.31 221.2286

5.25 1.35 4.55 0.6 36.7


4
0.7 5.25 0.6 36.2
4
5.25 5.15 1.65 1 138.2
4
1 88.55

4
5.25 1.55 5.25 1 88.7

1 111.6
4

35.6
4

9.6
4

9.4
3 4 5
4 5.25 1.55 4 5.25 1.55 5.25 159.75

1 34.5
kena tambah T16

5
2 4.55 0.5 43.7

27.8

12.8

0.5 43