A. Overview of Design (SUMMARY)
1. Design Standard
- The present structure of the bill is based on applying a fixed load and our hypothesis construction standard specification
⊙ mold load: 50 kg / m2
2. Applicable criteria
1) the steel computed norms and commentary of the Architectural Institute of Korea
3) Hypothesis construction standard specifications, base on the Ministry of Construction and Transportation
4) Construction formwork. Shore design and construction guidelines, base on the Ministry of Construction and Transportation
*. My advice site
- Lateral load has been made for more than 2% of the dead load acts on the upper Shore
= 6550 KG/M²
-We made an asumption for the operation of the source, load equipment, and other lightweight concrete
It includes the construction load and shock loading of materials and tools, etc.
System Support Review
1) Figure
Thickness: 2.6 mm
Fy = 3.3 t / cm2
As reviewed above, Load acting on the holding 1 set = 1.575 Ton <5.52 Ton holding allowable compressive strength. Because this data, the conclusion: it is safe with
respect to various construction conditions.
* Designers Shore allowable stress of performance, load performance test of the hypothesis
Consider ation safety factor of 2.5 for the performance test measurement strength.
One part (P) per performance certificate test report P-17 maximum compressive load 94 kN = 9,212Kg.
9,212 kg maximum compressive load,
Pa (1 per load acting set) = 3290 kg
STK 500 - the thickness of the steel pipe (mm) less than 40 - 210 (Mpa) = R / at ≤ 40
a: 1 + Φ / 10